MONTHLY PRODUCTION PLAN

SEQUEN JULI 2023

Engineering Dept.
PT Pertambangan Prima Nusantara
AJC & SAS Coal Project
PT. PERTAMBANGAN PRIMA NUSANTARA
Pauh, AJC Coal Project

Working Hours Plan


Effective Working Hours JuLI 2023
Description Unit TOTAL Day
1-31 JuLI 2023
Calender day Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 31.00 1
Holiday Day -
Available day Day 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 31.00 1.00
Shift/Day 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 62.00 2.00
Hours/Shift 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 372.00 12.00
Available Hours Hour 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 744.00 24.00
Total Stand by (Loss time) Hour 10.54 10.54 10.54 11.21 10.54 10.54 11.54 10.54 10.54 10.54 11.21 10.54 10.54 11.54 10.54 10.54 10.54 11.21 10.54 10.54 11.54 10.54 10.54 10.54 11.21 10.54 10.54 11.54 10.54 10.54 10.54 333.48 10.54
Rain 223.2 Mnt/day Mnt 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 223.25 115.35 223.25
Slippery 40% Rain hour Mnt 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 89.30 46.14 89.30
Shift change 30 Mnt/shift Mnt 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 31.00 60.00
Meal & rest time 60 Mnt/shift Mnt 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 120.00 62.00 120.00
Friday pray 60 Mnt/Week Mnt 60.00 60.00 60.00 60.00 4.00
Safety talk 40 Mnt/Week Mnt 40.00 40.00 40.00 40.00 2.67
P5M 10 Mnt/shift Mnt 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.33 20.00
P2H unit 10 Mnt/shift Mnt 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.33 20.00
Mainte Front &Disp 20 Mnt/shift Mnt 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 20.67 40.00
Refueling & greasing 60 Mnt/Day Mnt 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 31.00 60.00
Other 0 Mnt/Shift Mnt -
USABLE HOURS (WH) Hour 13.46 13.46 13.46 12.79 13.46 13.46 12.46 13.46 13.46 13.46 12.79 13.46 13.46 12.46 13.46 13.46 13.46 12.79 13.46 13.46 12.46 13.46 13.46 13.46 12.79 13.46 13.46 12.46 13.46 13.46 13.46 410.52 13.46

Note : Jumat
Safety Talk

Rain & Slippery


Plan Rain & Slippery Juli 2023
Description TOTAL Day
1-31 Juli 2023
Calender Day Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 31 1
Rain (Jam) Jam 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 115 3.72
Slippery (%) 40% 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 46 1.49
Rainfall (Day) mm 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 0.00 0.00 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 11.23 326 11.23
PT. PERTAMBANGAN PRIMA NUSANTARA
Site AJC Pauh - Sarolangun Jambi
669.60

PLAN PERFORMANCE UNIT


Available
No. Unit Heavy Equip. Code WH STB EWH B/D PA UA MA Remarks
Hours
1 Zaxis 330-01 EX-01 744 592.67 151.33 518.27 74.40 90% 77% 87%
2 Zaxis 330-02 EX 02 744 410.52 333.48 298.92 111.60 85% 47% 73%
3 Zaxis 330-03 EX-03 744 592.67 333.48 298.92 111.60 85% 47% 73%
E
4 Zaxis 350-04 EX-04 744 592.67 333.48 373.32 37.20 95% 53% 91%
X
5 Zaxis 350-05 EX-05 744 592.67 333.48 373.32 37.20 95% 53% 91%
6 Zaxis 350-06 EX-06 744 592.67 333.48 373.32 37.20 95% 53% 91%
8 Cat 330-01 EX 01 744 592.67 333.48 373.32 37.20 95% 53% 91%
9 Cat 330-02 EX 02 744 592.67 333.48 373.32 37.20 95% 53% 91%
Average 744 547.13 287.95 372.35 83.70 82% 56% 89%

