No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 2 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
The top of the monitor will be at eye level to 2*2=4(L) Use control
1.4 Using Improper use Lack of Headache, 2 2 4 (L) avoid neck strain. measures
Visual and handling awareness and Eyestrain, The screen will be 45-60 cm away from the
Display of computers. poor Neck strain user’s eye.
Units maintenance. and work The keyboard will be directly in front of the
(VDUs). related user.
upper limb The user’s elbows will be bent at ninety-
disorder. degree angle to allow the user’s wrist to
be in a neutral position.
The screen will be positioned at right angle
to the window to avoid glare.
Information and training on the risks and
control measures associated with VDU
work will be given to all operators.
2. CIVIL WORKS
Infection, 3 Competent personnel will be assigned to do
2.1 Mobilization Ingress of Unsafe act Fatality/ injury to 5 15 (H) the job. Control
5*2=10(M)
snakes or any caused by the personnel Eliminate all hazards. Only trained and Measures
other moving inexperience qualified personnel are required to do the job must be used.
hurting insects personnel Wear suitable head protection, foot
or attaching No safety protection and clothing.
animals precautions are
used.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 3 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
2.2
Working under
direct sunlight /
working at high Heat stroke Excessive sweating,
temperature. Heat cramp skin rashes, Reduce activity levels / or heat exposure.
Ramadan Heat Giddiness, Drink plenty of fresh pure water and
Time exhausti unconsciousness. rehydrating fluids. Workers will check each
on other to spot the symptoms which often
precede heat stroke
Illness / _ Avoid working in day heat times (Arrange
Headache, the working times to be early or lately with Follow all the
Eyestrain, sufficient lighting) control
-Measure the temp. to be sure that the temp. measures
is not exceed
2*2=4(L)
2 4 8 (M)
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 4 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
Working nearby - Contact -Bad safety signs Fatality/Serious 4 3 12 M -Ensure The gate control height and Lifting Using Pump
OHTL with - No PTW Injuries/ Elec. Cement
plan for the working area
OHTL No Area moving control shock
- Ensure that moving of the concrete pump is
- Work
within the safe distance with OHTL
nearby
_ Ensure Sufficient lighting in the night shift
OHTL
-Ensure Height control of the pump hose.
Safe entry & exit will be provided. Follow all
2.4-Excavation activities Working Unsupported Fatality. 5 3 15 (H) Permit to work system will be followed. control
5*2=10(M)
inside sides of excavation Soil investigations/test to assure the measures
Excavation collapsing. Injury/ suitable side support while excavation
without safe Fracture to the Supports systems like Drag
access
or Personnel falling. personnel. boxes/shields/sheets/ shoring etc. will be
aggress. provided for all the trenches, if its depth is
Working Materials/trucks more than 1.5 meters. All Excavations will be
inside falling in to
the Serious fenced or protected by guardrails. Materials,
confined excavation. injury to the Soil from the excavation will be placed away
space person from the excavation (2 meters away)
- Damage to No excavation work may be carried out
Working under existing utilities. Property without the knowledge and approval of the
Confined space high tension Accumulation of damage company project manager or his authorized
transmission groundwater or representative and work permits prepared
line rainwater and issued as necessary.
Examine plot plans of underground
services.
Lack of oxygen Low voltage to be used with ELCB
Harmful gasses Gas detector to be used before entering
hard of breathing the confined space
Measure the Safe access and egress
clearance & according Watch man must be available
to it we must work in Using baby loader with height less than
safe distance away 2 meter with full supervision from our safety
from the clearance not rep inside & permit to work
to use any metal, over
height 2 meter
Study the soil
report to know the most
suitable way to
excavate
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 5 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 6 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
2.8 Erection Fall of Failure of Fatality 5 4 20 (H) All scaffolds to be erected to the 5*1=5(L)
Minimize risk
and person structure – Serious injury relevant standard or to a design
using control
dismantlin Fall of caused by to personnel drawing as appropriate. Ensure that all
measures
g of material incorrect erection, Material scaffolders have received proper
scaffolding Manual dismantling or damage training. Persons requesting a scaffold
Handling failure of must detail the intended use.
component. Each completed general-purpose
-lack of scaffolds scaffold must be inspected and
materials approved for use by a qualified scaffold
Erections by in charge and the work supervisor.
incompetent Inspection must take place on: (1) initial
scaffolder erection, (2) each week thereafter, and
Bad access to the (3) after alteration or relocation.
scaffolds The tag shall be signed and dated and
Unsafe walk ways must only be removed by the scaffold in
Not fix the charge.
scaffold in safe Use scissor lift that must be calibrated
way Only competent scaffolder is allowed to
erect or dismantling scaffolds.
