12228062
GUIZ 1
leads errosional
to
velocity (MMSCF/d) according to API RP 14E
Answer.
⑨ to determine tubing material, we need Partial
calculate
to Pressure
of CO2, H2S,
and Bottom Hole temperature
known.
mole:15 x 10 mole
BHT 2400F
=
CO2 5% mole
=
Answer.
PCO2 %
=
Mol CO2 xPBH 5%x0500p5i 425p5i=29,302
=
= bar
=
=
=
BHT 240°F
=
115,556°
=
7
PH2S 0,00879
=
bar
BHT 115,55°C
=
the suitable material for this tubing is SMIBCRS termasuk dalam kategori
yang
⑥ known.
ID 2,992 inch
Tubing
=
->
the erosional
Calculate velocity from API RP I4E
Ve C
=
-
empirical constant
Pm liquid
->
density
Find
Pr
->
250
SG 141,5
Pm 12409S,p 2,7RSgP 0,825
=
= +
190,7P +
RTZ 131,5 40 +
Where,
P operating
=
pressure, psia
S:liquid SG(water=1) &SC
R Gas/liquid
=
ratio, ft/bbl @SC
T Operating temperature, Ro
=
z
->
Assuming z 1 = 8 R 100
=
ft
Pm 12409S,p 2,7RSgP
= +
190,7P +
RTZ
Om 49,53845(b/ft3
=
-> therefore
Ver C - 150 ft
=
21,3118
=
min j
49,53845
Don
remax= C -
200
28,4157
=
49,53845
Don
->
2
=HD x Ve
4
9 min -
9
1,040299t3x(3600;24) 100
=
x MM
9 0,0898 MMSCf
=
day
**(0,2493ft) -
x20,4157ft): 1,3878555
4
9
1,040299t3x(3600;24) 100
=
x MM
9 0,11904
=
MMSCf
day
So, with the
assumptions R
of 100ft
=
21,3118
fts
-
28,4157ft
the around
and
9 is
0,00900
moscf/d-0,11984 MMSct/day