D Available
No. Unit Heavy Equip. Code WH STB EWH B/D PA UA MA Remarks
O Hours
Z 1 D6R DZ-01 744 487.66 256.35 413.26 74.40 90% 62% 85%
E 2 D6G DZ-02 744 487.66 256.35 450.46 37.20 95% 64% 92%
R
Average 744 487.66 256.35 413.26 74.40 85% 62% 90%

Available
No. Unit Heavy Equip. Code WH STB EWH B/D PA UA MA Remarks
Hours
1 Zaxis 210 EX-01 744 410.52 333.48 336.12 74.40 90% 50% 90%
S
2 Zaxis 210 EX-02 744 410.52 333.48 336.12 74.40 90% 50% 90%
U
P 3 Zaxis 210 EX-03 744 410.52 333.48 336.12 74.40 90% 50% 90%
P 4 MG CAT 120K MG-02 744 410.52 333.48 -333.48 744.00 0% 0% 0%
O 5 Compact CP-01 744 410.52 333.48 298.92 111.60 85% 85%
47%
R
6 Water Truck WT-01 744 410.52 333.48 336.12 74.40 90% 50% 95%
T
7 Tower Lamp 7 Unit 744 2873.62 2604.00 2604.00 0.00 100% 50% 95% Support All Unit
8 Deatering Pump CP-01 744 95%
Average 744 410.52 333.48 194.76 215.76 47% 37% 71%

Available
No. Unit DT Code WH STB EWH B/D PA UA MA Remarks
Hours
1 DT FUSO 01 DT 01 744 410.52 333.48 85.68 324.84 56% 20% 21%
2 DT FUSO 02 DT 02 744 410.52 333.48 377.20 33.31 96% 53% 92%
3 DT FUSO 03 DT 03 744 410.52 333.48 339.26 71.25 90% 50% 83%
4 DT FUSO 04 DT 04 744 410.52 333.48 307.59 102.93 86% 48% 75%
5 DT FUSO 05 DT 05 744 410.52 333.48 287.41 123.11 83% 46% 70%
6 DT FUSO 06 DT 06 744 410.52 333.48 396.83 13.68 98% 54% 97%
7 DT FUSO 07 DT 07 744 410.52 333.48 0.00 410.52 0% 0% 0%
8 DT FUSO 08 DT 08 744 410.52 333.48 381.90 28.61 96% 53% 93%
9 DT FUSO 09 DT 09 744 410.52 333.48 373.86 36.65 95% 53% 91%
10 DT FUSO 10 DT 10 744 410.52 333.48 354.72 55.80 92% 52% 86%
11 DT FUSO 11 DT 11 744 410.52 333.48 392.61 17.90 98% 54% 96%
12 DT FUSO 12 DT 12 744 410.52 333.48 0.00 410.52 0% 0% 0%
D
T
13 DT FUSO 13 DT 13 744 410.52 333.48 298.92 111.60 85% 47% 73%
14 DT FUSO 14 DT 14 744 410.52 333.48 261.72 148.80 80% 44% 64%
15 DT FUSO 15 DT 15 744 410.52 333.48 405.94 4.58 99% 55% 99%
16 DT FUSO 16 DT 16 744 410.52 333.48 9.73 400.79 46% 3% 2%
17 DT FUSO 17 DT 17 744 410.52 333.48 354.44 56.08 92% 52% 86%
18 DT FUSO 18 DT 18 744 410.52 333.48 395.65 14.87 98% 54% 96%
19 DT FUSO 19 DT 19 744 410.52 333.48 382.73 27.79 96% 53% 93%
20 DT FUSO 20 DT 20 744 410.52 333.48 332.35 78.17 89% 50% 81%
21 DT FUSO 21 DT 21 744 410.52 333.48 311.16 99.35 87% 48% 76%
22 DT FUSO 22 DT 22 744 410.52 333.48 0.00 410.52 0% 0% 0%
23 DT FUSO 23 DT 23 744 410.52 333.48 347.26 63.26 91% 51% 85%
24 DT FUSO 24 DT 24 744 410.52 333.48 372.47 38.05 95% 53% 91%
25 DT FUSO 25 DT 25 744 410.52 333.48 150.12 260.40 65% 31% 37%