Scaff tag must be used.
Night Shift _No sufficient -Slip/trip hazards -fatality S L 9M -Ensure full lighting for the site
lighting -elec. Shock -Serious injuries 3 3 -Ensure sufficient lighting with clear vision
-No - -Simple injuries
-Ensure full time SM & SR
emergency
-Ensure full time emergency car &
car
Emergency team
- No
-Ensure gate control to prevent any
emergency
unauthorized persons to enter the site
teams
-Ensure full supervision for all running
-No gate
activities
controls
-Ensure Elec. Man to monitor all elec.
-No full time
Connection and ensure good lighting in the
SM /SR
site whilst working time.
- No Elec.
- Not allowed for high risk activities such as
Man for
working at height or confined space
maintenance
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 7 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 8 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
2.1 Manual Fall of Slip, trip, falls. Sprain/strai 3 3 9 (M) 3*2=6(L) Tolerable risk
0 Handling person n type of
Fall of injuries,
material particularly,
Cramp to neck,
injures Hazards from lower back
Sharp tools/ and groin
objects and
equipment.
2.1 Painting/ Tripping Slips, trips and Injury to 3 3 9 (M) All paint products shall be supplied with No further
3*2=6(L)
1 handling hazards falls personnel Material Safety Data Sheet (MSDS). control
chemicals from air The painting supervisor is responsible required
and their hoses, Skin contact, Acute or to review and to take necessary
storage. hazards inhalation or chronic precautions. Paint products are
from ingestion health flammable; therefore, they shall be
dangerou paint/solvents. effects stored away from direct sunlight and hot
s Fire/explosion depending work activities. No smoking in the
materials on the vicinity of paint product. Adequate
. substance ventilation shall be provided where
used. paint products are stored. Painting
activities shall be planned to avoid
contamination to other employees and
nearby activities. Painters shall be
trained to correctly use respiratory
protection as required by manufacturer.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 9 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
2.1 Fabricatio Physical Airborne particles Eye injuries 3 3 9 (M) Follow strictly precautions mentioned in
3*2=6(L) Follow all the
2 n & hazards. and welders flash. like arc eye, Hot Work Permit.
control
Welding & High noise levels. foreign Fire extinguisher and fire blanket will be measures
cutting Chemical Slip, Trip, Falls. body etc. kept at the place of hot work with watch
activities hazards. Inhalation of toxic Deafness. man
Marbles & fumes. Serious Wear suitable face, ear & eye
Granite Ergonom Hot welding slag/ injury to the protection.
The ics burning spatter personnel. General Housekeeping. All the cables
Heater in Fire and arc/ flame. Respiratory hoses and other materials will be kept
welding Fill the cad weld illness. away from the walkway. Oil spillage to
plastic over limit Burn injury, be cleaned up immediately.
pipes Arc eye Extract toxic fumes from the work area.
Adequate ventilation will be provided
and respiratory protection will be worn
Fire / Spark or any Fire, Flammable / Combustible materials will
5 4 20 (H) 5*1=5(L) Follow all the
Explosio other ignition Fatality/ be kept away from the area. All the
control
n source from injury to the connection, cables, equipments will be
Welding measures
Electrocuti flame/ arc, or personnel checked in prior to use.
the earth on faulty welding due to
wires equipment. electric
using Cad shock and
Weld the
equipment
damage.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 10 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 11 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
2.1 Extension Electrical Electrocution Fatality. 5 3 15 (H) Main power supply will be cut off while
5*2=10(M) Follow all the
3 of Hazards Electrical shock doing any modification. With clear letter
control
electrical Serious and approvals from utility and
measures
supply personnel supervision.
from injury. ELCB/GFCI must be used with rate 30
distribution mA and 0.6 second and must be fixed
board for Electrical not adjustable.
tools & fire
Equipment Qualified electrician will carry out the
.- activity and inspections on monthly
basis (tested).
