Professional Documents
Culture Documents
Ar
cKay
http://miragaswar.com/
;
Introduction
post. Aft, and here the draughts are somewhat ambiguous~ it would seem that at Tahiti).
No contemporary drawings or paintings of Bounty exist and I have not found The two 13cwt anchors were wooden stocked bower anchors; one was
any verbal description of her stem decoration, so here I have exercised some recovered from Bounty Bay and is now at Pitcairn Island. Its principal
licence; the drawings show the stern cove carved in a motif that reflects the dimensions are shown in Table 3.
ship's name, Baunly.
TABLE 3: ANCHOR DIMENSIONS
STEERING GEAR
ft in
There was nothing out of the ordinary about Bounty's steering gear and apart Length of shank 11 7 (ring to crown)
from coppering the rudder and installing bronze fastenings it was not changed Circumference of shank 1 7
from that of Belhia. The rudder itself was made up of two Large timbers and Between bills 8 O
Breadth of palms 1 7
was hung on the stern post by means of four large hinges formed by gudgeons Diameter of ring 1 10
on the stern post and pintles on the rudder. A hole was eut in the transom
planking, through whieh the rudder passed, and the two transom timbers on From the table of anchor dimensions it wi-!J be seen that these figures coincide
either side of it were spaced to allow the rudder to swing. This hole, known as with what was eommon practice of the day. When leaving Tahiti for the last
the he1m port, was fitted with a tarred canvas shroud to prevent the sea from time Fletcher Christian eut Bounty's anchor cable and 'ran'. This anchar was
washing up into the great cabin. At the level of the upper deck the heads of the subsequently dragged for and recovered by Pandora, the frigate sent to capture
stern post and rudder were reinforced with iran bands and both were covered Bounty's mutineers, and as Pandora was wrecked on the Great Barrier Reef
with a wooden housing through which the tiller passed. The tiller was while returning to England, it is believed that this anchor, the second bower,
tennoned into the rudder head and the hole in the housing for it was made wide lies with her remains. Bounty carried six anchor cables, each 100 fathoms longo
enough athwartships to allow for its sweep, and here again a canvas shroud was Bligh makes two interesting notes in Bounty's log concerning the best bower
employed to keep water out. anchor. First, on 4 April1789 he notes, 'In stowing the best bower anchor the
The steering wheel was single and sat aft of the mizzen mast; its component stock broke in the nut and fell overboard, being destroyed by the worms. My
parts were carved and turned from hardwood and it had brass reinforcing sheet anchor had an iran stock for the convenience of earrying it in the chains,
fittings as required. The tiller was controlled by a single rope wrapped seven or and I used it therefore as a small bower; I saved the anehor stock. Ships that
nine times around the drum of the wheel, passed through lO-inch blocks come here shauld have iron stocks.' Then, three days later he notes, 'New
directly below, then led to blocks on either side of the deck, brought aft and stocked the best b[owe]r anchor'.
finally secured to the tiller. The sweep of the tiller and arrangement of control The three iron-stocked anehors were the stream (5ewt lqrt Olb) and two
ropes on the quarter-deck made working on the aft area of the ship awkward at kedges (2cwt lqrt 20lb, and lewt 3qrt 100b). The shee! anchor that Bligh refers
best, and indeed Captain Cook had a platform buiIt over Endeavour's tiller, to in the log was the stream, and as it was the next in size after the bowers it was
which was arranged similarly to Bounty's, so that his important passengers adopted as the sheet. (Larger ships usualLy carried a total of four wood -stocked
could walk comfortably around on the poop. anchors.) This stream anchor was carried on the ehanneI and the two kedges
Immediately ahead of the wheel sat the binnac1e, the item of furniture which were carried in the hold.
housed the ship's compasses. It was built ofhardwood and besides containing It was customary to carry windlasses on smaller ships, particularly merchant
the compasses, one on either side, it he1d an oillamp and therefore had a brass vessels, as they eould be worked by a relatively small crew. On the other band,
chimney on its top. Glass panels were fitted in the binnac1e to allow the the Navy, with a Iarge pool of manpower to draw [rom, fitted capstans (often in
compasses to be seen, but as the binnac1e was lashed to the deck very close to pairs, one above the other) in their ships. The advantage of a windlass operated
the wheel, it would have been difficult for the helmsman to see in; with the by a few men was offset by two negative factors: windlasses were slow in
mizzen mast and bitts so close in front it would have been awkward even for the operation and took up a good deal of deck space. Apart from rearranging the
officer of the watch, whose dut y it was to monitor the cqmpasses, to see in. All belfry, no changes were made to Bethia's windlass after she was bought by the
metal fittings of the binnac1e and surrounding area were of brass rather than Navy. Note that the draughts clearly show three pawls.
ferrous metal so that the compasses would not be adversely affected. Like the windlass, the capstan was originally fitted to Belhia and did not
underga any alteration~ but its arrangement is interesting; at this time it was
GROUND TACKLE usuaI to mount tbe capstan with its spindle stepped on the deck below, but as in
As mentioned above, Bethia's anchors came with her when she was bought by Bounty there was a companionway immediately under it, this would have been
the Navy, and it is indicative oftheir importance that Deptford Yard specifi- impossible. The spindle was critical in that it provided lateral bracing to the
cally listed their size and price separate1y when reporting to the Navy Board: capstan, and if BounOls capstan merely rata ted on a short iran spindle on the
upper deck its power would have been greatly reduced. Although proof is
Anchors propos'd to be purchas'd with her: irnpossible, this arrangement nevertheless seems to be the only one possible
Cwt qr lb here, and it must be assumed that the capstan was used for very light work
Anchor of 13 3 O only, Furthermore, Bethia's draught shows a deck locker just aft of the capstan
13 3 8 (this may have been removabIe and indeed was removed for Bounty) as well as a
I Iron stocked 5 1 O 12-inch companionway coaming ahead of ito The operung of the companion-
2 1 20 way couId be c10sed by placing a grating over it, but the locker, which was 3
1310 feet high, mins an imponant working principle of the capstan: that men
should be able to walk around it in an unbroken circle.
TABLE 2: ANCHOR DIMENSIONS Based on Falconer's Dictionary of 1830
Item Welght Length of Length of Breadth of Thlckness of Slze of SizEI of Outer diam Thickness of
(cwt) the shank the flukes the palma the palms the trend the small of the ring the ring
round
Bowers 14 11ft Sin 3ft 11in 1ft SV4in 1 \l4in 4 718in 4Vsin 1ft 8V4in 2 3/1oin
Stream 6 8ft 6in 2ft 10in 1ft 3in 1in 3 1/4.in 3V4in 1ft 3in 1%in
Kedge 2 6ft 6in 2ft 2in 11 in 0/4in 23f4in 2V4in 11 in 11Jsin
Note: The tigures given here do not precisely match the weights of Bounty's anchors; they are the next ciosest size listed by Falconer.
PUMPS great area of deek space and Bligh states the bow eame 'well with the fore
The pumps carried aboard Bounty were of the elm tree type; that is, they were hatchway, rather projecting over it'.
made irom the trunk of an elm forming a tube that extended from 3 feet above The problem of boat stowage does not end with the excessive length of the
the upper deck to the lowest point of the ship, just aft of the mainmast. They launch; it is complicated further when we consider height. If Bounty's two
were of a simple design; a handle (or brake) operated a metal rod in the tube of largest boats were stowed aIongside one another there would have been a mere
the pump and at the lower end of this rod was a one-way valve made from a l feet 9 inches between either boat and the rail, and as this area of the ship was
perforated disc. As the rod pushed the disc downwards the holes permitted important for sail-handling it is likely that the cutter sat in the launch, which
water to pass through, but on the upward stroke a leather flap fell over the was placed on Bounty's eentre1ine. The problem then arises of where to stow
holes to prevent the passage ofwater, thus causing it to be carried upwards. As the JoUy Boat. Three options are available here: the launch may have been
the stroke of the rod was less than 3 feet, another such valve was placed at the stowed off-centre with the ZO-foot eutter within and the Jolly Boat snugged
base of the pump, and the pump had to be primed to work. Seepage water was , beside it; the three boats may have all been stowed on the centreline of the sbip
collected in a cistern at the base of the pump by means of holes bored through with the Jolly Boat on top (this would have been an awkward balancing act and
each frame, and any water that spilled through deck openings into the hold was would interfere with the mainsai1); or, when trading BounO"s small boats for
collected by means of channels, limber passages) running the whole length of larger ones the 16-foot cutter may have been dropped. Whatever the real
the ship on either side of the keelson. At the upper deck the brakes were made answer is, I have shown Bounty with two boats only.
removable so as Dot to interfere with the working of the ship when the pumps Bounty's 23-foot launch is as well known as the ship herself due 10 Bligh's
were not in use. On large ships tbis type of pump was not used for pumping 3600-mile voyage in her. She was carvel built, six-oared, and was designed to
bilge water hut rather for pumping sea water (used primarily for washing the carry thirteen people (when Bligh was set adrift there was a total of nineteen in
ship or, if needed, fire fighting) while chain pumps were employed to control the launch). It is believed that the launch was built by a Mr John Burr, a
seepage. contractor for Navy boats, at a cost ofabout f43. As the launeh was intended
Bethia's outboard profile does not show pumps (although her upper and for anchor-handling and other heavy duties she was fitted with a removable
lower deck plans do, hut not a hold well) but it is difficult to imagine a ship of windlass amidships and two davits with a sheave were placed in her stern. A
her size without pumps. In any event, Bounty carried two elm tree pumps, aft standard draught for 23-foot launches ofthis time exists and shows this outline
of the mainmast and roughly 2 feet either side of the centreline. specification:
On Bounty's outward voyage Bligh developed a novel application for the
pumps, details of which are given in the log. 'February 7, 1788, Drew the Length 23ft Oin
boxes of one pump & employed hands to pour water down, and kept the other Breadth 6ft 9in
pump constandy going for ane hour, until the water came out no more Depth 2ft 9in
offensive than when it was put in'. He found another use for the pumps on II Stern sided Oft 3 1hin
February 1788: 'In heavy rains when the ship became heated below I found Keel Do. Midships Oft 37Jsin
this to have the most valuable effect and I believe the pumps to be the best Post sided at the Tuek Oft 3Vzin
ventilators that ean be put fito a sh.jp'. Alow [below] Oft 3in
Transom thiek Oft 2in
BOATS Floor timbers Sided Oft 2in
As originally ordered by the Navy Board on 20 June 1787, while Bounty was Moulded at the Heads Oft 21fsin
fitting out, her boats were to be a 20-foot launch, and 18-foot cutter and a Throat Oft 37/sin
16-foot cutter or jolly boat. These boats were apparently delivered to Deptford Futtocks Sided Alow [below] Oft 2in
Yard but at Bligh's request the first two were exchanged for a 23-foot launch Square at the Heads Oft l7/sin
and a 20-foot cutter. Bligh, having had experience in the South Seas, reaIized
the value of large boats for provisioning and watering. The Navy Board's We also know that the launch was a good sea boat; Bligh notes in the log) while
decision that the longest boat was to be of 20 feet was probably arrived at by adrift, '4 May, 1789 We could do nothing more than keep befor the sea, in the
considering stowage; from Bounty's fore brace bitts to her fore companionway course of which the boat performed so wonderfully well ... '
is a little over 18 feet so a 20-foot boat would have fitted quite comfortably on The rigging of boats varied quite dramatically and was determmed by the
the main hatch. Even after removing her rudder the 23-foot launch took up a intended use of the boat as well as the personal preference of those who sailed
. ,
them. The draught of Bounty's launch clearly shows provision for stepping ane similar cabin was installed for the Master, opposite. Between these cabins was
mast, well forward, and in this instance she would most likely have been rigged a companionway lobby, and the Captain's dining room with it8 pantry was
as a eutter. However, Bligh makes a number of references to her rig in the log placed forward of these. The dining room also served as a day room for Bligh
that have convinced me that she earried two masts: and as an office for the Clerk. As mentioned above, berths formed by canvas
sereens were placed on either side of the upper deck ahead of the dining room
3 May 1789 I bore away under a reefed lug fore sail bulkhead for the Master's Mates and Midshipmen. The remainder ofthe lowe,r
10 May [1789] I now got fitted a pair of shrouds to each mast deck, a space roughly 22 fe et by 36 feet, was allotted to thirty-three seamen ,
10 May 1789 In the afternoon I fitted a pair of shrouds for each mast, with some of the space also taken up by hatches, companionways and the stove.
and eontrived a canvas weather cloth round the boat, and raised the Bligh refers to the eramped quarters aboard Bounty in his aceount, dated 10
quarters about 9 inches, by nailing on the seats of the stern sheets, April 1788, '. , , The decks also became so leaky, that I was obliged to a110t the
which proved of great benefit to us. great cabin, of whieh I made little use, except in fine weather, to those people
who had wet berths, to hang their hammoeks in; and by this means the
The drawings show the boat rigged as a lugger, with masts and yards, rigging between decks was less crowded'.
and saiIs all based on Steel. As so mueh variation oeeurred with boat rigging, On the aft platform of Bounty's hold, the eockpit, seven smalI rooms (their
the figures given in the Rigging Sehedule under 'Rigging for eutter and launeh' headroom being barely 5 J/z feet between the beams) were built as eabins for the
ean only serve as a general guideline. Botanist, Captain's Clerk, Surgeon, Steward and Gunner and as the Captain's
After carrying Bligh and his followers to Coupang (Kupang) Bounty's launch store room and slop room. Aft ofthis platform, in the after peak, was the bread
was towed to Batavia (Jakarta) and eventually saId at auetion. By this time room, and beJow it were the spirit room, fish room and aft magazine. Cabins
Bligh had grown sentimentally attaehed to her and in his account he wrote, for the Boatswain and Carpenter were located on the fore platform as weB as
'The launeh was likewise saId. The serviees she had rendered us, made me feel their respeetive store rooms and the Gunner's store room, sail room, pitch
a great reluctance at parting with her, which I would not have done, if I eould room and block room. Below the platform was a second Boatswain's store
have found a eonvenient opportunity of conveying her to Europe.' room and sail room and the forward magazine.
The 20-foot eutter was clinker built, shipped six oars and was designed to The Navy Board ordered a new firehearth for Bounty in July 1787 and it had
carry a maximum of ten men. The drawings show her rigged as a cutter, with a been installed before undocking on 14 August. This partieular firehearth,
single mast set well forward, a large fore-and-aft main sail spread on a gaff and called a Brodie stove after its manufacturer, had been adopted by the Navy in
boom and two fore sails. Here again, rigging and sails are based on Steel's May 1781 as the onIy type of firehearth to be employed on His Majesty's ships.
proportions. If Bounty earried a 16-foot Jolly Boat, it would have been clinker (Brodie he1d this monopoly until 1819.) The stove was<built of wrought and
built andwould have carried four oarso east iran, was fired by eoal or wood, and its eooking faeilities inc1uded a bake
oven, boilers and a roa sting hearth. A spit was mounted at the frant of the
CREW AND ACCOMMODATION roasting hearth on adjustable brackets and it was driven by a chain that was
Based on a formula of 15,5 tons per man, Belhia, as a merehantman, would driven in turn by a fan in the ehimney. A fresh water condenser was placed on
have required a erew of some fifteen men to sail her. For the purpose of the top of the stove, aft, and the stove's metal chimney eould be rotated as required
Navy's South Sea mission Bounly's total proposed complement was forty-five: by the direction of the wind. While trying to round Cape Horn Bligh notes,
'With so mueh bad weather, I found it necessary to keep a constant fire, night
TABLE 4: SCHEME OF COMPLEMENT and day; and ane of the watch always attended to dry the people's wet clothes:
and this, I have no doubt, eontributed to their health as to their eomfort'.
1 Lieutenant to command Boatswain's mate One other stove~ or space heater, was plaeed aboard Bounly. On 10 October
1 Master Gunner's mate 1787 the Admiralty wrote to the Navy Board,
1 Boatswain Carpenter's mate
1 Gunner Carpenter'S crew
1 Carpenter Sailmaker . . . We do hereby desire and direct you to order a proper stove to be
1 Surgeon Corporal plaeed in the apartment on board the Bounty armed storeship, which is
2 Master's mates 1 Clerk and steward
2 Midshipmen 25 Able seamen intended 10 contain the principal part of the Trees and Plants, to prevent
2 Quartermasters their reeeiving injury from the eold during their passage round the Cape
1 Quartermaster's mate 45 TOTAL
of Good Hope . . .'
This complement was altered slightly as an Armourer and an Assistant MASTS AND YARDS
Gardener were assigned to Bounty, so two se amen were dropped to make room Details concerning the dimensions of Bounty's masts and yards are weIl
for them. When Bounty sailed she carried forty-su: men, as a Botanist had be en documented as some of her spars were altered twice during refit and proposed
assigned; understandably, overcrowding occurred on her lower deck when her changes 10 them were recorded. In Table 5 ~ the first set of figures is for Bethia
crew was increased threefold. This problem was exacerbated by her load of as she was bought, as Deptford Yard sen t them to the Navy Board on 6 June.
provisions for eighteen months and by the physieal alterations to the ship With these figures came a request for instructions, and on 8 June the Board
which reduced crew a~ommodation area. ordered that Bounty's masts and yards were to comply with the second set of
As the great cabin was given over to the stowage of plan t pots, a small figures listed, In comparing the two sets of figures we find tbat the main
sleeping cabin was built for Bligh just ahead of it on the starboard side and a topgallant and polehead were reduced, as were the fore topgallant and
_--_----.i2. _
TABLE 5: DIMENSIONS OF MASTS AND YARDS
As bought As ordered As requested
with Bethia by the Admiralty by Bligh
Item length diam length diam length diam
Mainmast 58ft 1Oin 16in 58ft 10in 16in 55ft Oin 16in
Main toprnast 35ft 10in 1Q3/4in 35ft 10in 35ft 10%in 35ft Win 10%in
Main topmast head 4ft 9in 4ft 9in 4ft 9in
Main topgallant mast 23ft 10in 6in 18ft 2in Sin 18ft 2in 6in
Main polehead 10ft gin 9ft 1in 9ft 1in
Maio yard 40ft 5in ii lj4;n 46ft Sin 11V4"ln 41ft Oin 9 1hin
Main topyard 35ft 2in BI/gin 35ft 2in B'Igin 31ft Oin 6 1/2in
Main topgallant yard 24ft 8'/gin Sin 24ft Bin Sin
Foremast 53ft 4in 161!2in 53ft 4in 16 1/2in 51ft Oin 16V2in
Fore topmast 34ft Sin 103j4in 34ft 3in 10Y4in 34ft 3in 103J4in
Fore topmast head 4ft Oln 4ft. Oin 4ft OIn
Fore topgallant mast 23ft 5 1/2in 6in 17ft 3in 4%in 17ft 3in 4%~n
Fore polehead 12ft 2in 8ft 7in 8ft 7in
Fore yard 40ft Sin 11 in 40ft Sin 10in 38ft Oin 87j~in
Fore topyard 30ft 6in 7%in 30ft 6in 7in 28ft Oin S%in
Fore topgailant yard 24ft Sir. 5ir. 24ft Sin 5in
Mizzen mas1 48ft 2in 11 JAin 48ft 2in 11 1/4in 48ft 2in 111/4in
Mizzen topmast 24ft 3lJ2in 6 7/sin 24ft 3Y2in 6 7/Rin 24ft 3lJ2in 67fsin
Mizzen topmast head Sft 1in 3ft 1in 3ft 1in
Mizzen yard (gaft) 21 ft 2in 6l/xin 21 ft 2in 6 1/sin 21 ft 2in 6lfgln
Crossjack yard 36ft 2in 7 112in 30ft Bin 6 1hin 30ft 6in 6 1hin
Mizzen topmast yard 24ft Oin 5Y4in 24ft Oin 5in 24ft Oin Sin
Bowsprit 35ft 4in 181J4in 35ft 4in 18 lAin 35ft 4in 18lJ4in
Bowsprit housing 10ft 2in 10ft 2in 10ft 2in
Jib boom 27ft 1in 8%in 27ft 1in 8%in 27ft 1in 8%in
Spritsail yard 30ft 6in 63/~in 30ft 6in 6ir.
poh::head; the fore and mizzen topyards were reduced in diarneter only, and the that the Mizzen Mast should be raised out of the step and two feet eut off ir, as it
crossjack yard was reduced in length and diameter. Furthermore, main and Is too taut and strains the ship about the quarter and it was done and the rigging
fore topgallant yards were needed (and provided) as was a spritsail yard, and repaired and fitted'. Similarly, shortening a yard would not be just a matter of
beeause the main yard was to be inereased by some 6 feet, a new one would cutting ::llength off each end; the whole yard would have to be retapered to suit.
have had to be provided. This general reduetion in top weight was in keeping This was of particular importance when lower and topyards were involved, as
with Admiralty poliey for ships headed to the South Seas. quarter irons and boom irans had to be refitted.
In the draughts, fu.rther changes were made to Bounty's masts and bowsprit; As weJl as asking that the Bounty's spars be redueed, Bligh aIsa asked for
Bethia's draught shows the heels of her masts tennoned directly into the 'Gratten Tops' (grating tops) as opposed to the plank tops that were used by the
keelson, whereas on Bounty's draught mast steps are c1early shown. The Navy as fighting platforms. It was customary for merehant vessels to earry
bowsprit was altered in Bounty by raising its heel s~me 8 inches, thus reducing grating tops, (that is~ tops whose platforms were formed by grating) as they
its steeve. were not required for martial activities and they were lighter and less subject to
The second aJteration to Bounty's rig was the result of Bligh's request and rot than plank. It may have been thatBethia's tops had been changed to plank,
was prompted by his knowledge of the South Seas. He notes in his aecount, or perhaps the Navy Board was contemplating doing so.
'The ship was masted according to the proportion of the navy; but on my The drawings show Bounty's masts and yards with lengths and given
applieation, the masts were shortened, as I thought them too much for her, diameters taken from the last set of dimensions. All other dimensions and
considering the nature of the voyage'. Dimensions of Bounty's masts and yards diameters are based on Steel's formulae for mastmaking and as such eannot be
as she left Spithead, those reflecting Bligh's wish, are given in the third set of too far from wrong, since Steel's book came anly seven years after Bounty's
figures; by comparison of these with those of the Admiralty we find that the refit. Generally, Bounty's spars are slightly larger than as required by Stee1 for
main and fore masts, yards and top sail yard were all reduced. The note in the their length and it is interesting that Bethia's foremast was half an inch larger
log eoncerning this work reads, IOn the 4th September from an application I in diameter than her main. Finally, I have shown the lower mast bibbs in the
had made the lower masts were got out and shortened and the lower top sail style of the merchant navy, fixed to the sides of the hounds and not tennoned to
yards were eut on shore agreeable to my request'. their [ore faces, as in alllike1ihood Bethia's masts were built this way and there
Shortening a mast would have involved a good dea] of work, as all of the rig was no need for the Navy to change them.
above it (starting with the sails, then yards, running rigging, top and topgallant
masts and their standing rigging) would have to be brought down; the mast SAILS
would then be lifted, shortened, retennoned, replaced and rerigged, with Bounty was fully rigged as a ship; that is, she carried square sails on all three
adjustments to the standing rigging as required. This was not an uncommon masts. Although this point is quite obvious it is worth mentioning, as her size
practice and was even done away from docking facilities; indeed, Bligh, while makes her rig somewhat unusuai, in that vessels of less than 250 tons were
at False Bay, had Bounty's mizzen mast eut down; '26 May, 1788, I directed eustomarily rigged fGre-and-aft. Genei"ally, the fore-and-aft rig required less
manpower per ton to handI e and tbis was an important consideration for and second to salute another ship or when entering port.
merchantmen. Bounty's 4-pounder guns were the standard design Naval gun, and as such
Square sails carried on Bounty were: spritsail on the bowsprit; course, top sail they were mounted on wooden carriages. The 4-pounder give n in the drawings
and topgallant sail on the foremast; course, topsail and topgallant sail on the is based on the dimensions of ane of E ndeavour's guns which Captain Cook was
mainmast; and topsail on the mizzen mast. Fore-and-aft sails, alsoknown as forced to jettison when his ship struck the Great Barrier Reef. This gun is now
staysails, were: three between the bowsprit and foremast; three between the in Australia and would have been virtually identical to Bounty's; it is 6 feet
fore- and mainmasts; two between the main and mizzen masts and the very long,13Vl inches in diameter at its breech, its bare is 3V4 inches and it weighs
important mizzen course, or driver, on the mizzen. She also set three studding about 1000 pounds. A crew of four men was required to work this gun and it is
sails on either side of the fore- and mainmasts, to bring the total number of sails interesting to note that on Bounty there is a shroud deadeye directly in front of
to twenty-nine. A matching suit of spare sails was carried in the hold. the first gunport and a timberhead just inboard of the second. Furthermore,
Here again, the drawings show the sails in accordance with Steel, with sizes the recoil of the second gun was seriously impeded by the mizzen topsail sheet
determined from the sail and rigging drawings, and they are based on masts bitts. These obstructions would have been a problem in a real man-of-war.
and yards as earried on Bounty when she left Spithead. If Bethia was fitted with Swivel guns were the smallest mounted weapons to be employed by Navy
sails when she was purchased by the Navy, they would have been modified to ships; they were used for anti-personnel purposes and were manned by a crew
suit the new spar dimensions (or she would have been fitted with new ones); it of two. They were mounted by means of a wrought iron yoke that was c1amped
seems that further changes were still necessary, as Bligh notes that, 'The lower around the trunnions and had a spike fitted to il. The spike (the term spike is
studding sails being too deep I cut them and made royal s out of the canvas'. somewhat misleading as it was really a spindle) was placed in a hole bored in the
Royal sails would have been roughly 7 fe et by 21 feet for the fore polemast and top of the timber gun stanehion, and this simple arrangement not only allowed
8 fe et by 22 feet for the main. the gun to be trained and elevated, but also made the weapon very portable;
swivels were usually carried in the hold until needed. The swivel shown here is
RIGGING 2 feet 9 1/2 inches long, 6V2 inches in diameter at the breech its bore is 13/4
j
Any difference between Bethia's and Bounty's rigging would be minimal} if inches and it weighs slightly more than 100 pounds. A !ever, known as the
there was a difference at all, and as Bounty was rerigged to suit the new spar tiller, was ofren fIxed to the breech of swivel guns to provide more control
configuration, it is safe to assume that her rigging met with Navy standards. As when training. Many variations of the tiller occur, but basically, if it had not
the smallest ship listed by Steel is of 250 tons (ships from eighteen to fourteen been east together with the gun, it was a wrought iron handle that was clamped
guns, or from 300 to 250 tons), the rigging schedule shows rope sizes around the pommelion, and it was about 12 inches longo It is probable that
(circumference) as given for this ship, and as such some items, particularly the Bounty's swivels were equipped with tillers, but for want of positive informa-
largest~ may be slightly oversize. I have, however, made adjustments where tion the drawings do not show ane. '
Steefs list is obviously inaccurate. The lengths of rigging are determined
somewhat differently as a rope's length was calculated by a formula based on its SOURCES AND BmLIOGRAPHY
respective spar's length. These lengths may not be perfectly accurate as I The Admiralty Draughts, National Maritime Museum, Greenwich
believe they were mainly used as a guideline for the ropemakers; minor Batchelor, N 'HM Armed Vessel Bounty (1787), Model Shipwright No ll,
adjusunents would have be en made by the ship's riggers. This would not apply 1975
to a re-rig, in which a rope being replaced could be measured. Barrow, J The Munity o/the Bounty (edited by Gavin Kennedy), Russell Sharp,
Some rigging items are not given by Steel for a ship of Bounty's tonnage and 1980
where this is the case I have used other means to determine their sizes and Bligh, W The Log of the Bounty, Genesis Publications
lengths. Some of these items include wooldings, bowsprit gammoning, jib- The Log of the Bounty, Golden Cockerel Press
boom lashing and strap, Flemish horses and some studding sail rigging. The Mutiny on Board HMS Bounty, Signet Classic, 1962
Figures given for shrouds and swifters by Stee1 are based on seven pairs, and as Knight, C 'HM Armed Vesse1 Bounty' Mariner's Mirror Val 22, No 2, April
Bounty carried five pairs, an adjustment was made which has also affected the 1936
overalllength of ratlines. Royal backstays and flagstaff stays are not shown by Harland, J Seamanship in the Age of Sail, Conway Maritime Press, 1985
Steel as he does not allow for royal sails. I have shown these items, although Marden, L 'The Bounty: Mutiny in the South Seas', Men, Ships and the Sea,
they were unlikely to have been in place when Bounty left Spithead, as Bligh National Geographic Society, 1973
would have rigged them when setting new royals. Also, running rigging to the MeGowan, A The Ship: The Century Be/ore Steam, Her Majesty's Stationery
royals must be allowed for. Office, 1980
Finally, after allowing that Bounty was somewhat out ofthe ordinary for the Monfeld} W Historic Ship Models, Sterling Publications, 1986
N avy, the belaying plan has been arranged to follow conventions of the day as Steel, D Elements of Mastmaking, Sailmaking and Rigging, Edward W Sweet-
closely as possible. man, 1982
ORDNANCE
Although Bounty carried four 4-pounder gUllS (short) and ten half-pounder
swivels she could not, by any defmitioll} be termed a fighting ship. Bounty
mounted guns for two reaSOllS: first as a deterrent to pirates (who were often
found on the eastern seas) and any hostile natives who might be encountered;
14
The
Photographs
". . . . .• i'
....
.
$1
.::j:
.. :
... ...:
4. A port
quarter vie
w of the 1
979 replic
a.
6. Above
r ig h t l) 1 is
earHer BO
untyreplic p o rt q u a rt s r v,eW 0
num a, apa 1 th e
b 01 m o d e m p a s t"t fl'of('l the \arge
8,lJtheenrtic s e n g e rs ,
it'l of th e ti("st s h o wS th
fe c O \\ e
s tN C t\ o n .' of! .""..
-
,,>"'/
<!JW<'
~
'::: .
.,.
......
',,, ii
.)
',,;,;;' '~
y' ;::':"
:H!!!! .. $ ~~:Hi; 'i:"" .;t~ .~:. 8. The earlier replica tied up at Calais. The
.... r.& ,,':T ':&
large lettenng on the transom giving the
.::: . ...;.;-:.. !"H"
:::;:. .~
ship's name and her place of construction is
not authentic.
.i
'%
~".
•k.,iLG:i'ki;;:':::<~~;fi;,o
Large scale copies of the drawings reproduced in this book ean be obtained
from the author ~ Details from: Jahn McKay, PO Box 752, Fort Langley,
British Columbia, Canada VOX I}OA
A Generar arra nge men t and !ines
A1 GENERALARRANGEMENT
A1/1 Isom etric view (no scale )
A 01/4
A General arrangement and lines
/ A2 LINES
A2/1
A2/4
~
I
I
Z.i" w..c)-
_._::". . _,,-..-_ _ ~-H't-J :
ll"
--1-----
~.o=-"-1-_.,-,,4--,'
-0,,--'_-l-----=4~'
-o'. ~ 4'-0' "-,,-rl_-1- --,4,--;--".O'~---+- ~'-o' 4'-0'
r-
J-
-----
r,. -'U_tJd
I , ,_
I I
I "
I I
I I
I I
I I
I I
I I
! I:
,
II - o'
--~-
9'-10'
- ---,---,-----
- -. . . . - t== -
--~------~~--.------- ---_ .. - --"'---.-'-..
f
~
~
~
~
~
.,..I ~
... ~
-- --
I
1
A2/3
J
15' - o· 10'-2" 8'-0' . 6'-1'
+
._---.-._-
--
_ _ _ .~ _ _ .
---1 .........-
'--'--
- - -- - - - -.-~ .--~'- ' - - .
--._-
~~-:~~~-.-~.~----~~------~-~--.~------
.. -_--
--- . -. -
---_o ~.~ --
~
--- --
A3/1. ft...p. +
I· ---~ n D n D n
I~~~
I -- o o o o
---~
----______________~===~~7P~~~-----------
---------~~~
- - - - ..
~------------
=========================~====~
f ._----- --~--------
t
--------_.
----
~~""C;~S-i~i'C~c'-~"=~;.c·~~";;f,E-~ ,.;;.~ ~~~-~~-"""'""'".'S,,7pi'~"'''-' ~~.~~~
··W ...
A General arrangement and lines
A3/2 Outboard profil e of Sethia
(1/96 sca'e)
~~
----~-~-
--------- -------
-----
-------_._----.