Average 744 410.52 333.48 286.93 123.59 77% 46% 83%


PT. PERTAMBANGAN PRIMA NUSANTARA
Site AJC Pauh - Sarolangun Jambi

PRODUCTION PLAN JULI 2023


PIT SL
LOADER HAULER TARGET BASED ON PROD. UNIT DT
PROD. UNIT EXCA
Target Coal 82,141 83,796 MT INVENTORY PIT
Target OB 181,026.53 182,088 BCM OB COAL OB COAL OB COAL
SR 2.20 (Bcm) (mt) (Bcm) (Mt) (Lcm) (Mt)
181,027 82,141 182,088 83,796

Excavator
3 PTY (EX) Prod.
No. Unit Heavy Equip. Code PA UA BC (M ) Bf (%) Sf (%) Ct (Detik) Ek (%) EWH Remarks
BCM/H BCM/Month
1 Zaxis 350-04 EX-04 95% 53% 1.70 90% 81% 25 75% 241.15 133 32,073 Fleet OB (tgl 01-20 Juli)
EX OB 2 Zaxis 350-06 EX-06 95% 53% 1.70 90% 81% 25 75% 373.32 133 49,651 Fleet OB
3 Cat 330-01 EX 01 95% 53% 1.70 90% 81% 25 75% 373.32 133 49,651 Fleet OB
4 Cat 330-02 EX 02 95% 53% 1.70 90% 81% 25 75% 373.32 133 49,651 Fleet OB
TOTAL 532 181,027 Production capability

PTY (EX) Prod.


No. Unit Heavy Equip. Code PA UA BC (M3) Bf (%) Sf (%) Ct (Detik) Ek (%) EWH Remarks
MT/H MT/Month
EX CG 1 Zaxis 350-05 EX-05 95% 53% 1.70 80% 89% 25 75% 373.32 163 60,664.01 Fleet CG
2 Zaxis 350-04 EX-04 95% 53% 1.70 80% 89% 25 75% 132.17 163 21,477.02 Fleet CG (Tanggal 21-31 Juli)
TOTAL 325 82,141 Production capability

3 PTY (EX) Prod.


No. Unit Heavy Equip. Code PA UA BC (M ) Bf (%) Sf (%) Ct (Detik) Ek (%) EWH Remarks
MT/H MT/Month
1 Zaxis 330-03 EX-03 85% 47% 1.7 80% 89% 25 60% 481.07 125 60,133.33 Loading Coal
EX COAL 2 Zaxis 210 EX-01 90% 50% 0.80 80% 89% 20 60% 336.12 75 25,208.78 Loading Coal
ROM Total Loading ROM 288 85,342.11 Kemampuan Loading
1 Zaxis 330-02 EX 02 90% 77% 80% 481.07 60 23,091.20 Only Sizing Coal
2 Zaxis 330-01 EX-01 90% 77% 2.00 90% 89% 59 80% 518.27 100 51,826.67 Only Crusher Coal
Total Crusher & Sizing Coal 160 74,917.87 Kemampuan Crusher & Sizing

PTY (EX) Prod.


No. Unit Heavy Equip. Code PA UA EWH Remarks
BCM/H MT/Month
1 Zaxis 210 EX-02 90% 50% 336.12 Support Dump CG & General PIT
2 Zaxis 210 EX-03 90% 50% 336.12 Support Kerok Vessel & Disposal

3 D6R DZ-01 90% 62% 3.06 1% 81% 35 85% 413.26 215.82 89,188.51
Support Disposal
4 D6G DZ-02 95% 64% 3.06 1% 81% 35 85% 450.46 215.82 97,217.00
Total Doozing 431.64 186,406 Kemampuan Dozing
SUPPORT
5 MG CAT 120K MG-02 0% 0% 0.00 Support Front & Jalan
6 Water Truck WT-01 90% 50% 336.12 Penyiraman Tambang
7 Tower Lamp 7 Unit 100% 100% 2,604.00
8 Deatering Pump CP-01 180.00

8 Bus 2 Unit
9 Light Vehicle 6 Unit

35
Dump Truck 102

Vessel PTY (DT) Prod.


