The sketch illustrates a generic building, based on the building's character traits. Icon explanation can be seen under the ICON EXPLANATION section.
Electricity for other purposes DKK 8,700 DKK 9,100 - DKK 400
* The figures are based on a standardized use of the building. See the page: THE PURPOSE OF THE ENERGY LABEL.
Kastanievej 1 311648657 12 December 2022 - 12 December 2032 Arkitektfirmaet Arne Birk ApS
5700 Svendborg CVR no.: 28859422
Machine Translated by Google
On this page, you will get help to initiate the energy ENERGY LABELING REPORT
STATUS AND IMPROVEMENTS
improvements that the energy consultant has highlighted.
You can compare the measures across economy, climate and practical
conditions, just as for each proposal there is a step-by-step guide to
get started with the energy improvements.
Find a craftsman or other relevant professional who can help you with planning and COÿ reduction
1 carrying out your energy improvement. -2 kg./year
At Sparenergi.dk you can get inspiration for the energy improvement on "Insulation of
2 heavy outer wall, from the outside"
Investment
DKK 161,500.
Read more about the concrete energy improvement at
3 www.sparenergi.dk/isolering-af-tung-ydervaeg-udefra Obtain one Renovation time
From 2 days to 1 week
or more offers for the energy improvement, select the solution that suits you best, and start
4 your energy improvement.
Find a craftsman or other relevant professional who can help you with planning and COÿ reduction
1 carrying out your energy improvement. 72 kg./year
At Sparenergi.dk you can get inspiration for energy improvement on "Solar
2 heating system for hot water and heat"
Investment
DKK 37,500.
Read more about the concrete energy improvement at
3 www.sparenergi.dk/solvarmeanlaeg-til-varmt-vand-og-varme Obtain one or Renovation time
From 2 days to 1 week
more offers for the energy improvement, select the solution that suits you best, and start
4 your energy improvement.
ENERGY PRICES HELP FOR IMPLEMENTING ENERGY SAVINGS AND ADVICE ON FINANCING
Fluctuating energy prices do not affect the building's The energy consultant can tell you which prerequisites are the basis for the individual improvement
energy label, but have an influence on the energy economy proposals. At spanerergi.dk you can read more about energy renovations and find inspiration and help
listed on the front. Some energy labels have been drawn to initiate an energy renovation. Find e.g.
up in periods when energy prices have been significantly The building guide, where we have gathered knowledge about the most common house types in
higher than others. Denmark - so you can get an overview of how to achieve a better home that is both energy efficient,
At high energy prices, the value of savings has a good indoor climate and is up-to-date.
proposals can be greater, which means that it can make
economic sense to implement more proposals. Contact your bank: Several banks offer low-interest climate and energy efficiency loans. Call your
bank and find out what they can offer.
PAGE 3 - APPENDIX
On this page you can compare the economy and climate effect
for all of the report's improvement proposals.
ATTIC
Post-insulation of the attic with 200 mm insulation. DKK 1,000 DKK 34,600 0 kg COÿ
External re-insulation of massive external walls with 200 mm. DKK 7,200 DKK 161,500 -2 kg of COÿ
FACADE WINDOWS
HEAT PUMPS
Installation of a new on/off controlled air/air heat pump. DKK 2,100 DKK 20,000 -218 kg COÿ
SOLAR HEATING
Installation of a 300 liter solar heating tank and Installation of a new solar heating DKK 2,500 DKK 37,500 72 kg COÿ
system for heating and hot water production.
OTHER SUGGESTIONS THAT MAY BE PROFITABLE IF CARRIED OUT ALONG WITH OTHER RENOVATIONS
EXTERIOR DOORS
ALL-TERRAIN TIRES
Demolition of existing off-road tires and casting of new ones with 400 mm insulation. DKK 1,800 -1 kg of COÿ
SOLAR CELLS
* The figures are based on a standardized use of the building. See the page: THE PURPOSE OF THE ENERGY LABEL.