A3/2 I
+ I
I
l -,
- - - - ---.'-It----w
- -- --
----- -----~-~~-
------------------------~----
-~--~
---~-------==--=--------------
-----
----~------.--~-~
-------- -----
------ ------ ._-------
----.~-------.-----
------ - - - - - - - .-.....-~.-
-----==----
---------- -----
-~--------
-------- ---_.-" --~-----
~~==========~==~======~====~~
~ c
A3/3 Cross section at '8' (foremast)
looking forward (1/96 scale)
1. Forecastle
2. Lower deck
3. Hold
4. Swivel stanchion
5. Carrick bitts
6. Galley stove chimney
7. Galley stove
8. Boatswain'S cabin
9. Carpenter's cabin
10. Sail 'roam
11. Fore mast
12. Fore topmast
13. Fore topgallant rnast
14. Fore yard
15. Fore topyard
16. Fore topgallant yard
T I
I
I
J I
l I
l I
J \
/ \
I \
! I
I
! \
J I
I \
J
I .\
\
I
I
r ~13 \
J 1, I
I I
I I
I I
I \
I, \
I I
"I I
I I
I I
I I
J I
I I
I i
I I
I I
r 1
LI __ _ __ JI
1--
'11
T
I
~
I
J I
I \
I \
I \
I 1
I \
I \
I \
I \
I \
I \
I \
I l
I \
I ~
\
l \
J I
f I
I \
r I
I \
I
t-12 \
I I
,
I I
\
\
I
I \
I
I
-
...:...... . ................. .- --
I.
.)t*t-= Loa ..... . r.'......----
I
t.
!
I
iii 1 Jas .. _ .-s==-- ---=-~ 'S_. .. . , ,. 7, -1'-- ''IiI( -& ..
-.- - - \
\
-
\
I t
I ~
J t
J \
/ \
\
I t
I \
I
, J
\
\
\
,
J \
J \
\
I \
J \
I \
i \
I \
\
I
I \
r ~
\
I
•
I
,
\
I
I
I
I
I
I
I
l
I
~
!
~
I I
I I
I I
l I
I t
r
I I
I
,
1 t
I
!
I I
I I
I I
l 1
I
j
I _.... -- ----"----_..-.r -- ....................... ---- ------ --.---.. ----- ...... _ _---
....... ......
--- ------
I
l
I ~-- ---_ I
I ....... .............. I
~ ....... .......J
2 7
A3/4 Cross section at 11' (mainmast) --
)
I \
J
j
12 I
\
j \
I l
I I
J I
I \
I
I
I \
I
I \
j
j
j
{
9
\
,
\
\
! \
J l
I \
I \
I \
I
\
I l
I \
I \
i \
I \
I l
/ \
\
I \
j
I
,
j
I l
I
\
j \
I l
I I
I ___ .JI
I l
\
I
I 11 \
l
! \
I l
I I
I \
I \
I \
! \
I \
\
J
r
J
\\
J \
j \
I \
I \
J \
I 1
I . \
I
I
8 \
\
I \
I \
r \
I I
I \
I \
.--.:.::;;;~~-......:=...:... -~------~- .--....:..- '----:..:.....:-_ ..- ...... ..~~:. .. ,.
_ . . . ..----...._ ...--. _____ _____ ~ ~I ___ ____
~_""_~-"_'t",",T ~,
f \
I" \
i \
I , \
J \
l \
I \
I \
f \
I \
J \
I
,
I 1
\
\
! \
I \
I 1
! \
I \
J \
I \
I \
! \
} \
I \
J \
I \
I \
I \
[
I
~
t
l
~
I
I
I
!
l I
I 1
j
l I
1 I
I
I I
I I
I I
I I
--- ........ - __ I
----"'-----
I ...--...-
I
I
I ",,.-"
~- - - ........ ......... j
v .... ...1
000
EJDD
A3I5 Cross sectlon at '3' (mizzen mast)
looklng aft (1/96 scala)
I 1. Quarter deek
14
I
I
\ 2. Lower deek (garden)
1
I
I
\ 3. Hold
\
I
I
I 4. Mizzen topsail sheet bitts
I
I \ 5. Swivel stanchion
l \
I I
I
6. 4-pounder gun
I
I I 7. Pot racks
I
I
I
I 8. Gunner's eabin
I
r ,
\
9. Surgeon's cabin
I
\
I
1 O. Fish room
I 12
I
\
\
11. Mizzen mast
I
I I 12. Mizzen topmast
\
I \ 13. Crossjack yard
I \
I \ 14. Mizzen topyard
I \
I \
I \
I \
r \
I \
I \
I \
I \
I \
I \
r \
I I
I \
r \
J
r ~ _______ ~ ________ tt-·Ht- ____________ ~_ _ ; 81/4
J
J
.......... ....--
-"'--',.----....... ~
.... - ~-.J
81/2
11
----------.
B1/1
..
A3/5
~
B Hull construction
Bi KEEL
B1/5
B3 STERN
-----~/~
... ' ' ' ' ' ' - ' ' ' - - - - - - - - - - - - - . - - - - - ' - - - . - - - ....- ....
82 BOW 4. eant trame
5. Bowsprit
B2I1 Bow framing (1/96 scale) 6. Hawse hole
1. Stem 7. Load waterline
2. Knighthead 8. Profile at dead fiat
3. Hawse frames 82/2
B 212 Sketch of bow framing (no scale)
82/1
6
2
- - - -
4 I
I
I
I
/
I
2
~
I 3
I
I
~- - -',
I
I
8 .......1
1
I
I
f
I
I
'- f
\ /
7
/
l'
------
~
t 83/3 Sketch of stern framlng (no scale)
B3/1 Stern framing (1/96 scale)
1. Stern post 83/3
2. Fashion pieees B3/1
3. Transoms
4. Lower deek
5. Counter tim ber
6. Stern timber
7. Deek transom
8. Upper deek
9. Load waterline I I
10. Profile at dead fiat I
I \
,
I
\\
I
I \
1 \
I \
I \
\
•
I I
l I
I I
1 I
l I
I
I
\
\
10-"•.•,./
f
\
\
\
, f
, f
I
/
/
/
/
.// "
B Hull construction
B4 FRAMES
14. Gunport
15. Air scuttle
1@ 13 ® '1JJ 16
'" 14 1Z
6' Z-(1' 2'-0 '~o' 4'-{l' 4'-0' 4'-0 4' -o'
4'·0'
B4/1
---~-~-------~.---.---.- --
--13 o
ln=r-
,I I
I
I,
l
•
II
o
- f- - 1
:0'-4
I I
6 C
B 4/2
t2'~--+--~ _--+---.-.!l12.......
......--...... •' .......-I
D'~r61~;~
B4/4 Isometric showing framing
(no scale)
1". Cutwater
2. Knighthead
3. Hawse pieces
4 .. Hawse hole
5. Frames
6. Keel
.7. Keelson
8. Stanchion
9. Deadwood
10. Fashion pieces
11. SterJ) post
12. Transoms
84/4
I
IJ
-----.~
........ -------
85 PLANKS
oWing w al es an d
8511 Is om et ri c(nsh
planking o sc'ale)
1. Frames
2. Wale
3. Keel
4. Keelson
5.. Mast steps .
. 6. Deek c/amp
7. Waterway plank
8. Sp irk et in g
9. U ni ng or qu ic kw or k
10 . . Ceiling
11 . Starn pa st
12. Transoms
13 . Counter tim be rs
14 . Stern tim be r
-_ .... ...- --
.-
..... -
-_
----
.....
I
I
I
I
I
8 5 /1 I
I
~I
I
I
--- ....... -~
86 BEA MS
86/ 1
/'
.--------.
.-------'
,
. \
87/1
~ ~ ~ ~ , /
~§~
~~~~~i
~ ~ ~ ~
~~
,-
C1 GENERALARRANGEMENT
C1/1 Isometric of the completed hull
(no scale)
,
\
ii
l'
C1/1
C1/2 Isom'etric of the completed hull
(no scale)
C1/2
...
C2I1 C3/1
C2 BOW C3 STERN
C2I1 Bow elevation (1/96 scale) C3/1 Stern elevation (1/96 scale)
C2I2 Sketch of bows (no scale)
- ------=-
----
C 212 C 213
. ... _-----_-....
