Work Inspection Request Flow Chart

The work inspection request flow chart outlines the process for raising, verifying, and approving work inspection requests at a construction site. The site engineer submits the request to the quality assurance and quality control team with required documents. Then, the quality team verifies the work at the site. Once verified, the request is submitted to the design consultant for further actions like site inspections. Finally, the design consultant approves or rejects the request, which is then given to the contractor for logging before closing out the request. This process is followed for all ongoing construction activities requiring inspections.

Uploaded by

Imran Zaman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
2K views1 page

Work Inspection Request Flow Chart

The work inspection request flow chart outlines the process for raising, verifying, and approving work inspection requests at a construction site. The site engineer submits the request to the quality assurance and quality control team with required documents. Then, the quality team verifies the work at the site. Once verified, the request is submitted to the design consultant for further actions like site inspections. Finally, the design consultant approves or rejects the request, which is then given to the contractor for logging before closing out the request. This process is followed for all ongoing construction activities requiring inspections.

Uploaded by

Imran Zaman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
  • Work Inspection Request Process: Describes the procedural steps involved in a work inspection request, from compliance to confirmation stages.

Work Inspection Request Flow Chart

Site Engineer to Raise the Work


Inspection Request to QAQC QAQC to verify the Work at
with his Signature on Cover Site and Documents raised by
Work Completion Confirmation
Page with mandatory the Site Team. And Verification
from Site Foreman/Supervisor
Attachments (Checklist, MEP signs will be done before
Clearance, Survey Reports and Submission of WIR to DC.
Highlighted Drawings

Consultants DC to handover Upon Confirmation of Work


After the Inspection WIR WIR to Civil Engineer for WIR to be given to DC
Approval/Rejection to be given Further Required Actions (Site Contractor for necessary Log
to Consultant DC Inspection, Documents Entries and Stamps before
Verification) Consultants DC Submissions

Consultants DC to handover the


Signed and Stamped WIR to Same Process to be followed for
Contractors DC for Log Entry’s all the Ongoing Activities
and Circulations

Work Inspection Request Flow Chart
Work Completion Confirmation
from Site Foreman/Supervisor
Consultants DC to handover
WIR t