-Earthing the
neutral point Insulated tools must be used while
from the main handling electrical activities.
source (utility)
before EPIC Full time supervision
main elec. DB.
ALL elec. Safety hand protection and footwear
DB fitted must be used. (arc flash wear and
with fixed isolated elec. Gloves are mandatory)
ELCB or
GFCI or HSE instructions and ensure LOTO
RCD system and PTW and 7 steps that safe
life applicable.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 12 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
3.1 Erection of Mechani Overloading the Serious 3 3 9 (M) Never overload the crane Always
3*2=6(L) Follow all the
Switchgea cal crane, or personnel operate the crane with the stabilizer
control
r and handling operating it on injury. arms extended. Never operate the
measures
LVAC (Crane/ sloping / insecure crane on sloping or soft ground.
boards, Fork lift ground, or without Property
DC etc.) the stabilizers. damage. Only use slings strong enough for the
distribution job. Never bend, knot or twist slings.
boards, Using incorrect Fatality/ Never use damaged slings. Cut and
Battery lifting equipment Serious scrap damaged slings / hooks etc.
charges) or damaged injury.
slings. Make sure slings have the current color
code. If using lifting subs, makes sure
Poor signals from they are the correct size and thread and
signalman. they are on tight.
3.2 Cable Laying Cable Handling wrong Fatality/ 5 2 10 (M) Selection of equipment to suitable
5*1=5(L) Follow all the
Laying of Cable laying, tools / damaged Serious standards.
control
as follows: dressing tools personnel Ensure good insulation.
measures
Power and injuries/ Qualified and trained electricians are
transforme terminati Property required.
r to on. damage. Ensure circuits are designed to be
switchgear Laceration capable of carrying all foreseeable
. or abrasion loads.
wound Protective clothing, hand protection,
foot protection & head protection shall
be used.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 13 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
Materials falling in Serious 4 2 8 (M) Any material for use in the excavation
4*1=4(L) Follow all the
to the excavation. injury to the must be safely stacked along side to
control
personnel. avoid falling in to the trench.
measures
Asphyxiation or Soil from the excavation will be placed
Poisoning. Fatality/ away from the excavation (at least 2
Acute and meters away)
chronic A survey may be needed where ground
health is likely to be contaminated.
effect Before opening an excavation, the
supervisor in charge determines to the
extent possible whether underground
installations, such as sewer, water, fuel,
electric lines, telecommunication lines,
or plant product lines, will be
encountered. If so, the approximate
locations are marked and employees
involved in the work operation are
advised of the underground
installations.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 14 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
Heavy Fire & Explosion Fatality/ 5 2 10 (M) All the hazard warnings will be
5*1=5(L) Follow all the
equipme serious recognized and obeyed
control
nts may personnel Vehicles must stay at least 5.5 meters
measures
contact injury/ from energized lines.
with the Property Workers standing on the ground near
live lines damage. power lines must not contact the
while vehicle, equipment, or any attachments.
carrying Qualified and experienced workers are
out permitted to work on or near exposed
construc energized electrical parts.
tion Using of insulated tools and wearing of
activitie personal protective equipment are
s. must.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 15 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
5*1=5(L)
5 2 10 (M) Where possible, the breaker will be
Follow all the
removed. Any switch directly controlling
control
the supply must be “locked off” and
measures
where practicable the key retained by
the authorized person. “Lock out”
must be clearly defined to prevent
possibility of any unauthorized person
unlocking the switch.
In power stations, substations and at
load centers, the proper “Danger
Notice” must be attached prominently to
all switches directly controlling the
section to be worked on and must not
be removed except by the authorized
person.
It is advisable to place notice or
placards giving details of emergency
resuscitation procedures in case of
electrical shock at those locations
where the risk is greater. E.g. testing
area, substations.
Use arc flash suit
PTW is must
Handling SF6 Eye contact Eye Redness / 2 3 6 (L) Keep eyelids open to allow evaporation 2*2= 4 (L) Tolerable Risk
cylinders Skin contact skin of product.
irritation MSDS will be followed strictly
Rinse with running water
Hand gloves, protective clothing, safety
foot wears shall be worn.
All compressed gas bottles must be
secured and kept in upright position.
When transported, cylinders must be
strapped in properly trolleys or held
Serious injury to securely when transported in vehicles.
Improper handling of personnel 3 9 (M) MSDS is must be in site and well known
3 3*2=6(L)
cylinders to all concern persons
Tolerable Risk
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 16 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
3.3 Erection of Using of crane -Failure of lifting Fatality 5 3 15 (H) 5*2=10(M) Tolerable Risk
transforme / Forklift equipment Serious Injury Hard barriers over the transformer to
rs and other -Incorrect use of lifting Property prevent falling from height
heavy equipment damage Approved Method statements shall be
equipme -Inexperienced available at site before the operation
nt manpower and strictly followed throughput the
Structure failure operation.
-Falling from the top of Hard barriers to be erected at the top of
the transformer the transformer with safe access to the
top of the transformer
Close supervision
PTW is must be used
All the lifting tackles will be checked
and must have valid 3rd party certificate.
Single person shall do communication
with the crane operator.
Tag line shall be used for all heavy
loads.
Safety hard hats, rigger gloves & safety
shoes used as PPE.
4.1 Erection of Charging Burn to skin, Burn Serious 4 3 12 (M) Trained and experienced personnel
4*2=8(L) Follow all the
industrial / to eyes personnel required.
control
batteries Changin injury First Battery charging and installation shall
measures
g/ aid case be located in areas designated for that
Handling purpose.
of PTW is must be used
batteries Protect eyes from acid splash when
removing cell caps for charging.
Provide eyewash near battery room for
emergency purpose
Use appropriate PPE (safety glasses,
Rubber gloves, Face shields, Rubber
apron etc.)
MSDS to be fully implemented its safety
precautions
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 17 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
5*1=5(L)
Fire/ Explosion Fatality/ 5 2 10 (M) Do not smoke near the battery
Follow all the
Serious charging/ storage areas.
control
injury to Precaution shall be taken to prevent
measures
personnel/ open flame sparks, or electric arcs in
Property battery charging areas.
damage. Charge batteries in a well-ventilated
area.
Do not strike the sides of the battery
with any spark producing items.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 18 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 19 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
6.2 High Voltage Falling from Not using the safety Serious 4 3 12 Ensure circuits are designed to be 4x1=4 Follow all the
testing heights – High belts. Personnel injury capable of carrying all foreseeable loads. control
(Switchgear/Sw Voltage Shock Not following the safety – shock and Qualified & Experienced personnel are measures
itchyard High signs and precautions serious burns permitted to work on or near exposed
Voltage test – energized parts & for the activities.
Equipment
Insulation Test)
6.3 Low Voltage Falling from Not using the safety Serious 4 3 12 All hazard warnings will be recognized 4x1=4 Follow all the
testing heights – belts. Personnel injury and obeyed. control
(Transformer Electrical Not following the safety – burns Before any electrical apparatus is measures
stability test) Shock signs and precautions worked on, the authorized person must
ascertain that the apparatus is safe by de-
energizing it from all possible sources of
supply.
6.4 Secondary CB explosion Using the CB before Serious 2 2 4 Any switch directly controlling the 2x1=2 Follow all the
injections (for – Property filling the SF6. Personnel injury supply must be LOCKED OFF and where control
protective damage Applying unsuitable – property practicable the key retained by the measures
relays and injections to the damage authorized person.
instrumentation property LOCK OUT must be clearly defined to
) and CB prevent possibility of any unauthorized
tripping person unlocking the switch.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 20 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
6.5 Commissioning Arcing flash Not using PPE. serious 4 4 16 It is advisable to place notice or 4x1=4 Follow all the
of LV apparatus over – burning Un-trained employees Personnel burns placards giving details of emergency control
(AC/DC Boards liquids – eyes injuries resuscitation. measures
– Batteries and and burns While doing testing @ substations and
Battery at load centers, the proper DANGER
chargers NOTICE must be attached prominently to all
switches directly controlling the section to be
worked on and must not be removed except
by the authorized person
6.6 Commissioning Electrical Un-trained employees. Personnel injury 3 3 9 Necessary protective devices such as 3x1=3 Follow all the
of control and shock – CB Using the CB before – Property earth leakage circuit breakers shall be control
interlocking explosion filling the SF6 damage provided in the circuit to avoid risk of shock, measures
circuits fire or burns.
(Operation of Adequate supervision shall always be
CBs and there at work locations.
Isolators)
6.7 Covering punch Work beside Un-trained employees. Death 5 3 15 The person assigned for the testing and 5x1=5 Follow all the
items life parts Not following the safety other activities shall wear the necessary control
signs and precautions personnel protective equipment to avoid measures
electrical shock, or burns.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 21 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
7. HVAC ACTIVITIES
7.1 Offloading & Operation of Failure of lifting Injury to 3 3 9 (M) Lifting equipment will be well maintained and 3*2=6(L) Tolerable risk.
erection of lifting equipment. personnel regularly checked by competent person. No further
units using equipme and Properly trained and competent controls are
Heavy nts property personnel will be assigned to do the required
equipment damage. job.
s. Dropped load – if lifting Color-coding and test certificates shall be
gears used are Fatality or checked to ensure validity. All
not designed to serious equipments shall be inspected for
support the load. injury. damage prior to use.
7.2 Handling of Chemicals Improper handling of Skin irritation, 3 3 9(M) Safe working procedures will be followed. 3*2=6(L) Tolerable Risk
insulation hazards hazardous redness Full sleeve overalls with PVC gloves will be
materials from the materials and that results worn by persons engaged in the activity
and insulation inadequate in to protect skin.
cladding. materials training Dermatitis. In worst dust case consider damping work
piece to reduce the risk of airborne
containments.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 22 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
7.3 Working at Fall of Failure of structure – Fatality or 5 3 10 (H) All scaffolds to be erected to the 5*2=10(M) Control
height / person caused by serious relevant standard or to a design measures
elevated Fall of inadequate injury to drawing as appropriate. Ensure that all must be
platforms material erection, personnel scaffolders have received proper implemented
-Erection of the Collapse overloading of - Dama training. Persons requesting a scaffold and followed
bus bar of scaffold or failure ge to must detail the intended end use. strictly
-Suspended structure of component. materi Each complete general-purpose
Scaffold -Wires failure als scaffold must be inspected and
-Scissors Lift -Counter Wight Failure approved for use by a qualified scaffold
in charge and the work supervisor.
Inspection must take place on: (1) initial
erection, (2) each week thereafter, and
(3) after alteration or relocation.
The tag shall be signed and dated and
must only be removed by the scaffold in
charge.
Following PPE shall be worn; Body
harness, gloves, foot, and head
protections.
Using life line while erection the bus bar
Safe access to the life line like ladders
and scaffolds
Calibration for the suspended scaffold
and wires and scissor lift
Counter weight to be suitable for the
scaffold weight
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 23 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
7.4 Assembly of Hazards while Improper and Serious injuries 3 3 9 (M) All the hand tools and power tools shall 3*2=6(L) Tolerable Risk
cable tray handling inadequate use of and first aid be in good working condition.
and cable tools and tools cases Trained and experienced personnel
ladder sharp shall be assigned for the job.
using
hand &
edges of
metal
All portable power tools to be used on
site will be of finest quality, free from
power sheets any defects and properly grounded. A
tools competent electrician will perform an
inspection of all power tools to ensure
their proper maintenance. Rotating
tools such as grinders will have to be
switched off and held until rotation has
completely stopped before they are
placed down.
Adequate personnel protective
equipments must be worm while
carrying out the job.
