You are on page 1of 27

Document Cover Sheet

Document Title J39187-Painting Procedure

Project Name Oyu Tolgoi Concentrator Project


Worley Project Number SN1809
P/O Number CW2164773

VDRS Code S023


Client Number 3000-95-PRC-8035

Vendor Document Number 39187 - PRO - 001


Worley Document Number CW2164773-S023-0001
Subject of Revision Issued for Review
Revision A
Date

Rev Date Rev Description Prepared Checked


A 2022-11-09 Issued for Review BX BX

Contractor/Supplier/Vendor Technical
Document and Drawing Review for SN1809A0 -
OT Underground Project

Reviewed with No Comments.


1
(Construction/Fabrication may Proceed)
Reviewed with Minor Comments.
2 Revise and resubmit "Final Version" incorporating comments.
(Construction/Fabrication may proceed thereafter)
Rejected with Major Comments.
3 Correct and resubmit "For Review" incorporating comments.
No comment from (DO NOT PROCEED with Construction or Fabrication)
Not Reviewed ‐ Received For Information Only.
4
No further submission is required.
SQS
5 Certified
Jerry Ye
6 Cancelled
11/21/2022
7 Closed

8 Superseded

Submit Certified Document


YES NO

Responsible Engineer Nathan Digitally signed by Nathan McColl


Date
DN: cn=Nathan McColl, c=CN,
email=nathan.mccoll@worley.com
Equipment Tag No
McColl Date: 2022.11.22 10:27:52
+08'00'
Client Document No.
3000-95-PRC-8035
Worley Document & Submission No
CW2164773-S023-0001_R1
AUTHORISATION TO PROCEED DOES NOT RELIEVE THE VENDOR/CONTRACTOR OF ANY RESPONSIBILITY, OBLIGATION OR
LIABILITY UNDER THE PURCHASE ORDER/CONTRACT. NO RESPONSIBILITY IS ASSUMED BY WORLEY FOR CORRECTNESS OF
DIMENSIONS OR DETAILS. SHOP DRAWINGS ARE ACCEPTED AS FOR INFORMATION ONLY (NOT REVIEWED).
VENDOR/CONTRACTOR IS FULLY RESPONSIBLE FOR SHOP DRAWINGS.

You might also like