Professional Documents
Culture Documents
10
2*4
250
10*10
10
260
TUBE ALUMINUM
2*4
NOTE:
All dimension are in centimeters. (cm)
7
DESCRIPTION
26 R2
0 R1
640 REV. NO. DATE
15
640
PROJECT:
VIEW PLAN
LOCATION:
CLIENT:
1) All the post 10*10 will be attached to the foundation by bolts PERGOLA DETAILS
2) All the aluminum horizontal tubes 2*4 cm will be attached by welding it onto the pillars DWG NO:
ISSUE DATE :
SCALE: NTS
3) The polycarbonate sheet will be installed after the structure is completed
SHEET SIZE - A3
ARCHITECTS: