You are on page 1of 2

R.C.C work (1:1.

5:3) complete excluding the cost of reinforcement and its fabrication with stone chips
07.3.1 Cost of concrete for individual and combined footings, pile cap, raft/mat floor slab, foundation beam up to plinth level
Considering 100 cft
(i) Materials (From Secondary Input : Item B-5)
(ii) Laying/placing concrete (@ 1200 cft concreting using 1 mixer machine in one day)
(From Secondary Input : Item A-1) Sub Total
Profit 10%
Overhead 3.5%
Total
Add VAT with adjustment factor 1.06383 6.0%
Grand Total
Rate per cft
Rate per cum
ation beam up to plinth level

27,502.50৳
999.83৳
28,502.33৳
2850.23333
997.581667
32,350.15৳
2,064.91৳
34,415.06৳
344.15৳
12153.5746