Repairing of dorm

S.No. Description Qty Unit L.Cost M.Cost

1 Mobilisation 1 Ls 90.000

2 Drawings & Submittals 1 Ls 100.000

3 Door removal 1 No 36.000

4 Door repurpose 1 No 36.000 25.000

5 CMU demolition and finishing 2.64 M2 27.273 3.788

6 CMU Block work 2.64 M2 13.636 20.833

7 Painting 5.28 M2 6.818 4.167

8 Door refixing 1 No 36.000 15


Date: 27-05-2022
Eq. Cost Unit Cost Amount

90.000 90.000

100.000 100.000

36.000 36.000

80.000 141.000 141.000

15.152 46.212 122.000 2.64

15.152 49.621 131.000 2.64

10.985 58.000 5.28

51.000 51.000

729.000
$ 2,398.41