You are on page 1of 4

Project Job Ref.

Structure Sheet no.


Page 1/4
Calc. by Date Chk'd by Date App'd by Date
mwaba emmanuel 18/05/2023 18/05/2023 18/05/2023

Material Listing
Structure
Cast-in-place Concrete Beams
Section Section Grade No. Total Mass Surface Volume Reinforcement Reinforcement Embodied
Geometry Size Length [kg] Area [m3] [kg] [kg/m3] Carbon Mass
[mm] [m2] [kgCO2e]
Rectangular 250x500 C40 75 372658 109468.22 559.0 46.6 10553.32 227 37421
Rectangular 350x500 C40 140 944576 388457.01 1605.8 165.3 24913.04 151 107845
Total 215 1.317E+06 497925.23 2164.8 211.9 35466.36 167 145267

Cast-in-place Concrete Columns


Section Section Grade No. Total Mass Surface Volume Reinforcement Reinforcement Embodied
Geometry Size Length [kg] Area [m3] [kg] [kg/m3] Carbon Mass
2
[mm] [m ] [kgCO2e]
Rectangular 350x500 C40 67 183520 75472.60 312.0 32.1 6398.61 199 24054
Rectangular 400x600 C40 67 183520 103505.28 367.0 44.0 4785.05 109 25048
Total 134 367040 178977.88 679.0 76.2 11183.67 147 49102

Tekla Structural Designer; version: 22.3.1.0


Project Job Ref.

Structure Sheet no.


Page 2/4
Calc. by Date Chk'd by Date App'd by Date
mwaba emmanuel 18/05/2023 18/05/2023 18/05/2023

Cast-in-place Concrete Slabs/Mats


Level Slab Type Depth Grade Mass Gross Surface Net Surface Volume Reinforcement Punching Total Total Total Embodied Carbon
[mm] [kg] Area Area [m3] [kg] [kg] [kg] [kg/m2] [kg/m3] Mass
[m2] 2
[m ] [kgCO2e]
St. 1 (GF) : 3370mm S 10 Slab on 100.0 C40 194707.24 828.5 828.5 82.9 7638.33 0.00 7638.33 9.22 92 44406
beams
St. 2 (FF) : 6670mm S 16 Slab on 100.0 C40 194707.24 828.5 828.5 82.9 7638.33 0.00 7638.33 9.22 92 44406
beams
St. 3 (SF) : 9970mm S 15 Slab on 100.0 C40 194707.24 828.5 828.5 82.9 7638.33 0.00 7638.33 9.22 92 44406
beams
IP 1 : 0mm - S 4 Flat slab 100.0 C40 6803.50 29.0 29.0 2.9 274.30 0.00 274.30 9.47 95 1566
1685mm
IP 2 : 1685mm - S 5 Flat slab 100.0 C40 4947.99 21.1 21.1 2.1 201.67 0.00 201.67 9.58 96 1144
3370mm
IP 3 : 3370mm - S 6 Flat slab 100.0 C40 7416.38 31.6 31.6 3.2 294.95 0.00 294.95 9.35 93 1699
5020mm
IP 4 : 5020mm - S 7 Flat slab 100.0 C40 7416.38 31.6 31.6 3.2 294.95 0.00 294.95 9.35 93 1699
6670mm
IP 5 : 6670mm - S 8 Flat slab 100.0 C40 7416.38 31.6 31.6 3.2 294.95 0.00 294.95 9.35 93 1699
8320mm
IP 6 : 8320mm - S 9 Flat slab 100.0 C40 7416.38 31.6 31.6 3.2 294.95 0.00 294.95 9.35 93 1699
9970mm
Total 625538.70 2661.9 2661.9 266.2 24570.75 0.00 24570.75 9.23 92 142727

Tekla Structural Designer; version: 22.3.1.0


Project Job Ref.

Structure Sheet no.


