Saudi Aramco 2616-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY


UNTIL CERTIFIED AND DATED
THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION
N OT E : T H E IN T E N T O F T H IS S H EE T IS T O S HO W A LL C A LC ULA T IO N S A N D R E F E R E N C E D O C UM E N T S
T H A T WE R E US E D T O G E N E R A T E T H E S IS S H E E T .
ISSUED FOR 90% REVIEW
REVISION DESCRIPTION

1. F OR 24" 0.344" WT. AP I 5L - GR X70 S AW P IP E: MAXIM UM ALLOWABLE OPERATING PRESSURE (M AOP):

1.1 MAOP FLANGE = 150 0 p s ig (6 0 0 # Clas s @ 19 4 °F, ASM E B16 .5)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2 X 70 0 0 0 X 0 .3 4 4 X 0 .72 (M aterial g ro up 1.7)
M AOP PIPE = = 14 4 5 p s ig
2 4 .0 0 0 1.2 MAOP PIPE = 2 X SM YS X TC OR X F
D (B16 .3 4 , M at erial g ro up 1.1)
1.3 MAOP VALVES = 13 6 7 p s ig

WHERE:
150 0 p s ig > 14 4 5 p s ig > 13 6 7 p s ig DESIGN PRESSURE = 13 0 0 p s i
07/15/2019

THEREFORE M AOP AT DESIGN FACTOR: 13 6 7 p s ig SM YS = SPECIFIED M IN YIELD STRENGTH = 70 0 0 0 p s i


DATE

10-02454-0003

LIM ITED B Y : VALVE Tn= NOMINAL (SELECTED) WALL THICKNESS = 0 .3 4 4 in


JOB ORDER/EWO NO.

F = DESIGN FACTOR = 0 .72

D = OUTSIDE DIAM ETER OF PIPE = 2 4 .0 0 0 in

d T = DESIGN TEM P. - M IN TIE-IN TEM P. 19 4 - 70 = 12 4 °F


REV. NO.

13 6 7 p s ig > 13 0 0 p s ig
TC O R = CORRODED WALL THICKNESS = Tn - CA = 0 .3 4 4 in
A

THEREFORE SYSTEM MAOP: 13 0 0 p s ig

LIM ITED B Y : DESIGN PRESSURE CA = CORROSION ALLOWANCE = 0 .0 0 0 in

2. INITIAL TES T P R ES S UR E (NEW P IP E): 18 0 6 p s ig MAXIM UM ALLOWABLE TEST PRESSURE:


BY/DATE
OTHER

2 .1 FOR ASM E 6 0 0 # FLANGES (GR 1.7)PER ASM E B16 .5 2 2 50 p s ig


2 X 0 .9 0 X 70 0 0 0 X 0 .3 4 4
PT = = 18 0 6 p s ig
2 4 .0 0 0

2 2 50 p s ig > 18 0 6 p s ig
OPERATIONS/DATE

07/15/2019

3. INITIAL TES T P RES S UR E LIM ITED B Y:


MMM
REVIEW FOR KEY DRAWINGS

PIPE
REQUIRED (SAUDI ARAMCO)

4. S YS TEM MAX. OP ER ATING P R ES S UR E, M AOP :


M AOP = 13 0 0 p s ig

5. S AF ETY VALVE S ET P R ES S UR E:
CONST. AGENCY/DATE

07/15/2019

1.0 5 X P T 18 9 6 p s ig
MTG

6. Tmin WALL THIC KNES S :

13 0 0 X 2 4 .0 0 0 MINIM UM REQUIRED WALL THICKNESS,


M AOP X D
Tm = = 0 .3 10 inch Tm = BASED ON SYSTEM M AOP & DESIGN
2 X 70 0 0 0 X 0 .72 2 X SM YS X F FACTOR
CERTIFIED/DATE

07/15/2019

TCA = 0 .3 4 4 - 0 .3 1 = 0 .0 3 4 inch T CA = T n - T m WALL THICKNESS IN EXCESS OF Tm


OAB
DESIGN CERTIFICATION

SELECTED WALL THICKNESS = Tn = 0 .3 4 4 inch


(DESIGN AGENCY)

ENGG./DATE

07/15/2019
BEK
IS COVERED, FOR ALL APPROVAL

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER


REVISION VALIDATION

10-02454-0003
DRAWING COMPLETION CERTIFICATE NO.
ATHIS REVISION NO.

SIS FOR 24" TRUNKLINE (M93-L-0001A) DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.

SIS:MAINLINE PIPING FROM WELLSITE-2 TO WELLSITE -1 SIS


TANAJIB WATER SUPPLY FACILITIES M93 A RE-789973 004 A
TANAJIB SAUDI ARABIA
EKRD/2616-1110.XLS