You are on page 1of 2

PI No……………. Date- ….

……………
To,
Mr…………………………………………………………………………….…………………………………………….
Address………………………………………………………………….. …………………..Pin Code ………………….
Mobile No. 1. …………………………. 2………….. ………………….. Mail ID …...………………………………….
District ………………………... Location…………………………………………………………………………………
Proposal for Design, Erection & Commissioning of Rooftop Solar Power Plant System.
Bill of Material for ON-Grid Solar Power Plant

MNRE DBT scheme (Subsidy) with Polycrystalline Modules


Particular Single Phase Three Phase

Plant Capacity (KW) 3 4 5 6 8 10

Total Cost Project 180000 240000 290000 348000 440000 550000

Total Subsidy (LESS) 43764 51058 58352 65646 80234 94822

NET Payable Consumer 136236 188942 231648 282354 359766 455178

Bill of Material:-
Solar Modules – Rayzon /APS/Pixon/INA – DCR Modules 330/335 Wp
Grid tie Inverter – Ksolare /APS/ Growatt
DC Cable – Polycab / Microtek
AC Cable – JDVVNL approved
Structure – GI Pipe / GI Strut Channels
LA & Earthings – Itorrent / True Power
ACDB & DCDB – Standard Make
Meters – HPL/Genus /Secure
Note: - Payment terms – 40 % advanced with PO. 40% after Structure supply, 15% after Module supply
and 5 % at Net metering.

Subsidy will be received in customer’s bank account after 30 days of Net metering.

Subsidy scheme is Rs 14588 per kw up to 3kw then 7294/- per kw up to 10kw, above 10 kw 94822/- is Fixed

Authorized Channel Partner Of Document Required:-


1. Aadhar card
VK SOLAR : Jodhpur
2. Electricity Bill
SUNRISE SOLAR :Bhinmal 3. Photos- 2
Register DBT National Portal 4. 500 Rs stamp -2
MNRE JDVVNL Jodhpur Customer’s Signature 5. Cancel cheque
Terms and Conditions
1. Solar Power * 5 year warranty complete system
Plant warranty * Solar Modules performance warranty 25 years ( as provided
by Manufacturer company )
* Solar Grid Tied Inverter -5/7/8 years (as provided by
Manufacturer or OEM company)
2. Payment terms * 40% advanced with PO.
* 40% after Structure supply,
* 15% after Module supply
* 05% At Net metering.
3. In client Scope * Free space for solar Installation to be provided by consumer.
* Electricity for working will be provided by consumer.
* load extension (if needed ) is in consumer’s scope.
* Cleaning of Solar modules is in consumer’s scope
* Regular monitoring of power plant is to be done by
consumer.
* Internet connectivity will be provided to the Solar Grid tie
Inverter by consumer.
* Transport Extra Jodhpur Outerside for Actual Rent.
* Hightrise Cost Extra (5ft Above ).
4. Net Metering * All the charges of Discome (JDVVNL) for Solar
Installation as well as maintenance such as file processing
charges, Demand charges, Testing fee of Meters or Meter
Installation charges will be paid by consumer.
5. Project Completion of project will take minimum period of 45-60
completion days from the date of advance payment and receipt of NoC
from Discome.

FOR JAIPAL GREEN ENERGY


(JGE SOLAR )
(Auth. Seal/Sign)

You might also like