You are on page 1of 6

DATA SHEET FOR LOW VOLTAGE

SWITCHBOARD/MCC

1 May 2021 Compliance to revised specification MT MD


0 02-02-2002 Approved Issue
rev. date Description/issued for prepared authorised
client:
project: STANDARD SPECIFICATIONS FOR WATER WORKS
title: DATA SHEET FOR LOW VOLTAGE SWITCHBOARD/MCC

tender: project: document: W-E-SD-002 rev: 1 sheet: 1 of: 6


Item : LOW VOLTAGE SWITCHBOARD/MCC

Tag Nos. :

Item Description Unit Data to be filled in by the Contractor

1. Manufacturer:
- Name *
- Country *

Local Agent
- Address *
- Telephone *
- Fax *
- Email *

2. Model No. *

3. Standard/Code Applicable IEC

4. Local Conditions

4.1 Location **

4.2 Climate
- Tropical/Arctic/Temperate **
- Ambient Temperature **
- Relative Humidity **

4.3 Languages
- Labels English
- Rating Plates English
- Documentation English

4.4 Installation
- Indoor/Outdoor **

Notes (Common to all the pages):

1) * These variables to be filled by Vendor/Contractor.

2) ** These variables to be filled by the issuer.

3) All data sheets to be filled for each type/size/rating of equipments offered.

NAME OF TENDERER DATE STAMP & SIGNATURE

Client
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: DATA SHEET FOR LOW VOLTAGE SWITCHBOARD/MCC

tender: project: document: W-E-SD-002 rev: 1 sheet: 2 of: 6


Item : LOW VOLTAGE SWITCHBOARD/MCC

Tag Nos. :

Item Description Unit Data to be filled in by the Contractor

- Under Sunshade/Without Sunshade **


- Area Classification (Safe/Hazardous) **

5.0 Design

5.1 System
- 3 Phase + Neutral **
- Unearthed **
- Impedance earthed **
- Solidly earthed **

5.2 Rated Voltages:


- Line to line V 415
- Line to earth V 240

5.3 Rated frequency Hz 50

5.4 Phase sequence

5.5 Rated current Amps *

5.6 Medium of switching Air

5.7 Rated short circuit withstand current


- rms for 1 secs. kA **
- Max. peak kA **

5.8 Auxiliary voltages


- Internal/external **
- Control voltage V **
- Protection V **
- Signalling V **

NAME OF TENDERER DATE STAMP & SIGNATURE

Client
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: DATA SHEET FOR LOW VOLTAGE SWITCHBOARD/MCC

tender: project: document: W-E-SD-002 rev: 1 sheet: 3 of: 6


Item : LOW VOLTAGE SWITCHBOARD/MCC

Tag Nos. :

Item Description Unit Data to be filled in by the Contractor

6.0 Construction

6.1 Type
- Metal clad **
- Cubicle **
- Compartmented **
- Fully insulated **
- Drawout/semidrawout **

6.2 Busbars
- Phase busbars Single/ **
Double
- Sections **
- Insulation **

6.3 Relays Contractor shall submit detailed list of


relays, contactors, CTS and PTs (type,
6.4 Metering VA, ratio) selector switches and meters
shall be provided for each incoming/
outgoing feeder as per single line
diagram and project specific requirements

6.5 Wire numbering *

6.6 Enclosure class IP **

6.7 Mounting
- Free floor standing **
- Wall mounting **

6.8 Access
- Front only *
- Back only *
- Both *

NAME OF TENDERER DATE STAMP & SIGNATURE

Client
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: DATA SHEET FOR LOW VOLTAGE SWITCHBOARD/MCC

tender: project: document: W-E-SD-002 rev: 1 sheet: 4 of: 6


Item : LOW VOLTAGE SWITCHBOARD/MCC

Tag Nos. :

Item Description Unit Data to be filled in by the Contractor

6.9 Termination
- Cable glands/gland plates *
- Cable boxes *

6.10 Accessories
- Lifting lugs *

6.11 Physical dimensions


- Dimensions (LxWxH) mm *

6.12 Total mass kg *

6.13 Paint finish


- Colour **

7.0 Inspection and Testing

7.1 Inspection
- During manufacturing **

NAME OF TENDERER DATE STAMP & SIGNATURE

Client
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: DATA SHEET FOR LOW VOLTAGE SWITCHBOARD/MCC

tender: project: document: W-E-SD-002 rev: 1 sheet: 5 of: 6


Item : LOW VOLTAGE SWITCHBOARD/MCC

Tag Nos. :

Item Description Unit Data to be filled in by the Contractor

7.2 Routine tests


- All required **
- Certificate **
- Witnessed/not witnessed **

7.3 Type tests


- All required **
- Certificate **
- Witnessed/not witnessed **

7.4 Special tests


- Witnessed/not witnessed **

8.0 Packing Required (as specified)

9.0 Documentation Required (as specified)

NAME OF TENDERER DATE STAMP & SIGNATURE

Client
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: DATA SHEET FOR LOW VOLTAGE SWITCHBOARD/MCC

tender: project: document: W-E-SD-002 rev: 1 sheet: 6 of: 6