You are on page 1of 1

Pressure Monitoring

Project Title : Jawa 1 Combined Cycle Gas Turbine Power Plant (1760 MW)
Job Desc : Gas Consumption

Pig Pig Skid Skid


Time
Receiver Receiver Metering Metering
Remarks
Initial Final Initial Final
From To (Barg) (Barg) (Barg) (Barg)
Date: Monday 21/11/2022
16:00 17:00 71,86 71,85 45,19 40,58 GE pressure raise electric heater
Date: Tuesday 22/11/2022
15:00 16:00 71,79 71,78 43,08 41,28 GE pressure raise electric heater
20:00 21:00 71,76 71,74 41,48 39,45 GE aktivity depressurize line star up
Date: Wednesday 23/11/2022
19:00 20:00 71,58 71,61 43,9 39,05 GE pressure raise electric heater
Date: Thursday 24/11/2022
16:00 17:00 71,51 71,51 44,62 41,88 GE activity
Date: Friday 25/11/2022
Date: Saturday 26/11/2022
Date: Sunday 27/11/2022

Prepared by: Checked by:


Shift Technician Shift SPV