Programme PSNP4 Subproject Name 01: Range Land management and Biophysical Soil and
Water Conservation
Activities: ___________________________________________________
Yes No
Subproject involves abstraction form rivers draining into the Nile Basin
Other (specify):
Mitigating Measures Required
Prepare an environmental management and monitoring plan (EMMP) for all mitigation measures identified above. Indicate timing for
implementing each activity, duration of monitoring, responsible institutions, cost estimation, etc.
Mitigative measures (MM) Time of Responsible Issues to be Responsible Time of Estimated cost
implement body to monitored institutions monitorin to implement
ation implement to monitor g MM (Birr)
MM
Name Position/title Signature
<
<
<