. _-_ .. ---
C3/2 C3/3 Stern detail (1/48 scale) C3J3
1. Compartmented 11a9 locker
2. Rudder head housing
3. Tiller .
4. Quarterdeck 16
5. Stern post shroud
6. Pannelliog
7. Wing transom
8. Lower deek
9. Rudderhead
10. Stern post '
11. Rudder
12. Counter timber
13. Stern window
14. Stern tim ber
15. Stern decoration
16. Taffrail ~-:===.::::::=
17. External planking \
-\ \
,,
""
'"
C3/4
C3/5 C3/6
C4/1 C4/2 C4i3, C 4/4
1
1
9
20
C4 RAIL DETAILS C4/4 Rall detail at statlon -1' C4I6 Rall detail at station 12'
(1/48 scala) , (1/48 scala)
C4I1 Rail datail at station '8' 1. Upper deek 1. Upper deek
(1/48 scala) 2. Lod~ing knee 2. Beam I
,~
C5/2
•
e5 COPPERSHEATHING
eS/i Outboard
, (1/96 scale)
\ C5/1
I &
, -- D1 GENERALARRANGEMENT
\
D1/1 Inboard profile (1/96 scale)
1. Upper deek -,
2. Lower deek
3. Hold
4. Fore platform
5. Aft platform
6. Bowsprit
7. Knighthead
8. Figurehead
9. Head rails
10. Cutwater
11. Keel
12. Frames
13. Oeadwood
14. Stern po st
15. Inner stern post
16. Rudder
17. Cathead I
.~.~
1 B. Half-pounder swivel
19. Fore topsail sheet bitts
20. Foremast
21. Pawl bitt qost
22. Windlass - I •
23. Bell
24. Fore pin rai I
25. Rail i ;
26. Boat ehock
27. Gompanionway
28. Main hatch
29. Fore brace bitts
30. Mainmast
31. Pump
32. Main pin rail "-
33. Capstan 1;""- - _
38. Tiller
39. Flag locker
40. Stern lantern
41. GaUey stove (starboard)
42. Fore hatch
43.
44.
45.
46.
47.
Captain's dining eabin
Garden (great cabin)
Rudder head housing
Lobby
Boatswain's store room
DO
48. Boatswain's 8tore room
49. Sail room
50. Shot locker
51. Hold wall
52. Spirit room
53. Fish room
54. Bread room 54
55. Mast step
56. Keelson
57. Geilings
I
0111 Z (ro) r
"' .. \..
J
,
,
.
8
I IJ
-----.-""1.~ .... ;- - - .... ,_ ..... __ -, ~ _____ .....,. r-- _ _ -.. OI" - - -~r --- - L ---- ~ ~r
..... L...! • ..1 L......II f
2-
-. -- - - - - - - - - ___ o _ _ ~ _ _ _ _ _ _ ~ _ _ _ ~ _ _ _ _ _
.h:J,.JI-f"I+~\"...j..----U-J+lKo~~~~+...jj
~~
-~-- -- ..
--~ -~---~--,,,
3
____________.___________________ ... ~====-....:.=---.:.....~~~~~
__~ __ ~
___~
__~
__~ffG~--~-- ;;--r=--t
(8) c
D1/2 Inboard profile of Sethta
showlng alterations (1/96 scale)
1. Swivel guns and stanchions added
2. Flag locker added
3. Fore braee bitts altered
4. Great cabin renovated to form
greenhouse
5. oeek locker removed; gratings
installed
6. Ports added to hatch and
companionwayeoamings
7. Gratings added aft of wheel .
8. Companionway reduced
9. Carpenter's and Boatswain's eabins
removed port and starboard
10. Scuttle and ladder removed
11. Pantry and Captain's dining cabin
added
12. Stove and galley removed from hold
13. Galley stove chimney removed
14. New galley stove installed
15. Cabins rearranged at fore platform
16. Cabins rearranged at aft platform ED
17. Air scuttles added (three toeations CD
port and three loeations starboard) Q)
18. Shot loeker added
19. Hold well (pump well) added
20. Changes to hold under fore platform
21. Changes to hold under aft ptatform
22. Timberhead at cathead modified
D~
·23. Belfry modified at windtass pawl bitt
past
24. Bowsprit steeve changed
25. Masts restepped on mast steps
26. Boat chocks and boats added
I
D1/2 J
.. ...../.
BiS
-" ..... '.
\.
r ,
I
",j& c
LI IHrernal nUII
D2 UPPER DECK
..
I \
+ c D
- - - r - - .. - - - -... --
____ __ . _ _ .
. ------ .................- - - - - _ . ~___L_
-~
. '--r
o ~ ~ Q o
--~~...;:......,
Q 9 O O
-
O (> o )---- - .. -" . . . . - .... - .
' 1 )--'---. ,/ ';
----
·--:-====it--Fj==-=.. ~i.==~-:!:::::.) - n .... - -----U= .-~~~~----M,.--"'
("
. r
c
D Internal null
D2I3' +
.............---------------~~-~---,---,----.
D2/4 Upper deck isometric of Bethia
showing alterations (no scale)
1. Swivel guns and stanchions added
2. 4-pounder guns added and ports eut
into bulwarks
3. Flag locker added
4. .ore brace bitts altered
5. Air scuttles added to forecastle port
and starboard
6. Deek locker removed; gratings added
7. Gratings installed aft of wheel
8. Galley stove ehimney removed
9. Galley stove ehjmney added
10. Timberhead at cathead modified
11. Belfry modified
12.. 80at cMocks and boats added
13. Parts added to hatch and
companionway caamings
14. Bowspdt steeve ehanged I
D2I4
D Internal hull
D3 LOWE RDEC K
10.
11.
Hangin g knee
Oeek. beams - numbe rs coZrespond
:N
I 8
to adJacent f r a m e s · I
12.
13.
Transo m knee
Transo m
:®
I
I
14. Count er Umber I
l
15. 3tern timber I
1M
16. Fore-a nd-aft carling s
17. Athwa rtship carling s (Iedges) lS Y I
14;1
I
18. Frames ,
I
~
I
19. Oeek elamp \_®
----- ---~
I I
z. (lO) l
03/1 +
(8)
!.ft c
,
. . _ .. _ _ _ _ _ _ .. _ l .J..._
""-_ .. _. --T--- -.... -- -.--.:: .... ....:..~-
· - T - -. _. _-----L. _ . ___ .. . .- . - - - - - - - T --
--~--- ...... -
. _ _ _ . __ ....L. . _ _ _ _ •.•...
L • ___ _
. - .. ~ --- ..
. _1...- _ .. ____ ..
.. T .-.- . .~ T·
-_._. T - -- ... - -
_... ---' - .. -- ..
L,
. .-:--~-~~_-=-. ~L-~~~.- _. __ _
._.
_ ."..-- _.. - - - - .~.~~. ---- . _ - - - - -- -
_ _ _ _ _ - - - - - -- - -. __ - ------_~~. ---4c...:::...........~a
" _ _ _ _ _ _ :- L _
u_ L________
-------,.- _ .. _. _ _ ..L.- _ _ . _. _ _.~I"
. l ______ o _ o J _
___ ~ . ..L_ _ __
T
____ 1
.. _ _ _ n_. __ . _ _ _ _ · ___ . __ =--_--==-=r._-:
--_ .. _ ....
. ..1
,
T
·I--~.~_~
. r - - ------ _I
I ... ---_.. ..~
1
_---L--_._._. _ _ - - . _ .. _. _. __ --{
.1. . _. .-,-
.. ----rL-
.- - ..... --1-- .- .
I j [
+ jl 6 c o
_ II IL'IOJI I IClI IIUII
_ ... 1._._ __
~~~~~~~~~~~~~~~--l - - - -,1 - -
. -----r- - __
__ ...L ____ ... ________________ .. , . L
.f.~ _
'-..:"~
...- . . '!Y- .------;
~-.,.,I~f,,-----·----··---
'- __ o _ •
--i+-
r ... !-
'-_._ '.
• ....,._-'1 f------
.. ~ t..-=--__
~ ~--
i
==--=--=---=
,-~, ._- --- .
D3/3
,
__ I
__ __________=r:
~
,,
,,
,
,,
\
I
\
I
I
,
I
T . I.
