Professional Documents
Culture Documents
M. Abdi Gunawan
Senior Mine Engineer
BTP Block B No. 266 Makassar, Indonesia 90245• (+62)81355164644 • February 21th,
1988 • m.abdigunawan@gmail.com • PERHAPI 2222115
https://www.linkedin.com/in/muhammad-abdi-gunawan-366b3544/
SUMMARY
Passionate Mining Engineer with 11+ years of experiences in Nickel Mining, seeking to implement my
expertise for mining company profit growth.
At PT Sinar Kurnia Alam (Weda Bay-Eramet Group and Gebe Island), succeed to deliver 500,000 ton nickel
ore with Ni COG above 1.2% . Production plan 1500 ton/day according to block model estimation and
generated 1,200,000 ton mineable nickel ore reserve including grade quality control process (COG Ni above
1.8%) for 6 months production use 1 excavator for trenching and test pit, and then reserve estimation with
surpac software. At PT Wanatiara Persada (Obi Island, Jinchuan Group), formulated cost structure for 2017-
2018 operational activities, designed 10 mineable pit shell with total reserve estimation ± 9.6 Million WMT,
supervising 2 mining contractor operation use 16 excavators, 12 ADT, and 22 DT. Best fit area supervised is
60 ha, and succeed in managing ore stockpiling with 2,400,000 nickel ore annual production (export
shipment) COG Ni above 1.6% and 1,000,000 nickel ore annual production (domestic LFO) COG Ni 0.9% Fe
above 48%.
At PT Sulawesi Cahaya Mineral ( Konawe, JnP Group), developing ore stockpile management of Greenfield
mining area and produced 4,000 ton nickel ore for heap leach on-site trial test for further mining operation.
Held Bachelor of Science (B.Sc.) Mining Engineering complimented with multi-lingual abilities (Mandarin-
English-Indonesia), specialize in Geology and mine design plus Surpac6.6 software proficiency, also Nickel
ore Grade Control (Quality Control and Quality Assurance) from mine-to-port operational in ensuring Nickel
and Ferro grade are matched with client request on marketing contract.
At PT Bahana Selaras Alam (Aserra Capital Group), make a long-term nickel laterite mining plan according
to the client's request using Surpac software, make Pit Optimation using Whittle Software and Mine
Scheduling using Minesched Software. Planning and Monitoring the achievement of the 2022 production
target with the achievement until October 2022 of 71% (1.3 million wmt of 1.8 million wmt ore). Calculate
estimated mining costs and make KCMI/SNI reports.
Key Skills: Mine Planning | Mine Pit Optimization |Teamwork Development | QAQC |Continuous
Improvement Culture |Excellent Written and Verbal Communication |Cost Operational Structure Analysis
and Generator
WORK EXPERIENCE
EDUCATION