Energy labeling of buildings has two purposes: The report provides an overview of the energy
The labeling makes the building's calculated improvements to the home that are profitable to implement or
energy needs visible and is therefore a form of product could be profitable if carried out together with other renovations.
declaration when a building is sold or rented out. Based on the The report describes what the improvements entail, what they
calculated energy demand, the home is assigned a grade on cost to implement, how much energy and CO2 is saved, and
the energy labeling scale from A2020 to G. how much savings can be achieved on electricity and heating
bills based on the calculated energy demand.
LESS DRAFTS
WARMER SURFACES
Your house will be better at retaining Your home will be closer, so that
it no longer drafts from the places
heat, so you get more benefit from
the parts of the house that were where you were previously
bothered by cold and drafts.
previously too cold to use in
everyday life.
INCREASED
BETTER INDOOR CLIMATE
COMFORT You will find it easier
When you improve energy, it can
to maintain the right temperature
have a positive effect on the indoor in the home, so it will be nicer to be in.
climate.
The calculated energy demand is a fairly accurate indicator of In order to be able to compare buildings' energy quality, the
the building's energy quality – in contrast to the actual building's calculated energy needs are calculated based on a
consumption, which is of course strongly dependent on both the number of standard assumptions for weather, family size, indoor
weather and the habits of the building's users. Some save on temperature, behavior etc.
heat, while others fire with open windows or use large amounts Below are the most central assumptions for the
of hot water. calculated energy demand.
FOUR REASONS WHY THE HOUSE'S ACTUAL HEATING BILL MAY DIFFER FROM
THE CALCULATED ENERGY REQUIREMENT IN THE REPORT:
PAGE 5 - APPENDIX
YEAR OF SIGNIFICANT RENOVATION HEAT SUPPLY SUPPLEMENTARY HEAT RESIDENTIAL AREA IN BBR COMMERCIAL AREA IN BBR
HEATED BUILDING AREA OF WHICH THE ROOF IS HEATED OF WHICH THE BASEMENT FLOOR IS HEATED UNHEATED BASEMENT FLOOR
91 m² 0 m² 0 m² 0 m²
ENERGY BRAND ENERGY LABEL AFTER PROFITABLE SAVING PROPOSALS ENERGY LABEL AFTER ALL SAVING PROPOSALS
FORM OF SUPPLY HEAT REQUIREMENT IN kWh CONVERTED TO ENERGY UNIT FOR SUPPLY FORM ELECTRICITY FOR OTHER* kWh
Wood pellets 18,480 3,802 kilos of wood pellets Electricity for building operation 146
PAGE 6 - APPENDIX
By energy consultant
The report's electricity and wood pellet price is based on an
Henning Moller Boisen
average assessment, as energy prices vary daily and in relation to the
choice of supplier. VALIDITY OF THE REPORT Valid
STATED CONSUMPTION INCLUDING VAT AND FEES If you believe there are errors in the report, or if you wish to complain
about the energy labelling, you must contact the certified energy labeling
This report does not contain information on actual consumption, as it has not
company that prepared the labelling.
been made available to the energy consultant when performing the energy
label.
The owner of the building or unit can appeal. The complaint must be
received by the certified energy labeling company, no later than:
DISCLAIMER FOR PRICES FOR INVESTMENT IN
ENERGY SAVING The energy label's savings proposal is
based on the energy consultant's experience and assessment. • 1 year after the date of the energy labeling report, or • 1 year after
Before the energy saving proposals are implemented, offers the building's takeover date, which has been agreed between the seller
should always be obtained from several suppliers, as the stated prices and the buyer, if the building has acquired a new owner after the
should only be considered indicative. In addition, it should be investigated reporting of the energy labeling report - but no later than 6 years
whether the energy improvement requires official approval. after the date of the energy labeling report.
The rules on appeals are contained in the current executive order on energy
Annual subscription for the sale of electricity should be investigated further, labeling of buildings. Click on the link and read more about how to lodge a
as this varies greatly on the free electricity market. complaint.
In connection with the building inspection, permission has not been granted
to carry out destructive investigations. PROCESSING OF INFORMATION
Information about insulation is therefore based on The Danish Energy Agency is responsible for processing
the energy consultant's estimate, drawing material and construction practices. information about the building, including publication of the energy labeling
report. You can read more about the rules and how we process
information on our website.
www.ens.dk/ansvarsomraader/energy-labelling-of-buildings/
legislation-om-energy-labelling
The building was built in 1972 and insulated according to the standards of the time. The attic has been insulated and several windows/doors have
energy glazing.
If the proposed measures are implemented with good profitability, the brand could be improved to: A
In connection with the report's proposal for energy improvement of technical installations, you should always seek technical advice from a
professional adviser or supplier.
In relation to the validity period of the energy label, both the price basis and the product development may change quite a bit, year by year.
On the following pages you can see a detailed description of the energy The profitable proposals appear with an investment price.
status of your home, the energy consultant's suggestions for energy
improvements and associated energy solutions. Some improvement proposals can be advantageously considered
during renovations or if there are building parts that need to be replaced
anyway. The investment price for improvement proposals for renovation
Some improvement proposals are profitable. This means that you save has not been specified as the investment will depend on the specific
more on your energy consumption within the lifetime of the energy renovation that must be carried out in connection with the savings proposal.
improvement than the energy improvement costs to implement.
ATTIC
STATUS
Post-insulation of the attic with 200 mm insulation. Existing insulation is preserved, so that, depending on DKK 1,000 DKK 34,600
future conditions, it is insulated with 400 mm. Before insulation of the attic space is started, it must be
examined in more detail whether the existing constructions are sufficiently tight, so that correct execution is
ensured. A new walkway is established in the roof space, or if there is an existing one, this must be raised to
the new insulation conditions.
OUTER WALLS
STATUS
External post-insulation with 200 mm insulation on solid external walls. The external post-insulation is finished DKK 7,200 DKK 161,500
with a facade plaster solution or an approved board covering. The windows may have to be moved out into the
facades or alternatively replaced entirely in connection with this. An external insulation solution ensures optimal
thermal bridge interruption. However, the appearance of the facades will change significantly, and before the
work can be started it must be investigated whether local regulations may prevents such a change in the
appearance of the building.
PAGE 9 - APPENDIX
FACADE WINDOWS
STATUS
Hinged windows with one pane are fitted with two-layer energy glass with a cold edge.
Fixed single-bay windows are fitted with two-layer double-glazed windows with a cold edge.
Openable windows with one section are fitted with two-layer energy glass with a warm edge.
Existing single-bay windows to the west in the living room and to the east in the room are proposed to DKK 1,400 DKK 39,600
be replaced with new windows with energy panes, energy class A.
EXTERIOR DOORS
STATUS
Terrace door with single-pane window is fitted with two-layer double-glazed glass with a cold edge.
Outer door with insulated filling and single-pane window is fitted with two-layer energy glass with cold edge.
Outer door with insulated filling and single-pane window fitted with two-layer energy glass with warm edge.
The existing terrace door is proposed to be replaced with a new one, fitted with energy-efficient glass, DKK 400
energy class A.
FLOORS
ALL-TERRAIN TIRES
STATUS
All-terrain tires are made of concrete with a wear layer floor. The floor is insulated with 50 mm mineral wool/polystyrene sheets under the concrete.
Construction and insulation conditions have been ascertained from drawing material.
Removal of existing ground cover and excavation to the underside of new insulation, which is laid in a thin layer DKK 1,800
of sand. Insulate with 400 mm of tread-resistant mineral wool or polystyrene sheets, and finish with 10 cm of
concrete and wear layer floors. The top of the wear layer is fitted with a new floor covering. Existing installations
are re-insulated and secured for later embedment. If there are joints on pipes, these must not be cast in.
Alternatively, new installations are carried out. New installations are not included in the investment.
PAGE 10 - APPENDIX
VENTILATION
VENTILATION
STATUS
There is natural ventilation throughout the building. The building is normally tight, as structural joints and joints at window and door openings, as well as
sealing strips in windows and external doors appear to be in good condition.
