Note : Jumat
Safety Talk
D Available
No. Unit Heavy Equip. Code WH STB EWH B/D PA UA MA Remarks
O Hours
Z 1 D6R DZ-01 744 487.66 256.35 413.26 74.40 90% 62% 85%
E 2 D6G DZ-02 744 487.66 256.35 450.46 37.20 95% 64% 92%
R
Average 744 487.66 256.35 413.26 74.40 85% 62% 90%
Available
No. Unit Heavy Equip. Code WH STB EWH B/D PA UA MA Remarks
Hours
1 Zaxis 210 EX-01 744 410.52 333.48 336.12 74.40 90% 50% 90%
S
2 Zaxis 210 EX-02 744 410.52 333.48 336.12 74.40 90% 50% 90%
U
P 3 Zaxis 210 EX-03 744 410.52 333.48 336.12 74.40 90% 50% 90%
P 4 MG CAT 120K MG-02 744 410.52 333.48 -333.48 744.00 0% 0% 0%
O 5 Compact CP-01 744 410.52 333.48 298.92 111.60 85% 85%
47%
R
6 Water Truck WT-01 744 410.52 333.48 336.12 74.40 90% 50% 95%
T
7 Tower Lamp 7 Unit 744 2873.62 2604.00 2604.00 0.00 100% 50% 95% Support All Unit
8 Deatering Pump CP-01 744 95%
Average 744 410.52 333.48 194.76 215.76 47% 37% 71%
Available
No. Unit DT Code WH STB EWH B/D PA UA MA Remarks
Hours
1 DT FUSO 01 DT 01 744 410.52 333.48 85.68 324.84 56% 20% 21%
2 DT FUSO 02 DT 02 744 410.52 333.48 377.20 33.31 96% 53% 92%
3 DT FUSO 03 DT 03 744 410.52 333.48 339.26 71.25 90% 50% 83%
4 DT FUSO 04 DT 04 744 410.52 333.48 307.59 102.93 86% 48% 75%
5 DT FUSO 05 DT 05 744 410.52 333.48 287.41 123.11 83% 46% 70%
6 DT FUSO 06 DT 06 744 410.52 333.48 396.83 13.68 98% 54% 97%
7 DT FUSO 07 DT 07 744 410.52 333.48 0.00 410.52 0% 0% 0%
8 DT FUSO 08 DT 08 744 410.52 333.48 381.90 28.61 96% 53% 93%
9 DT FUSO 09 DT 09 744 410.52 333.48 373.86 36.65 95% 53% 91%
10 DT FUSO 10 DT 10 744 410.52 333.48 354.72 55.80 92% 52% 86%
11 DT FUSO 11 DT 11 744 410.52 333.48 392.61 17.90 98% 54% 96%
12 DT FUSO 12 DT 12 744 410.52 333.48 0.00 410.52 0% 0% 0%
D
T
13 DT FUSO 13 DT 13 744 410.52 333.48 298.92 111.60 85% 47% 73%
14 DT FUSO 14 DT 14 744 410.52 333.48 261.72 148.80 80% 44% 64%
15 DT FUSO 15 DT 15 744 410.52 333.48 405.94 4.58 99% 55% 99%
16 DT FUSO 16 DT 16 744 410.52 333.48 9.73 400.79 46% 3% 2%
17 DT FUSO 17 DT 17 744 410.52 333.48 354.44 56.08 92% 52% 86%
18 DT FUSO 18 DT 18 744 410.52 333.48 395.65 14.87 98% 54% 96%
19 DT FUSO 19 DT 19 744 410.52 333.48 382.73 27.79 96% 53% 93%
20 DT FUSO 20 DT 20 744 410.52 333.48 332.35 78.17 89% 50% 81%
21 DT FUSO 21 DT 21 744 410.52 333.48 311.16 99.35 87% 48% 76%
22 DT FUSO 22 DT 22 744 410.52 333.48 0.00 410.52 0% 0% 0%
23 DT FUSO 23 DT 23 744 410.52 333.48 347.26 63.26 91% 51% 85%
24 DT FUSO 24 DT 24 744 410.52 333.48 372.47 38.05 95% 53% 91%
25 DT FUSO 25 DT 25 744 410.52 333.48 150.12 260.40 65% 31% 37%
Excavator
3 PTY (EX) Prod.
No. Unit Heavy Equip. Code PA UA BC (M ) Bf (%) Sf (%) Ct (Detik) Ek (%) EWH Remarks
BCM/H BCM/Month
1 Zaxis 350-04 EX-04 95% 53% 1.70 90% 81% 25 75% 241.15 133 32,073 Fleet OB (tgl 01-20 Juli)
EX OB 2 Zaxis 350-06 EX-06 95% 53% 1.70 90% 81% 25 75% 373.32 133 49,651 Fleet OB
3 Cat 330-01 EX 01 95% 53% 1.70 90% 81% 25 75% 373.32 133 49,651 Fleet OB
4 Cat 330-02 EX 02 95% 53% 1.70 90% 81% 25 75% 373.32 133 49,651 Fleet OB
TOTAL 532 181,027 Production capability
3 D6R DZ-01 90% 62% 3.06 1% 81% 35 85% 413.26 215.82 89,188.51
Support Disposal
4 D6G DZ-02 95% 64% 3.06 1% 81% 35 85% 450.46 215.82 97,217.00
Total Doozing 431.64 186,406 Kemampuan Dozing
SUPPORT
5 MG CAT 120K MG-02 0% 0% 0.00 Support Front & Jalan
6 Water Truck WT-01 90% 50% 336.12 Penyiraman Tambang
7 Tower Lamp 7 Unit 100% 100% 2,604.00
8 Deatering Pump CP-01 180.00
8 Bus 2 Unit
9 Light Vehicle 6 Unit
35
Dump Truck 102
Match Factor
PTY(EXC) PTY(DT) Match
No. Unit Heavy Equip. Code Jumlah DT Distance (m)
BCM/H BCM/H Factor
1 Zaxis 350-04 EX-04 133 162 5 1.22 1000
Fleet OB 2 Zaxis 350-06 EX-06 133 130 4 0.97 1000
3 Cat 330-01 EX 01 133 130 4 0.97 1000
4 Cat 330-02 EX 02 133 130 4 0.97 1000
TOTAL PRODUCTIVITY 532 550 17 1.03
Grand Total 160,098.91 295,684.35 1.85 42.13 16.20 3.39 41.66 38.75 0.19 5,416 3,768 7.05 6.48 1.22
Note
Top surface : NONMISS(230624_PRO,230624_ORI,CNT_TOPO_1M)
Bot surface : Seq_PSL_0723_R7
Loss thick : 0.2 m
Min Thick : > 0.5 m
Prepare : Minescape 5.7
Thick Soil :1m
PT. Pertambangan Prima Nusantara
Pauh, AJC Coal Project
Remining PIT SL
PIT
Waste (BCM) Coal (MT) SR
PIT SL - - #DIV/0!
TOTAL - - #DIV/0!
Remarks
1. Calculated by Minescape 5.7
Fleet CG 2. Project JCP_resource_model_final_161118
3. Reserve Parameter :
Fleet OB
a. Waste = TOTBURDVOLUME (Batasan Underburden SL)
Fleet OB & CG b. Coal = INTRRMASS
d. Loss Interval = 0.20 m
e. Sample Density 20 sq
Note: