Equipment Data Sheet

CENTRIFUGAL PUMPS 1 OF 3

Client PT TRANSPORTASI GAS INDONESIA (TGI) Job No : 50002AW


Location JABUNG GAS BOOSTER STATION Doc No : 22-DS-R-005
Tag No. 22-P-4120 Sheet 1 of 3
Service Firewater Jockey Pump-Electrically Driven No. of Units 1

Revision A 0
Issue Preliminary Issue Approved for Design
Date 2/22/2006 2/24/2006
By NMC NMC
Checked DWA DWA
Approved AJG AJG
Client

LIQUID Water
VISCOSITY cSt @ 59oF 2.1 S G @ 59oF 1 SP. HEAT (kJ/kg deg C) N/A
PROCESS
DATA

REID VAPOUR PRESSURE psia MIN NORMAL Negligible MAX


PUMPING TEMP. °F MIN + 77 NORMAL + 85 MAX + 95
H2S CONCENTRATION ppm MIN N/A NORMAL N/A MAX N/A
CHLORIDES ppm N/A CORROSIVE / EROSIVE AGENT N/A
LIQUIDS Type NON TOXIC NON FLAMMABLE OTHER N/A

CAPACITY (NOTE 1) m3/hr MIN 1.8 RATED 6 MAX 6.9


MINIMUM CONTINUOUS FLOW THERMAL m3/hr PUMP TYPE HORIZONTAL, END SUCTION,
STABLE 6 m3/hr CENTRIFUGAL
DESIGN

SUCTION HEAD m RATED -5.26 MAXIMUM


DISCHARGE PRESS. barg 6 DISCHARGE HEAD m 66
DIFFERENTIAL HEAD m 71 NPSH AVAILBLE (m) NPSH REQUIRED (m) 5
MAX HEAD-RATED IMPELLER m STA SUCTION SPECIFIC SPEED (Max @ BEP- SI Units) STA
MAX POWER-RATED IMPLLER. kW STA MAX SOUND PRESS. LEVEL @ 1 Metre 85 dBA
HYDRAULIC POWER kW 1.5 SPEED rev/min STA ROTATION : NOTE 2
PUMPS TO OPERATE AS ELEC. MOTOR - REQ'D FLUID COUPLING - N/A GEAR BOX N/A
DUTY ONLY ELEC MOTOR BY Pump Supplier Note 5 FLUID COUPLING BY N/A
MOTOR MOUNTED BY Pump Supplier Note 5 FLUID COUPLING MOUNTED BY N/A
FLUID COUPLING N/A
IMPELLER CASING CASING SPLIT
TYPE CLOSED, RADIAL FLOW SINGLE VOLUTE ü AXIAL
DIAMETER mm STA DOUBLE VOLUTE RADIAL ü
BETWEEN BEARINGS VERTICAL DOUBLE CASING
OVERHUNG ü MOUNTNG CENTRELINE VERTICAL FOOT MOUNTING
NEAR CENTRELINE IN LINE SUMP PLATE
MECHANICAL SEALS BEARINGS SLEEVE ROLLER BALL
CONSTRUCTION

API SEAL CODE N/A RADIAL BEARINGS STA


TYPE Gland Packing THRUST BEARINGS STA
SUPPLIER STA LUBRICATION STA
COUPLING MAKE Thomas of Flexibox YES NO
MODEL Spacer Type
RATING

CONNECTIONS (NOTE 3) SIZE ANSI FLANGE POSITION OTHER CONNECTIONS


RATING FACE NO. SIZE TYPE
SUCTION STA 150 RAISED END VENT STA Valved and

DISCHARGE STA 150 RAISED TOP DRAIN STA Flanged to

Edge of B'plate

INSTRUMENTATION (NOTE 4) PRESSURE GAUGE TYPE TEMPERATURE GAUGE TYPE


TEMP & PRESSURE LOCATION THERMOWELLS TYPE
PRESSURE SWITCH TYPE LOCATION(S)
LOCATION ACCELEROMETER
VIBRATION MOUNTING PROVISION ONLY MOUNTING ONLY NON CONTACT

680212537.xls
Equipment Data Sheet
CENTRIFUGAL PUMPS 2 OF 3

Client PT TRANSPORTASI GAS INDONESIA (TGI) Job No : 50002AW


Location JABUNG GAS BOOSTER STATION Doc No : 22-DS-R-005
Tag No. 22-P-4120 Sheet 2 of 3
Service Firewater Jockey Pump-Electrically Driven No. of Units 1

MATERIASL CLASSIFICATION As Below or STA BEARING HOUSING STA


BARREL/CASING CI/BRONZE WEAR RINGS CI/BRONZE
MATERIALS

SHAFT SS AISI 4140 SHAFT SLEEVE 12% Chrome


IMPELLER CI/BRONZE BASE PLATE Fabricated Steel
DIFFUSERS GASKETS Non Asbestos

TYPE NOTE 5
Supplier STA TYPE STA FRAME STA
VOLTS NOTE 5 PHASE HERTZ ENCLOSURE NOTE 5
kW RATING STA VERTICAL HORIZONTAL
SPEED rev / min STA EFFICIENCY %
MINIMUM STARTING VOLTAGE INSULATION NOTE 5
DRIVER

FULL LOAD AMPS LOCKED ROTOR AMPS


STARTING METHOD TEMP. RISE deg F
BEARINGS STA LUBRICATION STA
VERTICAL SHAFT SOLID HOLLOW
VERTICAL THRUST UPWARD DOWNWARD
REMARKS

VERTICAL PUMPS UP DOWN SEPARATE MOUNTING PLATE


PUMP THRUST N DRIVER ALIGNMENT SCREWS
AT MIN FLOW N PIT OR SUMP DEPTH m
AT DESIGN FLOW N PUMP LENGTH m
VERTICAL PUMPS

AT RUNOUT N MIN SUBMERGENCE REQD. m


MAX THRUST N COLUMN PIPE FLANGED THREADED
FLOW RATE m3/hr LINE SHAFT OPEN ENCLOSED
GUIDE BUSHINGS BOWL LINE SHAFT
GUIDE BUSHINGS LUBRICATION WATER OIL GREASE PUMPAGE

REMARKS

SURFACE PREPARATION AND PAINTING NOTE 6


SURFACE PREPARATION

PUMP MOTOR BASE PLATE OTHER


SUPPLIER'S STANDARD
& PAINTING

SURFACE PREPARATION
PRIMER COATS
FINISH COATS
REMARKS

WEIGHTS
TOTAL WEIGHT kg STA WEIGHT OF PUMP kg STA
WEIGHT

WEIGHT OF MOTOR kg STA


REMARKS WEIGHT OF BASEPLATE kg STA

CODES AND STANDARDS


CODES AND STANDARDS

CASING IMPELLER SHAFT OTHER


MATL. CERTIFICATION REQ'D: ü ü ü
NOZZLE WELD INSPECTION. MAG.PARTICLE LIQ. PENETR. RADIOGRAPH. ULTRASON.
CASTING INSPECTION MAG.PARTICLE LIQ. PENETR. RADIOGRAPH. ULTRASON.
CHARPY TESTS REQUIRED ITEMS
APPLICABLE CODES
REMARKS

680212537.xls
Equipment Data Sheet
CENTRIFUGAL PUMPS 3 OF 3

Client PT TRANSPORTASI GAS INDONESIA (TGI) Job No : 50002AW


Location JABUNG GAS BOOSTER STATION Doc No : 22-DS-R-005
Tag No. 22-P-4120 Sheet 3 of 3
Service Firewater Jockey Pump-Electrically Driven No. of Units 1

QA & TEST
REVIEW VENDOR QA PROGRM. ü COMMENTS
QA

PERFORMANCE CURVE APPR. ü COMMENTS

SHOP INSPECTION
TEST NON WITNESS WITNESS NOTE 7 OBSERVE

HYDROTEST ü
PERFORMANCE ü
NPSH ü
STRING TEST (CONTRACT MTR) ü
SOUND LEVEL TEST
DISMANTLE & INSPECT AFTER
TEST

TEST
CLEANLINESS PRIOR TO FINAL ü
TEST
PIPELOAD TEST
OTHER

VENDOR TO SUBMIT TEST ü COMMENTS


PROCEDURES

ENVIRONMENTAL & SITE DATA


ENVIRONMENTAL & SITE DATA

LOCATION INDOOR OUTDOOR UNDER ROOF PARTIAL SIDES


GRADE MEZZANINE HEATED UNHEATED
WINTERISATION REQUIRED NO TROPICALISATION REQUIRED YES
ELECTRICAL AREA ZONE NOTE 5 GAS GROUP NOTE 5 TEMPERATURE CLASS NOTE 5
CLASSIFICATION

SITE DATA ELEVATION : 13 m ATMOSPHERE - Desert


AMBIENT TEMPERATURE deg C MINIMUM + 77 NORMAL + 85 MAX + 95
RELATIVE HUMIDITY % MINIMUM NORMAL MAXIMUM 100

Note 1 The pump shown on this Data Sheet will be used as a jockey pump to maintain the pressure in a wet fire hydrant system.
The pump flow will reduce to zero as the hydrant pressure builds up to its set pressure.
Note 2 Pump duty to be confirmed during detail design.
Note 3 The suction flange shall be on the end and the discharge flange shall be on the top
NOTES

Note 4 In accordance with NFPA 20.


Note 5 Pumpsets to be in accordance with Project Specification 22-SP-R-002
Note 6 Pumpsets to be prepared and painted in accordance with Project Specification 22-SP-C-001
Note 7 Tests on pump to be witnessed by the Owner.
Note 8 STA = Supplier to Advise

REMARKS