[BACKUP DATA CALCULATION VOL]

10 APRYL 2022
Prepared by
CALCULATION SHEET DATA

CROSS SECTION VIEW SITE PLAN

I ONSHORE : ACCESS GEOBAG (L 740m)

Top Basecourse
(0.5x10)m : 5m2
7 5
W (2x8)m

CAUSEWAY
GeoBag
6 (2x2.5)m : 5m2
0,5m L 500m
1m 2,5m I
1m

4 W Geogrid & Geotex : 14m 1

3 2
GeoBag-Left (sisi kiri) GeoBag-Right (sisi kanan)
Fill Earth (medium)
(1x11.6)m : 11,6m2

Fill Sand/Earth (Bottom)


(1x13.2)m : 13,2m2

ACCESS
II OFFSHORE : CAUSEWAY GABION (L 500m) L 740m
Top Basecourse II
(0.5x10)m : 5m2
8 6
W (2x8)m

Gabion
7 (3x3.5)m : 10,5m2

0,5m
Variation
1,5m 2 to 4m
(rata" 3,5m)
2m

W Geogrid & Geotex : 17m 1


Bamboo Pile @2m

5 2

4 3
Gabion-Left (sisi kiri) Gabion-Right (sisi kanan)
Fill Earth (medium)
(1,5x14)m : 21m2

Fill Sand/Earth (Bottom)


(2x16)m : 32m2

CALCULLATION SHEET
CALCULATION SHEET DATA

CROSS SECTION VIEW SITE PLAN

III ONSHORE : ACCESS GEOBAG (L 230m)

Top Basecourse
(0.5x10)m : 5m2
7 5
W (2x8)m
GeoBag
ACCESS
6 (2x2.5)m : 5m2 L 230m
0,5m

1m 2,5m
III

1m

4 W Geogrid & Geotex : 14m 1

3 2
GeoBag-Left (sisi kiri) GeoBag-Right (sisi kanan)
Fill Earth (medium)
(1x11.6)m : 11,6m2

Fill Sand/Earth (Bottom)


(1x13.2)m : 13,2m2

IV AREA - SCGD 02 (150x150)m

Top Basecourse
(0.5x150x150)m
7 5
W (2x8)m

GeoBag
6 (2x2.5)m : 5m2
0,5m

1m 2,5m

1m IV

AREA SCGD 02
4 W Geogrid & Geotex : 157m 1
(150x150)m
3 2
GeoBag-Left (sisi kiri) GeoBag-Right (sisi kanan)
Fill Earth (medium)
(1x151,6)m : 151,6m2

Fill Sand/Earth (Bottom)


(1x153.2)m : 153,2m2

CALCULLATION SHEET
CALCULATION SHEET DATA

CROSS SECTION VIEW SITE PLAN

V INTRANCE ACCESS (L 10m)

Top Basecourse
(0.5x10)m : 5m2
7 5
W (2x8)m

GeoBag
6 (2x2.5)m : 5m2

0,5m

1m 2,5m INTRANCE
1m L 10m

V
4 W Geogrid & Geotex : 17m 1

3 2
GeoBag-Left (sisi kiri) GeoBag-Right (sisi kanan)
Fill Earth (medium)
(1x11.6)m : 11,6m2

Fill Sand/Earth (Bottom)


(1x13.2)m : 13,2m2

VI STAGING AREA (432Ha)

Top Basecourse
(0.5x207x211)m
7 5
W (2x8)m

GeoBag
6 (2x2.5)m : 5m2
0,5m

1m 2,5m STAGING AREA


1m 4,32 Ha
(43.200)m2
4 W Geogrid & Geotex : 215m 1
VI
3 2
GeoBag-Left (sisi kiri) GeoBag-Right (sisi kanan)
Fill Earth (medium)
(1x151,6)m : 151,6m2

Fill Sand/Earth (Bottom)


(1x153.2)m : 153,2m2

CALCULLATION SHEET
CALCULATION SHEET DATA

CROSS SECTION VIEW SITE PLAN

VII AREA - SCGG 01A (200x200)m

AREA SCGG 01A


(200x200)m
Top Basecourse
(0.5x200x200)m : 20.000m3 VII

8 W Geotex slope : 8m
6
AREA - SCGG 01A (200x200)m
7 Gabion
(3x5)m + 2m : 17m2
L 800m

0,5m

1,5m
4m

2m

Geogrid & Geotex : (235x235)m


1
5
Bamboo Pile @2m

(11.664 ttk, 23.328 m')


4

Fill Earth (medium)


1,5m x (204x204)m : 62.424m3

Fill Sand/Earth (Bottom)


2m x (206x206)m : 84.872m3

CALCULLATION SHEET