Page 3/4
Calc. by Date Chk'd by Date App'd by Date
mwaba emmanuel 18/05/2023 18/05/2023 18/05/2023

Pad Bases
Member Reference Grade Mass Surface Area Volume Reinforcement Reinforcement Embodied Carbon Mass
[kg] [m2] [m3] [kg] [kg/m3] [kgCO2e]
PB 1 C40 12954.38 30.8 5.5 239.81 44 2420
PB 2 C40 13327.14 31.6 5.7 243.12 43 2483
PB 3 C40 13327.14 31.6 5.7 243.12 43 2483
PB 4 C40 12224.70 29.2 5.2 210.97 41 2254
PB 5 C40 4950.86 17.2 2.1 122.29 58 986
PB 6 C40 11188.35 29.3 4.8 230.86 48 2138
PB 7 C40 7157.81 21.5 3.0 164.60 54 1401
PB 8 C40 9625.60 25.6 4.1 188.49 46 1819
PB 9 C40 5929.05 20.3 2.5 166.68 66 1221
PB 10 C40 10236.60 27.1 4.4 215.75 50 1965
PB 11 C40 10236.60 27.1 4.4 215.75 50 1965
PB 12 C40 12954.38 30.8 5.5 239.81 44 2420
PB 13 C40 14088.54 33.2 6.0 261.65 44 2634
PB 14 C40 10236.60 27.1 4.4 215.75 50 1965
PB 15 C40 8161.26 24.3 3.5 195.97 56 1614
PB 16 C40 6680.76 20.2 2.8 140.50 49 1282
PB 17 C40 16523.44 35.6 7.0 268.59 38 3013
PB 18 C40 12954.38 30.8 5.5 239.81 44 2420
PB 19 C40 12954.38 30.8 5.5 239.81 44 2420
PB 20 C40 9928.75 26.3 4.2 207.28 49 1902
PB 21 C40 12954.38 30.8 5.5 239.81 44 2420
PB 22 C40 10236.60 27.1 4.4 215.75 50 1965
PB 23 C40 13327.14 31.6 5.7 243.12 43 2483
PB 24 C40 11867.79 28.5 5.1 207.97 41 2194
PB 25 C40 11867.79 28.5 5.1 207.97 41 2194
PB 26 C40 10236.60 27.1 4.4 215.75 50 1965
PB 27 C40 13705.20 32.4 5.8 252.31 43 2558
PB 28 C40 16967.00 36.5 7.2 278.25 39 3099
PB 29 C40 17871.75 38.2 7.6 291.70 38 3261
PB 30 C40 13705.20 32.4 5.8 252.31 43 2558
PB 31 C40 8422.40 25.0 3.6 198.97 56 1659
PB 32 C40 7157.81 21.5 3.0 164.60 54 1401
Total 363960.36 909.9 154.9 7019.11 45 68562

Reinforcement
Beams
Loose Bars
Type Unit Mass Total Length Total Mass
[kg/m] [mm] [kg]
H8 0.395 1.174E+07 4636.10
H12 0.888 2.334E+06 2072.24
H16 1.579 2.165E+06 3417.98
H20 2.466 4.871E+06 12010.65
H25 3.854 1.769E+06 6817.53
H32 6.313 1.032E+06 6511.86
Total 35466.36

Columns
Loose Bars
Tekla Structural Designer; version: 22.3.1.0
Project Job Ref.

Structure Sheet no.


Page 4/4
Calc. by Date Chk'd by Date App'd by Date
mwaba emmanuel 18/05/2023 18/05/2023 18/05/2023

Type Unit Mass Total Length Total Mass


[kg/m] [mm] [kg]
H8 0.395 5.118E+06 2021.79
H12 0.888 598000 531.02
H16 1.579 2.083E+06 3288.27
H20 2.466 2.167E+06 5342.59
Total 11183.67

Slabs/Mats
Loose Bars
Type Unit Mass Total Length Total Mass
[kg/m] [mm] [kg]
H8 0.395 5.655E+07 22337.04
Total 22337.04
Total + 10.00 % slab detailing allowance 24570.75

Pad Bases
Loose Bars
Type Unit Mass Total Length Total Mass
[kg/m] [mm] [kg]
H16 1.579 4.445E+06 7019.11
Total 7019.11

Concrete
Grade Mass Gross Surface Area Net Surface Area Volume
[kg] [m2] [m2] [m3]
C40 1.666E+06 6415.6 6415.6 709.1
Total 1.666E+06 6415.6 6415.6 709.1

Total
Material Mass Gross Surface Area Net Surface Area Volume
[kg] [m2] [m2] [m3]
Concrete 1.666E+06 6415.6 6415.6 709.1
Total 1.666E+06 6415.6 6415.6 709.1

Reinforcement
Type Total Mass
[kg]
Beams 35466.36
Columns 11183.67
Slabs/Mats 22337.04
Pad Bases 7019.11
Total + 10.00 % slab detailing allowance 78239.89