Area Pipe
Item Used Cost per Total Cost Actual Cost
Description Unit Quantity Covered Area
no. Quantity Item
(sq. m) (sq. m)
Item
Description Unit Quantity Cost per Item Amount
no.
1 Hand Drill 0
2 Grinder 0
3 0
4 0
Equipments (Prices: July, 2023)
Item
Description Unit Quantity Cost per Item Amount
no.
1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
Total 0
EVC CONSULTANCY AND ENGINEERING SERVICES
Ormoc City, Leyte
Tel. No.: (053) 561 9925
Standard Rate of Insulation of Pipe
Outside Dimeter (in) Length (m) Area (sq. m)
Pipe Dimension
2 1 0.16
Cost Summary (Note all amount in Php)
Material Cost 289.46
Labor Cost
Tools & Equipment Cost 0
Total Cost/Meter 289.46
Material Cost (Note all amount in Php)
Insulation & Cladding (Prices: July, 2023)
Area Pipe
Item Used Cost per Actual
Description Unit Quantity Covered Area Total Cost
no. Quantity Item Cost
(sq. m) (sq. m)
Item
Description Unit Quantity Cost per Item Amount
no.
1 Hand Drill 0
2 Grinder 0
3 0
4 0
Equipments (Prices: July, 2023)
Item
Description Unit Quantity Cost per Item Amount
no.
1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
Total 0