1.1 Concept
1.2 Plan
2.3 Details
8 PROJECT TURNOVER
SD PHASE (3 WEEKS)
THE ABOVE PROJECTED TIMELINE IS TENTATIVE AT BEST, AND MAY BE
CD PHASE (7 WEEKS)
NOTE: SUBJECT TO CHANGE BASED ON DEVELOPMENTS DURING THE DESIGN
TENTATIVE (ASSUMED A MAXIMUM OF 3 MONTHS CONSTRUCTION)
PROCESS.