GEDUNG 8 LANTAI DAAN MOGOT DRAWING APPROVAL

Project Number : Reff. Number


Client : PT. OMETRACO ARYA SAMANTA Reff. Date
CM Consultant : PT. JAPFA INDOLAND Enclosure(s) sheet(s)
Contractor : PT. TRIMEGA BANGUN PRIMA Scope of Work MEP
Nr. Drawing Nr. Revision Drawing Title Quantity Remarks
1. SD - PL-ABK-201 R.1 INSTALASI SUMP PIT DAN DRAINASE, LANTAI 1
2. SD - PL-ABK-301a R.1 POTONGAN A-A, INSTALASI SUMPIT DAN DRAINASE
3. SD - PL-ABK-301b R.1 POTONGAN B-B, INSTALASI SUMPIT DAN DRAINASE
4. SD - PL-ABK-301c R.1 POTONGAN C-C, INSTALASI SUMPIT DAN DRAINASE
5. SD - PL-ABK-301d R.1 POTONGAN D-D, INSTALASI SUMPIT DAN DRAINASE
6. SD - PL-ABK-202 R.0 INSTALASI PONDASI POMPA DAN TITIK SPARING GWT
7. SD - PL-ABK-302 R.0 POTONGAN A-A, B-B, C-C TITIK, SPARING GWT
8. SD - EL-LI-101 R.0 INSTALASI PENERANGAN LUAR, LANTAI 1
9. SD - EL-LI-102 R.0 INSTALASI PENERANGAN LUAR, LANTAI 2

MAR Notes
Execution Schedule
Sent by Date : 30/12/2022
Received by Date :
Descriptions

Comments

Approved By Checked By Issued By


PT. OMETRACO ARYA SAMANTA PT. JAPFA INDOLAND PT. TRIMEGA BANGUN PRIMA

(_____________) (_____________) (____________________)