Question 5  Footbridge with Green Roof 
 
 
Client’s Requirements 
 
The following client’s requirements must be met: 
 
1.  A  new  open  footbridge  with  green  roof  is  proposed  to  connect  two  existing 
buildings as shown in Figure Q5. 
 
2.  Two concrete corbels as shown in Figure Q5, one at each existing building, will 
be  built  for  supporting  the  new  footbridge.  Each  corbel  will  be  designed  with 
sufficient strength to take any magnitude of vertical and horizontal loads from 
the new footbridge. 
 
3.  Three staircases, two at the north and one at the south of the new footbridge 
will  be  built  in  the  next  contract.  Therefore  sufficient  wide  openings  must  be 
provided  in  the  new  footbridge  for  the  future  staircases.  For  safety  sake, 
temporary fencings will be provided by the client to close the gaps for the time 
being. 
 
4.  Any column support to the new footbridge must maintain a horizontal clearance 
of 1.0m between the highway envelope and the face of the column support. 
 
5.  No permanent nor temporary work may be placed within the carriageway at all 
time. 
 
 
Design Requirements 
 
6.  The structural design shall be in accordance with the Structures Design Manual 
for Highways and Railways 2013.  
 
 
Imposed Loads 
 
7.  Footbridge load  LL  5 kN/m2 
 
Green Roof  LL  0.75 kN/m2 
  SDL  5 kN/m2 
 

 
22
 

Site Conditions 
 
8.  The site is in the rural area.  
 
9.  Ground conditions as revealed by boreholes are: 
 
Ground level – 0.8m  Made up ground 
 
0.8m ‐12.0m  Soft clay with undrained shear strength, Cu = 40.0kN/ m2 
 
Below 12.0m  Moderately decomposed rock with allowable bearing 
  Pressure = 3,000 kN/ m2 
 
Ground water was encountered at 2.8m below ground level. 
 
 
Omit from Consideration 
 
10.  Design calculations for the staircases and concrete corbels are not required. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
23
 

Section A 
 
a.  Prepare a design appraisal with appropriate sketches indicating two distinct and 
viable  schemes  for  the  proposed  footbridge  including  the  foundations  and  the 
green roof. The functional framing, load transfer, safety and stability aspects of 
your  schemes  must  be  clearly  indicated.  Identify  the  solution  you  recommend 
and give the reasons for your choice. 
(40 marks) 
 
 
Section B 
 
For the solution recommended in Section A: 
 
b.  Prepare sufficient design calculations to establish the form and size of all main 
components including foundations. 
(20 marks) 
 
c.  Prepare  general  arrangement  drawings  including  sufficient  plans,  elevations, 
sections  etc.  for  the  footbridge  structure  including  the  green  roof  for  quantity 
taking off purposes. 
(20 marks) 
 
d.  Prepare  a  detailed  method  statement  covering  essential  activities  for  the  safe 
construction of the footbridge including foundation works. 
(10 marks) 
 
e.  Prepare  a  detailed  construction  program  covering  essential  activities  from 
commencement of foundation to completion of structural works. 
(10 marks) 
 
 

 
24
End of Paper
6 6
11m wide x 5.1m high 11m wide x 5.1m high
6 11 10 11 6
1 3 2 2 3 1
3 4 3