No. Unit Heavy Equip. Code PA UA Swell Factor CT (menit) Ek (%) EWH Remarks
Capacity BCM/H BCM/Month
1 DT FUSO 04 DT 04 86% 48% 81% 10.38 80% 7 307.59 32.38 9,960
2 DT FUSO 08 DT 08 96% 53% 81% 10.38 80% 7 381.90 32.38 12,367
3 DT FUSO 09 DT 09 95% 53% 81% 10.38 80% 7 373.86 32.38 12,106 1 Fleet OB AJC Blok barat
4 DT FUSO 11 DT 11 98% 54% 81% 10.38 80% 7 392.61 32.38 12,714
5 DT FUSO 21 DT 21 87% 48% 81% 10.38 80% 7 311.16 32.38 10,076
6 DT FUSO 17 DT 17 92% 52% 81% 10.38 80% 7 354.44 32.38 11,477
7 DT FUSO 18 DT 18 98% 54% 81% 10.38 80% 7 395.65 32.38 12,812
8 DT FUSO 19 DT 20 89% 50% 81% 10.38 80% 7 332.35 32.38 10,762 1 Fleet OB SAS Blok Timur
9 DT FUSO 23 DT 23 91% 51% 81% 10.38 80% 7 347.26 32.38 11,245
10 DT FUSO 02 DT 02 96% 53% 81% 10.38 80% 7 377.20 32.38 12,215
11 DT FUSO 05 DT 05 83% 46% 81% 10.38 80% 7 287.41 32.38 9,307
DT OB
12 DT FUSO 07 DT 07 0% 0% 81% 10.38 80% 7 0.00 32.38 0
13 DT FUSO 10 DT 10 92% 52% 81% 10.38 80% 7 245.26 32.38 7,942 Produksi Tanggal 01-20 Juli 2023 OB AJC
14 DT FUSO 24 DT 24 95% 53% 81% 10.38 80% 7 251.59 32.38 8,147
15 DT FUSO 03 DT 03 90% 50% 81% 10.38 80% 7 239.76 32.38 7,764
16 DT FUSO 06 DT 06 98% 54% 81% 10.38 80% 7 396.83 32.38 12,850
17 DT FUSO 20 DT 19 96% 53% 81% 10.38 80% 7 382.73 32.38 12,394
18 DT FUSO 01 DT 01 56% 20% 81% 10.38 80% 7 85.68 32.38 2,775
19 DT FUSO 12 DT 12 0% 0% 81% 10.38 80% 7 0.00 32.38 0 1 Fleet OB SAS Blok Timur
20 DT FUSO 16 DT 16 46% 3% 81% 10.38 80% 7 9.73 32.38 315
21 DT FUSO 22 DT 22 0% 0% 81% 10.38 80% 7 0.00 32.38 0
22 DT FUSO 25 DT 25 65% 31% 81% 10.38 80% 7 150.12 32.38 4,861

TOTAL 712.4 182,088

Vessel PTY (DT) Prod.


