Professional Documents
Culture Documents
……………
To,
Mr…………………………………………………………………………….…………………………………………….
Address………………………………………………………………….. …………………..Pin Code ………………….
Mobile No. 1. …………………………. 2………….. ………………….. Mail ID …...………………………………….
District ………………………... Location…………………………………………………………………………………
Proposal for Design, Erection & Commissioning of Rooftop Solar Power Plant System.
Bill of Material for ON-Grid Solar Power Plant
Bill of Material:-
Solar Modules – Rayzon /APS/Pixon/INA – DCR Modules 330/335 Wp
Grid tie Inverter – Ksolare /APS/ Growatt
DC Cable – Polycab / Microtek
AC Cable – JDVVNL approved
Structure – GI Pipe / GI Strut Channels
LA & Earthings – Itorrent / True Power
ACDB & DCDB – Standard Make
Meters – HPL/Genus /Secure
Note: - Payment terms – 40 % advanced with PO. 40% after Structure supply, 15% after Module supply
and 5 % at Net metering.
Subsidy will be received in customer’s bank account after 30 days of Net metering.
Subsidy scheme is Rs 14588 per kw up to 3kw then 7294/- per kw up to 10kw, above 10 kw 94822/- is Fixed