-=-t- ,,
1
I'~ ,,
I
r
I
I
I
I
I
I
& c I
I
,,
I
;
/
J
I
I
I
;
J
,,
J
, I
, I
,/
I
/
r
,/
/
..- /
"
D3/4
D4 HOLD 04/1
D4/1 Platform framing (1/96 scale)
I I --~-----~------ ,
1. Cutwater
2. Open for scuttles
3. Foremast
4. Mainmast
5. Mizzen ma st
6. Beam (to support cabin over)
7. Carlings
8. Stem post
9. Beams (note pillars under)
10. Frames
I
D4I2 Hold (1/96 scalel
1. Cutwater
2. Carpenter's stme room I
~
3. Gunner's store room
4. Boa1swain's store room
5. Sail room
6. Scuttle to magazine . ....
7. Scuttle to Boatswain's stores
8. Carpenter's cabin
9. Fore platform
10. Boatswain's cabin ~. . ., - -------+---'0)
... -- - - -
11. Pitch room
12. Black room
/~~~~===i~~-=.~~-·7~~.~: --~ ~-t==~
"""====1 ---
13. Companionway
14. Scuttle to sail room
15. Foremast
16. Hold
17. Fore hatch over
18. Main hatch over
19. Shot locker
20. Hold well or pump well
21. Mainmast
22. Elm tree pumps
23. Att platform
24. Companionway .,...
~~~-~~1--=-----~---.---~-~~~Jm:S
28. Slop room
29. Captain's store room
.
X~ ~~ ___
--__- - - -
30. Gunner's cabin -----"'if-:..:::.
--"-_=__
31. Botanist's cabin L
:x
32. Captain's clerk's cabin
33. Surgeon's cabin ~~~
34. Steward's room
~
35. Mizzen mast
36. Bread room
37. Stern post
D4/2. Z J
I
38. Rudder
...... --.--~-.--~
)
. -.
·tf ____ - ____________ --- .. - --- - ~~;;::::;;;;;~~~~0l
- - - - - - - --- - - -- _. - -- -- - - - -
-" ~----,.,-".
~-------------------
lC!)
.J
-li
c
1I-iJ,
I :.><.I IX
rx....:r_,
_ --------J_
16
, ~ ~~~~;~__;1_.~I____n_~~:_~ _"~.:.:~~5~. i! i i i ·~i i i i i i ~_~_.":. ~-'\~i i i i ;j j~'i i i i ~ ~ __
~ ~ .----..~ 7 ~ ~
-==- ~=~ - i ==_
• 1------. 1'"- I l ..
L___ ~ ______ J ~
I
•
~--. ...
;S;
..
f-----..,.....A'J--t
n {/ = 1 6 fr- ~ ~7 t
t---------- - ~ ~ ____ L----" / ~
~l"~ (~ -- -------( . ~~
~-~~-, --.-.~_-=- ~ _____ -_ ;7~"
t- ~" _ __o __ -- _o _... _ _ -- . ~ ~ ~
t·
+ c D
I I I I
x xxxx
I I I I
.~
ll.
~~ (
x'
~~-' =-=---~
r /
~
.- -.,.
-- _.. _...... - ..... -~
-
~--2i--
-
.,.:
--
'-.
/ "0 -28 10
.-. !!lo.. --
I--
1--
~----. - --
~
V 'v
/y
-_o --
-
--- ,- -
r--
-- ~'
-~
r -, --- - -,
, - 1--
!
i
I
'%
...
~
....... 8
I
: --
i . : -- r-
t1
i
/
.---- ./
L''''
.-
--
~-
---'-_c
:..:=
.. V=tl . ..-7
ii
!
...
5"
-~ =r: ~
"""" -,
-!
-
j".
I
"-- ----- 26 .A --
--"T
1
- -- - • r
-----
-_.. i t1L ~-
l
12
--- p-.
~
iI 3
l.
1
1 ! 2 f
- - - - ,_o
- '-'- I
L ___ ___________ L __________ J
~~---
-- E ff --_~_- ~
27 -_.'
-. on
"'II
- ~ ,''''-
~ .......::\/~ ~~
'lA -'lA
.
.-
-=~----
-_ ... ----- , ~
-. .-
-
----
- ---
--
.!
~ ---- ~
,"',,
.... t7
~
66.: --
--------=-=- L;::;:/ .~-
-po-
x ;x
YX X IX
,
I I (
./r..F. + l + .ll
D4/3
, -
I
~ .
04/4
, I
7
I
I ,I
IL __________________ 91
~
---------1
a:
6
17
fi;.:J'. 43 , +
I
J +
I J; l
ft
D4/5
04/5 Hold (below palletingJ (1/96 scale)
1. Cutwater
2. Forward magazine
3. Boatswain's store room ;1..
4. Scuttre over
5. Mast step
6. Sail roam
7. Hold
8. Fore hatch over
9. Main hatch over
10. Keelson
11. Limber board
12. Shot locker
13. Hold well
14. Elm tree pumps
15. Foremast
16. Mainmast
17. Spirit room .f
18. Fish raom
19. Pillar
20. Aft magazine
21. Bread room ',
i'~~~
• J.W....-
05/1
2
.: 2
\.' \ .
D5/3 OS/2
D Internal hull
D6 CROSS SECTION
D6/1 D6/2
J - __ ~tL ___,_~
(-- I -- 06/5 Cross section at ffi looking aft
"
'~~ .;-----
,
(1/96 scale)
1. Upper deek
Jlo:"'''' 2. Lower deek
3. Hold
4. Fore braee bitts
5. RaU
6. Shot IDeker
06/5 D8I6
D6I3 eross sectJon at 'A' looklng
forward (1/96 .cala)
1. Forecastle
2. Lower daek
3. Hold
4. Windlass
5. 8ell
6. Pawl bitt past
7. Pawls
8. . Pawl rim
9. Carrick bitt
10. Fore hatch
11. Companion.
12. Pitch raam
13. Black room
D6/4 eross section at @ looklng an
(1/96 seale)
1. Upper deek
2. Lower deek
3. Hold
··13··· 4. Cutter
5. Launeh
6. 80at choek
7. Companionway
8. Fore pin rail
9. Chesstree
06/3 D6/4
D6/7 06/8
D6/9 Cross section at '5' looking aft
(1/96 scale)
1. Quarterdeck
2. Lower deck (garden)
3. Hold (bread room)
4. Half-pounder swivel
5. Pat racks
06/9
D6/10
-- ---_.__ ...
E1/3 E1/4
1 2 o
o
o
o
4 o
o
o
o
o E1/6
I
.
O)
E2/1 E2I2
E1/5
E1/7
E2 BINNACLE
E 2/3
77
E3 QUARTERDECK FITTINGS E3/1 Sketch of quar1er deck looking
forward - tiller, wheel and
binnacle (no scale)
E3/1
.. '".,
-_._-------- - -----
E 3/2
E4 CAPSTAN
~tall2
E4/2 E4/3
E4/4
E 4/5
ES LANTERN ES/3 Side elevation (1/32 scala)
ES/1 Plan (1/32 scale) E5/4 Isometric view (no scale)
ES/2 Rear elevation (1/32 scale)
.~
".' :-
E7/6
-,
"(~~'/~
l(l/[ r .:-~ ~." (, -; . 6 Z,
F1 4-POUNDER GUN F1/3 Seetion (1/32 scala)
~~ 11.
," \ 12.
Carriage side (bracket)
Loops.
o r "/~, F2I1
1.
Plan (1/16 scale)
Barrel
13. Bed bolt ./ 2. Reinforcing rings
14. Transom bolt
, , 'I.
113-;~·' '~ 15. Truck
3. Astragals -
~~ j
, 'I...
4. Muzzle swelling
5. Muzzle
,'.1 •
6. Trunnion
./ ,
__ o' J'-'~'~
...... ,
.~.~ ~,./
.... ,~.- I i
i
7. Vent
"'!'. I ,!
: ~~ 8. Pommelion
:~.'
9. Yoke
I ,
r.l J'c I
./-""'"
~., ~
F2I2 Side elevation (1/16 scale)
1. Barrel
2. Reinforcing rings
3. Astragals
4. Muzzle swelling
5. Muzzle
6 . Trunnion
7. . Vent
8. Pommelion
9. Yoke
10. Shoulder
F1/7 11. Spike
'. 12. Stanchion
.----.---_.-
... -.
, .....
