METHOD STATEMENT FOR THE INSTALLATION OF


LIGHT FIXTURES

METHOD STATEMENT FOR THE INSTALLATION OF


LIGHT FIXTURES
Client : SALCOMP TECHNOLOGY INDIA PVT LTD
Contractor : MADHUSREE ENGINEERING PVT LTD
Document No : SALC/MSE/ELE/02
Document revision status : 00

Revision and Authorization Record:

Cont.
Ele Engg Quality Engg Client
Rev Date Description Manager
Prepared Checked Reviewed Approved
MADHUSREE ENGINEERING PVT LTD

Page 2 of 5

Table of contents
Sr. No. Section Title of the Chapter Page No
1 1.0 Purpose : 3
2 2.0 Scope : 3
3 3.0 Manpower Deployment : 3
4 4.0 Equipment / Materials : 3
5 5.0 Responsibilities : 3
6 6.0 Precautions and Safety measures : 4
7 7.0 Procedures : 4
MADHUSREE ENGINEERING PVT LTD

Page 3 of 5

1.0 PURPOSE
This method statement outlines the procedure for the safe and efficient installation of light
fixtures. The objective is to ensure that the installation is carried out in compliance with
relevant safety regulations and manufacturer guidelines, minimizing the risk of accidents or
damage to property.

2.0 SCOPE
This method statement applies to the installation of light fixtures.

3.0 MANPOWER DEPLOYMENT:

1 Site Engineer
2 Supervisor
4 Safety
5 Quality
6 Admin
7 Fitters
8 Electrician
9 Helper

4.0 EQUIPMENT/ MATERIALS:


 Light fixtures, including lamps and bulbs
 Mounting brackets or hardware
 Wiring and conduit
 Wire connectors
 Screwdrivers, pliers, and other hand tools
 Ladders or scaffolding (if required)
 Personal protective equipment (PPE) such as gloves, safety glasses, and safety shoes
 Voltage tester or multi meter

5.0 RESPONSIBILITIES:
MADHUSREE ENGINEERING PVT LTD

Page 4 of 5

 The project manager will be responsible for overseeing the installation process and
ensuring compliance with safety standards.
 The electrician or qualified personnel will be responsible for the actual installation,
including wiring and connection of light fixtures.

6.0 PRECAUTIONS AND SAFETY MEASURES:


 Wear appropriate personal protective equipment (PPE) throughout the installation
process.
 Ensure that all electrical power is switched off before beginning any work.
 Handle lamps and bulbs with care, avoiding breakage and contact with bare skin.
 Use ladders or scaffolding safely and securely when working at heights.
 Follow local electrical codes and regulations to ensure compliance and safety.

7.0 PROCEDURE:

Step 1: Pre-Installation Preparation

 Review the electrical plans and lighting design to identify the location and type of light
fixtures to be installed.
 Ensure that power to the installation area is turned off at the main electrical panel.
 Inspect the work area for any potential hazards or obstructions, and address them
accordingly.
 Gather all necessary materials and equipment required for the installation.

Step 2: Mounting and Wiring

 Select the appropriate mounting location for each light fixture as per the lighting
design.
 Install mounting brackets or hardware securely, following manufacturer instructions
and ensuring proper alignment.
 Run the electrical wiring and conduit from the power source to each light fixture,
adhering to local electrical codes.
 Connect the wiring to the light fixture, making sure to match the correct wires (e.g.,
neutral, hot, ground) and using appropriate wire connectors.
 Verify the electrical connections with a voltage tester or multimeter to ensure there
is no current flow.

Step 3: Fixture Installation


 Carefully mount each light fixture onto the previously installed brackets or hardware,
aligning it properly.
MADHUSREE ENGINEERING PVT LTD

Page 5 of 5

 Secure the fixture in place using the provided screws or fasteners, ensuring it is stable
and level.
 Install lamps or bulbs according to manufacturer specifications, making sure to handle
them with care and avoid contact with bare skin.
 Check that all fastenings and connections are tight and secure.

Step 4: Testing and Commissioning

 Restore power to the installation area by turning on the electrical circuit at the main
panel.
 Test each light fixture by switching it on and off to verify proper operation.
 Inspect for any flickering, loose connections, or abnormal behavior, and address any
issues promptly.
 Conduct a final inspection to ensure all light fixtures are installed correctly and meet
the required standards.