Power & Blowing Station (Pkg. 10)
Introduction
A Power & Blowing Station has been envisaged to cater the needs of steam for Turbo
Blowers, Turbo Generators and Process. The Power & Blowing Station comprises of 3 nos. of
multi fuel gas fired boilers with auxiliaries, 2 nos. steam turbo generator with auxiliaries and
space for 3 no. of steam turbine driven Turbo Blower with all auxiliaries.
1. 3 X 160 TPH (MCR) Multi fuel gas fired boilers with auxiliaries
2. 2 X 40 MW Steam Turbo Generators with all auxiliaries
3. DM Water Plant
4. Cooling water system including pump house, cooling towers etc.
5. Emergency DG Sets (Tentative Capacity: 750 kVA)
6. Compressed Air System
7. Chemical Dosing System
8. Three nos. structural chimney of 85 m (each)
Major Facilities
Pressure of fuel gases (BF, CO and BOF) for fuel gas & burner system design will be as
follows:
The total steam generated from all the three boilers and steam available from CDCP at
the battery limit will be connected to two nos. of main steam headers which shall be
distributed as follows:
1. Steam Turbine driven turbo blowers
2. Turbo generators for power generation
3. Standby PRDS (Pressure Reducing & De-superheating Station) arrangement to
meet process steam requirement during turbine outage.