Using the lifting -falling of -Bad /uncalibrated Fatality/Serious/ 15 M -calibration certificate for wires and hooks 8L Follow
motor materials wires/ hooks/lifting simple injuries 5 3 and lifting materials control
( mono rail) -falling of tools -Damage to
-Erection must be made by competent man
person while -Unsafe action from the materials measure
and daily supervision must be done before
handle the workers who
ant lifting operation s
load responsible for the
-PTW for the workers before ant lifting
-Collapse for lifting operation.
operation
the structure -Improper handling of
-Ensure control on the lifting load to avoid
-Cutting of the the materials.
anf load failure
lifting wires -Failure of structure
-The worker who work on tit must wear
-Overloading due to unsafe erection
harness attach to fixed point to avoid any
the lifting -wires failure
falling from height
motor -Unsafe monitoring of
-Counter weight / fixation must be stable and
-Contact with the motor
checked before any lifting operation
the motor -Overloading the motor
-Ensure inspection of the motor and wires
whilst motion whilst lifting.
/hooks before any lifting operation
-Counter -Bad maintenance
weight/
fixation point
failure
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 24 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
7.5 Storage and Chemical Improper handling of oil Skin irritation 3 3 9 (M) Strictly follow chemical handling procedures 3*2=6(L) Control
handling hazards Handling of oil without Splashing in to as per MSDS. With safety sessions for measures
of PPE. the eyes each used chemical. must be
transforme while Close supervision will be available. implemented
r oil pouring All connection to the pumps and equipments and followed
- shall be checked in prior to start the strictly
Storage and operation.
handling Proper PPEs like hand gloves, eye
of protection / full body protection/ foot
Chemicals protection shall be used at site.
Transformer oil will be stored in the shaded
areas separately, inside the drums.
Clear marking shall be given on each drum
for easy identification.
Ventilation for the storage area
Secure the storage area
Suitable F/F extinguishers to be ready
beside the storage area
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 25 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
Medical -No first aiders -Cannot deal with the Fatality 4 4 16 - At least two first aiders in the site
arrangements -No stretcher injured person by the Serious injury - Certifications must be updated
In the - No nearby competent persons. from red crescent of Egypt.
emergency medical center -Improper dealing with - Full time emergency car cable to
plan -No the injured person. carry the stretcher.
emergency -Increase the fractures - For every 25 workers we must
car full time by unprofessional have first aid box and first aider.
-No AED dealing with the injured - Stretcher to carry the injured
-No person. person.
emergency - Contact the nearest medical center
numbers in all and contact in case of emergency.
places of the - Medical session about the first aid
site. and medical arrangement in the
-No site to be doing on quarter basis
communicatio by the HSE rep.
n between site - Emergency numbers to be
team about cascaded in all site areas.
these medical - Update the emergency paln with
arrangements. the safety plan on monthly basis.
-No update for
the
emergency
persons.
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 26 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
7.6 Erection & -Elec.Shock Working carried out -Burns 5 3 15(H) 5*2=10(M) Control
Commissioning -Explosion after energized or -Fatality Main power supply (shut down) will be measures
under Tension indoor works beside cut off while doing any modification. must be
partly energized implemented
equipments Qualified electrician will carry out the and followed
activity. strictly,
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 27 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 28 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
QF-11-01
Issue / Revision: 01/00
Issue Date: 01/06/2018 Page 29 of 30
Identification & Evaluation of HSE Aspects & Hazards
Risk Assessment & Control Form
No. Activity Hazards Conditions for Consequenc Risk Risk Control Measures Residual Remarks
Hazards es Evaluati score Risk
Realization on (level)
S L H/M/L
Rotating Burns due to -Contact with the -Serious injury 4 3 12 (M) Gas bottles to be lashed securely in upright 6 (L)
equipment fire or physical rotating operation -Simple injury position outside module. Flashback arrestors to
injury to be used on all regulators. Oxygen cylinders to be
personnel stored separately from fuel gas cylinders. Empty
caused by cylinders to be returned to transport cages. Check
rocketing regulators before use.
cylinder.
HSE Manger
………………………………….