.~~
-/'\ ~
,
c,,~,"<,
. '. \.
j; '- '
L
5
t""'"-6
_ ....... ,1-
G1 GENERALARRANGEMENTS
r- __
,
I
1
-
I
I
I
I
l
L
\
I
I
,
I
I
I
I
I
I
,I
I
J
I
r
r
r
f -~.-~
,
\ I
I
, r \ \
\1
,L
,,r 1\
I
I 'I 1
I
r
I
/
:' 1\
\
I
I
I
1\ I
I 1\
I \ I
I ~
J
,
I \
I
I
I
I
I
~
~
,,,
I I
L
I
I
,
I
I ,
I
I
I
I I
~-
-
I
I
I
~--l J
I l
-- ------
I
I
-~
G1/1
G2 BOWSPRIT.
G2/2
Plan
G2J5
G2I6
G2/7 G2/8 G2/9 G2I10 G2/11 G2/12
......'
j I
02/17 G2I16
C~-,
17' -l"
"-
ct·-----;..-
,,- r... .
~
G3/4
G2/18
G3/3
~I7'!e"ra"I l'-in' ,. --= t - ~],,' hounck
"- O'hfoad
ga.
G2I13Jlb traven.r - 'ront and side
elevation (1/96 scala) G4/1
G2/14Collar and gammoning cleata
(no scale)
G3/1
- "
3 ··e' 15'- 4'
~~JL ___________________ ~ ___________
··~t· -',
1li ~I
II;
... .
l
-e...
a
~
....
i !
R G3/2
7' -l" 1-" 7' -l' 7'-1'
.--t-
. '--.' ! ~....
+--------------------------------~.:-~rr,O_------------------------------___lI--~-~_.~
o'______________________________
..... _________ .• _}!·, ......
-4~'
. __.__.5l15c_=..·
-------------------------j
_ _ _ _ _ _ _ _ _ _ _ __+
'.-: ,<p,
I.L .GlJ
-------
- - ------ ---------~---~-~----- - .......
- --
, .......
~
I
G5/9 Section of fore top (fore and
aft) (1/48 scale)
- 1
r--r--'r--+-
I
I I -+----,
,
I
I
,- T--~-T-' •
G6/3 Fore topmast cap - plan, side
elevation and front eievation
I l 1 I • I
I
I
L_,.L,
I
I
--+--+-L+--.1
\
I
I
I !
I
I
I
L_~_ -i-J
: II: l' :II :
(1/48 scale)
I I I I I I I ,
I I. : I ~ , I G6/4 Fore topmast - fid, bolster and
j f I I
I
l
1
1 cheek block (1/48 scale)
I I I I I
I I' I I
I I: j
I ' I
I ' I
:
j I
/1 -: I ':
I, I
I
iI
J
I I I --"
I I
I I
I I
I
I
I
I
TIt··-~
rim
G5/9 G5/10
9l!I'
! :; ,!.; 2'-o\~
G,2 9lI'
,/
6
I
.. 183,6
li·,i'l..~~~f'~R~J'9.}( - 'r----ffISirtiQI't' l GO, 96
d2~,~*====~~==~~============="~g;~~'~~~4~~~~~~~;~4~~re~=r~~e~_~
~,(;! G4/4 '3,tJW
G4/3
1~'
G4/8 G4/9
- '1 ii
') rj.-'
, ,
',,"
G4/3 Fore topgallant yard (1/96 scale)
(1/96 scale)
{J
tlLIII."
G4/7 Fore topgallant studding sail yard
(1/96 scale) ~
G8/3
------ -------
-
~ -~.. ---- -----I~? ~----=----
~~~
rak~ gft - t - 6' per 100' r
r.\Qil') l.gwyr Mos! '"
)9'-D'
, '-\ .. 55 '-(l""' - - - - ..._------------+
..
__ 87 '- ili:.Jgy~l!1'_ oi Iruck)
-----< c~·:_,--\\,--L.' . - - - - -
": \ c· ",
~. , ...-
!i'-O·
pn&(oU...-
studd ing S-all
boom- 31-,'.
~, :{~
G8/8 G8/9
1 2 3 4 5 6
r-- - - --- --- ,--
I
i
1--_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ :5+1L-..,::.!;".;..c" ~rter dK~ t> top of_lr\JCkL~_-
,
,I
,,;;-l
l' .
G9/1 G9/2
L =
G9/3
----------
G11/1
G11/4
• Jf~"
• ,'~
_ _ _ -1
-
houods
, . .r .\ .
. - '. . .•
.
I ':"+",
. ,
:
.
'" "('
G13/1
,-
~-:: .-.,-
W
'-9~'
_ 2' Ihick
G15/4 Mizzen,topmast
G15/5
~-
~,
!.
'" G15/3
i· .....-
~....
/
:.. .. ",
~, G15/7
1 • --.. ................. -....
U! '
................................
..............................
,,
L
r
r
r
!
I
,I
I
I
,
"
f~
.,
I
I
I
,•
I
I
,
G15/1 G15/6
------ - - - - - - - - - - - - -
G15/22
G15/11
,G15/12
G15/23
G15/13
G15121 - -,
\('10.1:::
H1 STANDING RIGGING
H1/1
- . r--
-c-' .:.,
-- ..
I . __
- -': :--- - -.- j ._~~ ~~ -~-~-.~
. "-_o ' .
.,~.
____ .-
..
"
- ___
----:-.~--~.- .
I
. ----. -
_.- -- ~
. _.: __ I _.
i" "=': __._::-
..! ...J - Jo". - - ~
---_._.-
H1 /2 Iso me tric of sta nd ing
rig gin g
(no sca le)
H1 /2
H Rigging
H1/3 H1/4
~:;::.
~:~,:.",
<"
"',-,.. ~.
1,
. .-.~.- ...
:~~'<~C;\:,: .
.. .>.,1. .
.-------~ .. .
"
~.-.,
~ ...
,~
:,~ .:
H2/1 ~- ,-
100
. H2I2 Isometric of running rigging
(no scale)
H2/2
. . . <.:<..~~:~
\',
"~ .. ~""
'\>: :'
~.- ~.~.-"~~0"""\-~-'-~!.
\
/
\.,1-.
Wl
7/
......
'-.\
\ ". '.\ \ \
\\,,\\\
\.,".,.<""
".'"" '" -.... \. L
-~~.-~~"-_\_- --~.;-
'lif
---N
l:
\\\~!~!,:~~~«
\~~\11'\\ ····...,V··.
~
- --/
,.
-"--_---;~\~'~?~i!i~~
'="'C;>;:-~_~~'5'~-"
-,
•
- ' - -- ~.
-.+-- -
-,' - - L , , ,'.
'.' . ..\.\\\
. . . \\.:'
""\l
C ,_I ":,;~~~
'. \\
" ~
\ \\
\, \, \
..... \
o>
c
o)
-
o)
1: (f)
---:::cN
2:
J Boats
J2 20-FOOT CUTTER J2I10 Mast (1/96 scale)
tIt~feE
J2I2 Outboard profile (1/96 scale) J2I13 Isometric of 20-foot cutter under
sail (no scale)
J2J3 Section (1/96 scale)
1. Stem
2. Keel J2/2
3. Stern post I ~" I - I-1- -I-1-1 I 1 I I I 1- I I I I
4. Rudder foR b 7 '" ? 4- .) Z 1 +- II fj C D l :r 9 J{ lP
J2/5
5. Tiller
6.
:r~~j~~~---
Mast step
7. Gunwale
8, Frames ~-;:::!V
9. Thwart
10. Bowsprit
11. Mast
J2J13
J2/12
,r -6'
'1'-0' 6'
4'~"""---- - ~f:T"siii~'::;"'"
1pl'flt> ,l..'
J2/10
J 219 J 2/8
Anatomy http ~ l/ mirageswar , c om/
of the
Ship
Made eternally famous by the mutiny against Captain • Pictarial section emphasising close-up
Bligh in 1789, Bountywas a small merehant ship photographs of the reeent full-size replieas of
purchased and converted inta a naval transport to the ship
transplant breadfruit to the plantations of the West Indies. • Calour guide to possible paint scheme on the
Thanks to good surviving documentation , this book ean book jaeket
depiet the ship when purehased as the mereantile Bethia • Mare than 300 perspective and 3-view
and also as fitted out for her unusual naval employment. drawings, with in-depth deseriptive keys, of
every detail of the ship - general
arrangements, hull construction, fittings.
masts, sails and rigging, armament, and the
This volume features launch in which Bligh made his epic voyage
• Full description of the ship, how she came to of over 3000 miles to safety in Timor
be pu rehased, and the short history of h er
naval service