FD2 HANDING - OVER - PROTOCOL - Cabin-3 - 3rd - Floor
FD2 HANDING - OVER - PROTOCOL - Cabin-3 - 3rd - Floor
OBSERVATIONS:-
5
SIGNATURE OF CONTRACTOR (CIVIL/ STRL) SIGNATURE OF EIL (CIVIL/ STRL)
Punjab Engineering Company (Projet Division)
Assam Bio Refinery Projects, Numaligarh
Golaghat , Assam
Date :- 11.07.2023
HANDING OVER PROTOCOL
THE FOLLOWING ARE BEING HANDED OVER FOR SUBSEQUENT WORK:-
Sl. No.. DESCRIPTION OF EQUIPMENT FOUNDATION / STRUCTURE EQUIPMENT / STRUCTURE TAG NO
LIFT KEYS : 4 NOS (Two types each one pair).
1 Lift keys
OBSERVATIONS:-