Anon Team Key Date: Milestone 1 Modified:
team:
Occurrence
Detection
Severity
Process Failure Potential Failure Preventive Recommended Responsible Actions
RPN
Function Failure Effect C Detection Action
Step Mode Cause Action Actions & Deadline Taken
Granulate
Controlled
moisture content First off
1 environment 2 16
is out of inspection
within the Silo
tolerance
Problems with Incorrect type of Work First off
2 1 16
assembly to tool Instructions inspection
8
customers Initial setup by
First off
vehicle Manufacturing
Incorrect inspection
Engineer
temperature 1 2 16
settings
Problems with
assembly to
8
customers
vehicle
Incorrect
temperature 1 2 16
settings Work Operator visual
Instructions inspection
Initial setup by
First off
Manufacturing
inspection
Incorrect Engineer
1 2 16
pressure settings
Work Operator visual
Instructions inspection
Initial setup by
First off
Manufacturing
inspection
Incorrect cycle Engineer
1 2 16
time
Work Operator visual
Warranty Instructions inspection
6
returns
Incoming
Incorrect type of Inspection
1 NONE 10 80
granulate Work
Instructions
First off
Total inspection
Worn tool 3 Preventative 2 48
Maintenance Operator visual
inspection
3/3/2008
1/1/2008
Occurrence
Detection 1
RPN
Page: Process FMEA
Detection
اإلجراءات األسباب المحتملة
التواتر
المسؤول واألجل التوصيات RPN إجراءات اإلكتشاف األعمال الوقائية تأثير الخطر المخاطر المهام العملية
األثر
المتخذة للمخاطر C
Granulate
Controlled
First off moisture content
16 2 environment 1
inspection is out of
within the Silo
tolerance
First off Work Incorrect type of Problems with
16 1 2
inspection Instructions tool assembly to
8
Initial setup by customers
First off
Manufacturing vehicle
inspection Incorrect
Engineer
16 2 1 temperature
settings
Problems with
assembly to
8
customers
vehicle
Incorrect
16 2 1 temperature
Operator visual Work settings
inspection Instructions
Initial setup by
First off
Manufacturing
inspection
Engineer Incorrect
16 2 1
pressure settings
Operator visual Work
inspection Instructions
Initial setup by
First off
Manufacturing
inspection
Engineer Incorrect cycle
16 2 1
time
Operator visual Work
inspection Instructions Warranty
6
returns
Incoming
Inspection Incorrect type of
80 10 NONE 1
Work granulate
Instructions
First off
inspection Total
48 2 Preventative 3 Worn tool
Operator visual Maintenance
inspection
Detection
1
التواتر
3/3/2008
1/1/2008
األثر