You are on page 1of 1

Saudi Aramco 2616-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY


UNTIL CERTIFIED AND DATED
THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION

N OTE: T H E IN T E N T O F T H IS S H E E T IS T O S H O W A LL C A LC ULA T IO N S A N D R E F E R E N C E D OC UM E N T S
T H A T WE R E US E D T O G E N E R A T E T H E S IS S H E E T .
ISSUED FOR 90% REVIEW
REVISION DESCRIPTION

1. F OR 4.5" 0.188" WT. AP I 5L - GR X65 S M LS P IP E: M AXIMUM ALLOWABLE OPERATING PRESSURE (M AOP):

1.1 M AOP FLANGE = 150 0 p sig (6 0 0 # Clas s @ 19 4 °F, ASME B16 .5)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2 X 6 50 0 0 X 0 .18 8 X 0 .72 (M aterial g ro up 1.7)
M AOP PIPE = = 3 910 p s ig
4 .50 0 1.2 M AOP PIPE = 2 X SMYS X TC O R X F
D ( B16 .3 4, Material g ro up 2 .8 )
1.3 M AOP VALVES = 14 9 0 p s ig

WHERE:

3 9 10 p s ig > 150 0 p s ig > 14 9 0 p sig DESIGN PRESSURE = 13 0 0 p s i


07/15/2019

THEREFORE MAOP AT DESIGN FACTOR: 14 9 0 p s ig SMYS = SPECIFIED M IN YIELD STRENGTH = 6 50 0 0 p s i


DATE

10-02454-0003

LIM ITED B Y : VALVE Tn= NOM INAL (SELECTED) WALL THICKNESS = 0 .18 8 in
JOB ORDER/EWO NO.

F = DESIGN FACTOR = 0 .72

D = OUTSIDE DIAM ETER OF PIPE = 4 .50 0 in


REV. NO.

14 9 0 p s ig > 13 0 0 p s ig d T = DESIGN TEM P. - M IN TIE-IN TEM P. 19 4 - 70 = 12 4 °F


A

THEREFORE SYSTEM MAOP: 13 0 0 p s ig TC OR = CORRODED WALL THICKNESS = T n - CA = 0 .18 8 in

LIM ITED B Y : DESIGN PRESSURE CA = CORROSION ALLOWANCE = 0 .0 0 0 in

2. INITIAL TES T P R ES S UR E (NEW P IP E): 2 2 50 p s ig M AXIMUM ALLOWABLE TEST PRESSURE:


BY/DATE
OTHER

2 .1 FOR ASM E 6 0 0 # FLANGES (GR 1.7)PER ASM E B16 .5 2 2 50 p s ig


2 X 0 .9 0 X 6 50 0 0 X 0 .18 8
PT = = 4888 p s ig
4 .50 0

4 8 8 8 p sig > 2 2 50 p s ig
OPERATIONS/DATE

07/15/2019

3. INITIAL TES T P R ES S UR E LIM ITED B Y:


MMM
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

FLANGE

4. S YS TEM M AX. OP ER ATING P R ES S UR E, MAOP :


M AOP = 13 0 0 p s ig

5. S AF ETY VALVE S ET P R ES S UR E:
CONST. AGENCY/DATE

07/15/2019

1.0 5 X P T 2363 p s ig
MTG

6. Tm in WALL THIC KNES S :

13 0 0 X 4 .50 0 M INIM UM REQUIRED WALL THICKNESS,


M AOP X D
Tm = = 0 .0 6 3 inch Tm = BASED ON SYSTEM M AOP & DESIGN
2 X 6 50 0 0 X 0 .72 2 X SM YS X F FACTOR
CERTIFIED/DATE

07/15/2019

T CA = T CA = T n - T m WALL THICKNESS IN EXCESS OF T m


OAB

0 .18 8 - 0 .0 6 3 = 0 .12 6 inch


DESIGN CERTIFICATION
(DESIGN AGENCY)

SELECTED WALL THICKNESS = T n = 0 .18 8 inch


ENGG./DATE

07/15/2019
BEK
IS COVERED, FOR ALL APPROVAL

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER


REVISION VALIDATION

10-02454-0003
DRAWING COMPLETION CERTIFICATE NO.
ATHIS REVISION NO.

SIS FOR 24" TRUNKLINE (M93-L-0001A) DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.

SIS:MAINLINE PIPING FROM WELLSITE-2 TO WELLSITE -1 SIS


TANAJIB WATER SUPPLY FACILITIES M93 A RE-789973 005 A
TANAJIB SAUDI ARABIA
EKRD/2616-1110.XLS