No. Unit Heavy Equip. Code PA UA Swell Factor CT (menit) Ek (%) EWH Remarks
Capacity MT/H MT/Month
1 DT FUSO 05 DT 13 85% 47% 89% 11.78 80% 15.00 298.92 61.15 18,278
2 DT FUSO 02 DT 14 80% 44% 89% 11.78 80% 15.00 261.72 61.15 16,003 1 Fleet CG AJC
3 DT FUSO 01 DT 15 99% 55% 89% 11.78 80% 15.00 405.94 61.15 24,822
DT CG
4 DT FUSO 10 DT 10 92% 52% 89% 11.78 80% 15.00 134.46 61.15 8,222
5 DT FUSO 24 DT 24 95% 53% 89% 11.78 80% 15.00 137.93 61.15 8,434 2 Fleet CG AJC Tanggal 24-30 Juni 2023
6 DT FUSO 03 DT 03 90% 50% 89% 11.78 80% 15.00 131.44 61.15 8,037

TOTAL 366.88 83,796

Match Factor
PTY(EXC) PTY(DT) Match
No. Unit Heavy Equip. Code Jumlah DT Distance (m)
BCM/H BCM/H Factor
1 Zaxis 350-04 EX-04 133 162 5 1.22 1000
Fleet OB 2 Zaxis 350-06 EX-06 133 130 4 0.97 1000
3 Cat 330-01 EX 01 133 130 4 0.97 1000
4 Cat 330-02 EX 02 133 130 4 0.97 1000
TOTAL PRODUCTIVITY 532 550 17 1.03

PTY (EX) PTY (DT) Match


No. Unit Heavy Equip. Code Jumlah DT Distance (m)
MT/H MT/H Factor
Fleet CG
1 Zaxis 350-05 EX-05 163 183 3 1.13 700
TOTAL PRODUCTIVITY 163 183 3 1.13
Production Plan Juli 2023
Overburden
TGL PTY PTY Fleet PTY PTY TOTAL / Fleet
TOTAL / WEEK REMARK REMARK
Loader Hauler Allocation Loader Hauler WEEK Allocation
1 6,408.60 6,297.01 1,956.90 1,906.54
2 6,408.60 6,297.01 1,956.90 1,906.54
3 6,408.60 6,297.01 1,956.90 1,906.54
W

4 6,408.60 6,297.01 44,860.22 1,956.90 1,906.54 13,698.33


EE
K

5 6,408.60 6,297.01 1,956.90 1,906.54


1

6 6,408.60 6,297.01 1,956.90 1,906.54


7 6,408.60 6,297.01 1,956.90 1,906.54
8 6,408.60 6,297.01 1,956.90 1,906.54
9 6,408.60 6,297.01 1,956.90 1,906.54
10 6,408.60 6,297.01 1,956.90 1,906.54
W

11 6,408.60 6,297.01 44,860.22 1,956.90 1,906.54 13,698.33


EE
K
2

12 6,408.60 6,297.01 1,956.90 1,906.54


13 6,408.60 6,297.01 1 Fleet AJC, 1,956.90 1,906.54 1 Fleet CG
14 6,408.60 6,297.01 2 Fleet SAS, 1,956.90 1,906.54 AJC, 1 Fleet
15 6,408.60 6,297.01 1 Fleet 1,956.90 1,906.54 SAS
16 6,408.60 6,297.01 4 Fleet OB 1,956.90 1,906.54 2 Fleet CG
AJC(Tanggal (Tanggal 21-
17 6,408.60 6,297.01 01-20 Juli 1,956.90 1,906.54 31 Juli
W

18 6,408.60 6,297.01 43,256.57 2023) 1,956.90 1,906.54 15,650.78 2023)


EE
K

19 6,408.60 6,297.01 1,956.90 1,906.54


3

20 6,408.60 6,297.01 1,956.90 1,906.54


21 4,804.95 5,104.36 3,909.36 4,151.40
22 4,804.95 5,104.36 3,909.36 4,151.40
23 4,804.95 5,104.36 3,909.36 4,151.40
24 4,804.95 5,104.36 3,909.36 4,151.40
W