HEATING SYSTEM
BOILERS
STATUS
The property is heated with a 10 kW - RTB boiler. The boiler is located in the utility room. The boiler is connected to the building's central heating
system, and heats both domestic water and space heating.
OVEN
STATUS
There is supplementary heat supply in the form of a wood-burning stove. The wood-burning stove is located in the living room. The heat source is not included
in the calculation of the energy consumption, according to the Danish Energy Agency's calculation rules.
HEAT PUMPS
STATUS
The installation of an on/off controlled air/air heat pump is proposed. DKK 2,100 DKK 20,000
The system consists of an indoor and outdoor part, which converts energy in the air into warm air, which is
blown into the room where the indoor part is placed.
The interior part itself gets the best utilization and coverage area when placed in the living room.
It is always recommended to have a concrete calculation carried out based on a supplier's or manufacturer's
specific calculation data before starting the work. Likewise, it is always a good idea to obtain an overall offer
from a supplier/installer. Both parts will often be able to contribute to even better profitability.
SOLAR HEATING
STATUS
PAGE 11 - APPENDIX
It is proposed to install a new 300 liter solar heating tank in connection with a solar heating system DKK 2,500 DKK 37,500
It is proposed to install a solar heating system of 5 m², made as a vacuum tube (Piperør) with 1 layer
of cover glass. Solar heating tank (see under section for hot water tanks) must have a capacity of 50
liters per square meter collector, but minimum 200 litres. The container is supplied with an electric cartridge
for heating domestic water in cold periods. Connection pipes are installed for solar collectors, which are
supplied with a pump unit. In order to make full use of the solar heat, the system is connected to the existing
heating system via a heat exchanger. It would be optimal to connect to underfloor heating, as such high
operating temperatures are not required.
HEAT DISTRIBUTION
HEAT DISTRIBUTION
STATUS
The primary heating of the property is via radiators in heated rooms. Heat distribution pipes are made as a two-string system. There is also underfloor
heating in the bathroom.
HEATER PIPE
STATUS
Heating pipes in off-road decks are considered to be on the warm side of the insulation and contribute to the heating of the house.
STATUS
A distribution pump, manufactured by Grundfos, type Alpha 2, is installed in the heating system. The pump has a maximum output of 18 Watts.
AUTOMATIC
STATUS
Thermostatic valves are fitted to all radiators to regulate the correct room temperature.
PAGE 12 - APPENDIX
HOT WATER
HOT WATER
STATUS
In the calculation, a hot water consumption of 250 liters per m² of heated living space per year.
STATUS
The heat loss from connecting pipes under 5 meters is recognized with a standard set of values for pipe length and insulation level, corresponding to
4 meters with 30 mm insulation. This is carried out in accordance with the current Handbook for Energy Consultants.
STATUS
Hot domestic water is produced in a 150 l pre-insulated water heater, made by Vølund, located in the utility room.
EL
SOLAR CELLS
STATUS
Installation of solar cells on the roof surface to the west. It is recommended that monocrystalline silicon solar DKK 3,200
cells with an area of approx. 22.5 m². In order to achieve optimal efficiency, it may be necessary to prune
any tree crowns so that there is no shadowing effect on the solar cells. It should be investigated whether the
existing roof structure is suitable for the extra weight from the solar cells. Any expenditure for this is not
included in the proposal's finances.
PAGE 13 - APPENDIX
A building consists of many parts that are important for the building's energy needs. The figure below provides an explanation
of the most important parts across constructions and installations.
1
5
10
4 4 4
8
2
6 7 4
1 6
2 7
3 8
4 9
Windows/doors Solar
The building's facade windows and external doors. energy The building's solar energy, e.g. solar
heating and solar cells.
5 10
Kastanievej 1 311648657 12 December 2022 - 12 December 2032 Arkitektfirmaet Arne Birk ApS
5700 Svendborg CVR no.: 28859422
Machine Translated by Google
ENERGY BRAND
FOR THE HOME
Kastanievej 1
5700 Svendborg