Professional Documents
Culture Documents
06/30/2022 2
To generate electricity..
06/30/2022 3
Power Plants:-
06/30/2022 4
Why do we need electricity?
06/30/2022 5
How much electricity India needs?
06/30/2022 6
Indian electricity scenario
06/30/2022 7
Different ways to produce electricity
06/30/2022 8
Where is electricity produced in
the power plant?
06/30/2022 9
Generator
(Exceptions:- Solar, Battery)
06/30/2022 10
Ge n e r a t o r
06/30/2022 13
13
06/30/2022 14
14
How is rotor of generator rotated?
06/30/2022 15
15
Turbine
06/30/2022 16
16
Turbine
06/30/2022 17
17
How is turbine rotated?
06/30/2022 18
18
06/30/2022 19
19
Steam Flows from Boiler to turbine
Bypass Turbine
Thursday, June 30
, 2022
Turbine are multistage
The steam turbine is a
form of heat engine that
derives much of its
improvement in
thermodynamic efficiency
from the use of multiple
stages in the expansion
of the steam
Thursday, June 30
, 2022
Thursday, June 30
, 2022
How is steam formed?
06/30/2022 23
23
How coal burns?
06/30/2022 24
24
Coal Mine
Path of coal
50000TPD
MGR
CHP
Bunker
Mill
Boiler
06/30/2022 450 TPH
25
25
Path of water
Hasdeo
RBC
MUPH
35 km
Reservoir
RWPH
Chemical
06/30/2022
treatment 26
26
Chemical treatment of water
RWPH
Clarified Potable
Water Plant
DM Drinking
CWPH
Water water
Boiler
06/30/2022 27
27
Simplified Diagram
Coal to Electricity ….. Basics
Pollutants
NTPC SIPAT
BASIC CONSIDERATIONS
BOILER
Qi
Wi PUMP TURBINE Wo
CONDENSER
Qr
TRACK
HOPPER
BUNKER
BOILER
PA CEP
FA
N PULVERI
S ER
DEARATOR
ID
ESP
FD
FA FA
N N COOLIN
G
BFP TOWER
ASH
TO ASH
DYKE PIT
06/30/2022 CW PUMP
31
Why Coal?
Shortcomings of Coal
Advantages of Coal Fuel
• Low Calorific Value
• Abundantly available in
India • Large quantity to be
Handled
• Low cost
• Produces pollutants,
• Technology for Power
ash
Generation well
developed • Disposal of ash is
Problematic
• Easy to handle, transport,
store and use • Reserves
depleting fast
• India’s Coal Reserves are estimated to be 255 billion tonnes. Present consumption is
about 450 million tonnes.
• Cost of coal for producing 1 unit of electricity (Cost of coal Rs 1000/MT)is Rs 2.75.
• Cost of Gas for producing 1 unit of electricity (Cost of Gas Rs 6/SMC)is Rs 4.20.
06/30/2022 32
Coal for combustion
Anthracite High CV, low VM
Semi-anthracite High CV, low VM
Bituminous Medium CV, medium VM
Semi-Bituminous Medium CV, medium VM
Lignite Low CV, high VM, high TM
Peat Very low CV, high VM & TM
06/30/2022 33
Boiler/ steam generator
Raw materials for design of boilers
1. Coal from mines oGenerating heat energy
2. Ambient air oAir for combustion
3. Water from natural resources o
Working fluid for steam generation,
(river, ponds)
possessing heat energy
493oC
Combustion
1400oC
Thursday, June 30
, 2022
Thursday, June 30 PMI Revision 00 42
, 2022
LOCATION OF ESP
ECO
Cooling T
3 4
LP Turbine
Water
6
Cycle 1
Heat Rejected
to condenser
8
S
CONDENSER
CW Pump House
Cooling
Tower
06/30/2022 45
45
How Generated electricity reaches
consumer?
06/30/2022 46
Generator Transformer
Thursday, June 30
, 2022
Thursday, June 30 PMI Revision 00 48
, 2022
Power Generation, Transmission and
Distribution
06/30/2022 51
51
THANK YOU!
Questions please.
06/30/2022 52
52