25 4,804.95 5,104.36 33,634.66 3,909.36 4,151.40 27,365.52


EE
K

26 4,804.95 5,104.36 3,909.36 4,151.40


4

27 4,804.95 5,104.36 3,909.36 4,151.40


28 4,804.95 5,104.36 3,909.36 4,151.40
29 4,804.95 5,104.36 3,909.36 4,151.40
30 4,804.95 5,104.36 14,414.85 3,909.36 4,151.40 11,728.08
EO
M

31 4,804.95 5,104.36 3,909.36 4,151.40


TOTAL 181,026.53 182,088.13 181,026.53 82,141.03 83,796.13 82,141.03
PT. Pertambangan Prima Nusantara
Pauh, AJC & SAS Coal Project

Reserve Sequen Juli 2023


Overburden Quality Vertical True Insitu
Block SEAM Coal (Mton) SR
(Bcm) TM IM ASH VM FC TS CV (ADB) CV (AR) Thick (m) Thick (m) Density
HM 0.00 950.19
JB 0.00 9,805.53
JB2 0.00 1,744.35
JBU 0.00 5,658.12
AJC
SF 0.00 0.00
SL1 2,676.83 143,359.99 53.56 40.85 13.68 11.19 40.35 34.78 0.27 5,062 3,557 0.45 0.44 1.25
SL2 111,791.82 7,600.38 0.07 42.32 15.79 3.26 42.02 38.92 0.19 5,455 3,774 6.83 6.38 1.21
SL4 14.86 26.11 1.76 41.23 12.06 9.77 40.24 37.92 0.61 5,231 3,467 0.53 0.41 1.26
Subtotal 114,483.51 169,144.66 1.48 42.28 15.74 3.45 41.98 38.82 0.19 5,446 3,769 6.68 6.24 1.21
HM 0.00 2,728.64
JB1 0.00 2,195.12
JB2 0.00 502.23
SAS
JBU 0.00 2,343.36
SL1 364.33 65,555.77 179.93 40.84 13.21 11.61 40.28 34.90 0.40 5,039 3,513 0.35 0.34 1.26
SL2 45,251.06 53,214.56 1.18 41.99 16.69 3.26 41.36 38.70 0.19 5,389 3,770 7.48 6.78 1.22
Subtotal 45,615.40 126,539.69 2.77 41.98 16.66 3.32 41.35 38.67 0.19 5,387 3,768 7.43 6.73 1.22

Grand Total 160,098.91 295,684.35 1.85 42.13 16.20 3.39 41.66 38.75 0.19 5,416 3,768 7.05 6.48 1.22

Estimasi Reserve Sequen Juli 2023


Unit OB (Bcm) Coal (Mton)
Waste 295,684.35 160,098.91
Prod 24-30 Juni 45,000.00
23 40,000.00
Total 250,684.35 120,098.91
SR 2.09

Note
Top surface : NONMISS(230624_PRO,230624_ORI,CNT_TOPO_1M)
Bot surface : Seq_PSL_0723_R7
Loss thick : 0.2 m
Min Thick : > 0.5 m
Prepare : Minescape 5.7
Thick Soil :1m
PT. Pertambangan Prima Nusantara
Pauh, AJC Coal Project

RESERVES SEQUEN JULI 2023

Remining PIT SL
PIT
Waste (BCM) Coal (MT) SR
PIT SL - - #DIV/0!
TOTAL - - #DIV/0!

Reserves Seq JuLi 2023


PIT
Waste (BCM) Coal (MT) SR
PIT SL 250,684 120,099 2.09
TOTAL 250,684 120,099 2.09

Disposal (Juni 2023)


Unit Volume (Bcm) Swell Factor Volume (Lcm)
OPD 245,257.00 81% 198,658.17

Remarks
1. Calculated by Minescape 5.7
Fleet CG 2. Project JCP_resource_model_final_161118
3. Reserve Parameter :
Fleet OB
a. Waste = TOTBURDVOLUME (Batasan Underburden SL)
Fleet OB & CG b. Coal = INTRRMASS
d. Loss Interval = 0.20 m
e. Sample Density 20 sq