Fault Report Form
Fault Report Form
Report Details
To be completed by the Originator and Line Supervisor
st
Activity: Nitrogen Helium Leak Test on the Test Package 16, Train A & Train B 1 LP Compressor Discharge and
Intercooler.
On the above date and time, our work group was tasked to perform N2HE Leak Test on Test Package 16, Train A & Train B
st
1 LP Compressor. Upon performing the necessary checks and obtaining the relevant permit to work, we started
to pressure up the system. During pressurization to 25% (6.4 bar), Pressure Relief Valve on Train A & B were lifted.
Upon hearing the popping sound, night shift Supervisor stop the pressurization immediately and check with the Pump
Operator at the Quay Side. However, no pressure was shown on the pressure gauge located at the monitoring point.
Supervisor performed additional checks on the system gauge and discovered there were 28 bar in the system. Due to
1. The hose connection is connected to diaphragm seal not directly to the double block bleed valve. Since it is
connected to the diaphragm seal, it can only sense the pressure thus not allowing the process air to flow through for
1. Review of all test packs to determine the location of tie - in points (injection / return).
2. Installation of additional gauges in two more location (one at OPP, one at quayside (pump).