Work Inspection Request Flow Chart
Site Engineer to Raise the Work
Inspection Request to QAQC QAQC to verify the Work at
with his Signature on Cover Site and Documents raised by
Work Completion Confirmation
Page with mandatory the Site Team. And Verification
from Site Foreman/Supervisor
Attachments (Checklist, MEP signs will be done before
Clearance, Survey Reports and Submission of WIR to DC.
Highlighted Drawings
Consultants DC to handover Upon Confirmation of Work
After the Inspection WIR WIR to Civil Engineer for WIR to be given to DC
Approval/Rejection to be given Further Required Actions (Site Contractor for necessary Log
to Consultant DC Inspection, Documents Entries and Stamps before
Verification) Consultants DC Submissions
Consultants DC to handover the
Signed and Stamped WIR to Same Process to be followed for
Contractors DC for Log Entry’s all the Ongoing Activities
and Circulations