54 B16 05-150 U bars

54 B16 05-150 U bars


this document that the recipient shall not duplicate or reproduce it in whole or in part, nor

54 B16 05-150 U bars

54 B16 05-150 U bars


!

!
disclose its contents without the written authorisation of Kier Professional Services Limited.
B

54 B16 11-150 B2

54 B16 13-150 B2
8 B32 02-200

8 B32 02-200

8 B32 02-200
No liability shall be accepted for its unauthorised use.

54 B16 10-150 B2
54 B16 08-150 B2

54 B16 08-150 T2

54 B16 11-150 T2

54 B16 12-150 T2
54 B16 09-150 T2
N

2x54 B16 07-150

2x54 B16 07-150

2x54 B16 07-150


U bars ABR

U bars ABR

U bars ABR
0038

16 B25 01-150

47 B25 01-150

26 B25 01-150

46 B25 01-150

16 B25 01-150
A Notes:

U bars ABR

U bars ABR

U bars ABR

U bars ABR

U bars ABR
0038
Detail B 1. Unless shown otherwise or indicated in the Specification,
whichever is the more onerous, dimensional tolerance is
to be in accordance with Tables 1 and 2 of BS 5606.

2. All dimensions are in millimetres (mm) unless noted


otherwise. DO NOT SCALE FROM THIS DRAWING, USE
FIGURED DIMENSIONS ONLY.

3. This drawing is to be read in conjunction with the


Specification and any Specialist drawings.

4. Refer also to:


Continued on Drawing 55-19007-DR-0035

Schedule numbers: 55-19007-SC-0037.01 -

Drawing numbers: 55-19007-DR-0030 to 0036

Matchline - Continued Below


(16) (57) (36) (46) (26) 5. UNLESS THE REVISION OF THIS DRAWING IS
DENOTED BY THE PREFIX C THEN THIS DRAWING IS
NOT FOR CONSTRUCTION.

6. Crucial material characteristics are as follows:

7. Unless noted otherwise, all steelwork is to be execution


class EXC2.
D 2x2 B20 24 2x2 B20 24 2x2 B20 24
0038 in slab step in slab step in slab step IF IN DOUBT ASK

Safety, Health and Environment Information.


C Notes below are additional to hazard/risks normally
0038 associated with this type of work:
(16) (47) (36) (56) (16) Construction
Ci. No unusual risks identified.
Operations
Oi. No unusual risks identified.
Maintenance
Mi. No unusual risks identified.
Dismantling/Demolition (future)
Di. No unusual risks identified.

These notes are based on the use of experienced and


competent contractors carrying out the work using an
approved safe method of working.
The Temporary Works Coordinator (or other suitably
competent person) is responsible for the implementation of
these works on site and notifying the designer of any
changes.

54 B16 15-150 B2
54 B16 14-150 T2
Detail B

26 B25 01-150

16 B25 01-150
46 B25 01-150
47 B25 01-150
16 B25 01-150

Detail A

02-200

02-200

02-200
! bar weighs in excess of 25kg

U bars ABR

U bars ABR
U bars ABR
bars ABR

bars ABR

bars ABR
U bars ABR
U bars ABR

! 8U B32

! 8U B32

! 8U B32
Base Slab Plan C01 12.02.20 Issued for construction MB GRM MG
Scale 1:50 P02 20.12.19 Reinforcement added MB GRM MG
P01 29.11.19 Preliminary issue MB GRM MG
Issue Date Description Drawn Des. Chkd.

54 B16 05-150 U bars

54 B16 05-150 U bars


Issue codes:-
For Wall Starter Bars refer to
!

F : Feasibility T : Tender P: Preliminary C : Construction AB : As built


8 B32 02-200
54 B16 17-150 B2

54 B16 17-150 B2

54 B16 19-150 B2

54 B16 09-150 B2
54 B16 16-150 T2

54 B16 16-150 T2

54 B16 18-150 T2

54 B16 09-150 T2
2x54 B16 07-150

U bars ABR

drg 55-19007-DR-0031& 0032 Drawing


62 B25 01-150

48 B25 01-150

57 B25 01-150
status
FOR CONSTRUCTION
U bars ABR

U bars ABR

U bars ABR
Detail A

PARTNERS

Continued on Drawing 55-19007-DR-0036


(71) (48) (57) 357 B20 03-150 T1 STG SPONSORS
Matchline - Continued Above
100 on Original - A1

2x2 B20 24
in slab step
UNLOCKING THE SEVERN FOR LIFE
LIFE 15 NAT UK 000219/H6-15-04573
ACTION A.1 PREPARE CIVIL ENGINEERING DRAWINGS FOR FISH PASSAGE
IMPROVEMENTS.

KIER PROFESSIONAL SERVICES FS 653123

(71) (58) (57) 357 B32 04-150 B1 STG ! Kier Professional Services Limited
Kier Duplex, Ayton Rd, Wymondham, Norfolk NR18 0QH
Tel : 01953 609 899
www.kier.co.uk professional.services@kier.co.uk
Client

CANAL & RIVER TRUST


Contract

LINCOMB FISH PASS


57 B25 01-150
48 B25 01-150
62 B25 01-150

Title
02-200

U bars ABR
U bars ABR
U bars ABR

bars ABR

POOL SECTION BASE SLAB


! 8U B32

N
Base Slab Plan (continued) REINFORCEMENT
Scale 1:50
SHEET 1 of 2
CONCRETE & REINFORCEMENT SPECIFICATION
For concrete notes refer to 1. For concrete & reinforcement specification for the walls refer to drawing 55-19007-DR-0038.
Scale (A1)
As shown
drawing 55-19007-DR-0030 2. Reinforcement shown on this drawing is listed on bar schedule 55-19007-SC-0037.01 - 02 Key Plan Drawing No. Issue

Scale 1:500 55-19007-DR-0037 C 01