Method Statement/Risk assessment.

CONTRACTOR RAMBROS CONSTRUCTION CC


SITE & LOCATION PROJECT: CONSTRUCTION OF NEW CLIFFDALE SECONDARY SCHOOL, 400352 STREET,
CLIFFDALE, OUTER WEST DURBAN, KZN
EQUIPMENT HANDTOOLS,POWERTOOLS,WELDING MACHINES
JOB SUMMARY DRAINAGE ACCESSORIES INSTALLATION
SUPERVISOR:
JOB SPECIFICATIONS (in point form)
DETAILED DESCRIPTION OF WORK STEPS (How the work is going to be carried out)

Drainage Accessories Installation Method of Statement


Equipment and tools:
Chisels, Picks & Wrecking Bars.
Hammers & Screwdrivers.
Leadwork Tools.
Lubricants & Cleaning.
Shovels & Spades.
Sweeping & Cleaning Brushes.
Trowels.
Ladders

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories.

This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in
compliance with the approved designs and approved material
1 submittals.

Prior to installation of drainage accessories, the supervisor  and foreman will verify and ensure that all the health
and safety requirements have been complied with.
METHODSTATEMENT ATTENDANCE REGISTER

DATE: ______________

TOPIC: ____________________________________

SUPERVISOR: ______________

NO. COMPANY NO. NAME. SIGNATURE.