Service Letter No. SL6000-02-03 R1

You might also like

You are on page 1of 1

g GE Energy

__________________________________________________
SERVICE LETTER No. SL6000-02-03 R1
September 19, 2007

CANCELLATION NOTICE

TITLE: High Pressure Turbine Rotor Stage 1 Blade Coating Chipping

This notice cancels Service Letter SL6000-02-03, dated 31 May 2002.

This Letter is being cancelled because limits for the High Pressure Turbine stage 1 blades
have been incorporated into WP 4015 of the applicable On-site Operations and
Maintenance Manual.

CLASSIFICATION: _X__ INFORMATION INSPECTION OTHER

PAGE 1 OF 1

You might also like