You are on page 1of 8

Techno-Commercial Proposal – SPV Plant

❖ Submitted to:
Prepare by:
Customer Name: Trom Industries Ltd
Helios Natural Renewtech Pvt Ltd
Project Location: Gandhinagar
Ketan Nayak
Proposed Capacity: 4600KW (DC) Project Manager
Module Type: 545wp Mono– Waaree Mobile: +91-76000 22624
Name of Discoms: UGVCL Custom. Care Mo: +91-76000
48554
Project Policy: - Email:
Type of Roof: Ground Mounted project02@heliosnatural.com

❖ Investment Summary:
Estimated Power Generation (In Year) : 21,60,173 kwh
Estimated Saving (In Year) : 1,72,81,382 Rs.

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar
Date: March 18, 2024

To,
Trom Industries Ltd
Gandhinagar.

Subject: Solar EPC Quotation for Grid Connected SPV Ground Mounted Solar System.

Dear Sir,
Helios Natural Renewtech Pvt. Ltd. is pleased to submit its proposal for your valuable inquiry. Our proposal
contains a brief description of techno commercial offer and cash flow statement with payback period
calculations.

Helios Natural Renewtech Pvt. Ltd. was established 2017and has a worldwide presence in India & USA. Helios
Natural commenced its business with a single objective of accelerating the adoption and growth of solar power
systems across the world, not only for its obvious environmental benefits but more importantly the economic
benefits to its clients. That’s why we offer highest quality products at the best price. Following are a few feathers
in the cap for Helios Natural:

✓ More than 12000+ happy customers ✓ More than 50MW+ Megawatt Installations in India
✓ 154709+ Megawatt of power saved ✓ On Time Customer Support Services
✓ 7+ Years’ Experience ✓ More Than 1350kwp+ BU Projects Completed
✓ Experienced Staff ✓ In House Design

Visit us at www.heliosnatural.com for further details.

Solar Energy solutions over the period has evolved from being an expensive Clean and Green energy option to a
major cost saving option for the industry, in the highly compelling market scenario, where each cost is put
under a microscope for improving profit margins.

We are well equipped to advise on identifying energy potential, assessing feasibility and technical know-how.
We have been involved in solar energy capacity building assignments in many countries. Helios Natural can
provide an outstanding team of international quality consultants to work closely on each project. We have
numerous full-time employees who have extensive experience.

We look forward to work with an esteemed organization like yours and build a long lasting mutually beneficial
relationship. If you have any questions regarding our submission or would like further information; please feel
free to get in touch with the undersigned.

Thanks and Regards,

From,
Helios Natural
Ketan Nayak
Project Manager
Mobile: +91-76000 22624
Email: project02@heliosnatural.com

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar
2. Solar Power Plants
Harnessing of nonpolluting renewable solar energy resources to control greenhouse gases is receiving
impetus from the government of India. The solar mission, an initiative by Government of India, which is part
of the National Action Plan on Climate Change has been set up to promote the development and use of solar
energy for power generation and other uses with the ultimate objective of making solar energy competitive
with fossil-based energy options. The solar photovoltaic device systems for power generation had been
deployed in the various parts in the country for electrification where the grid connectivity is either not
feasible or not cost effective as also some times in conjunction with diesel based generating stations in
isolated places and communication transmitters at remote locations.
With the downward trend in the cost of solar energy and appreciation for the need for development of solar
power, solar power projects have been preferred by many industries and users. A significant part of the large
potential of solar energy in the country could be developed by promoting solar photovoltaic power systems
of varying sizes as per the need and affordability coupled with ensuring adequate return on investment (ROI).
Solar Power Plant gives constant energy to load without any interruption. In India where sun light is available
almost throughout the year, power generation would be achieved efficiently by Solar Power Plant. Solar PV
modules are semiconductor devices which has very minimum maintenance and long life. Solar Power Plant
has feature that generated power could be fed into nearby grid.
GENERAL SALIENT FEATURES
• Eco-friendly and clean source of power
• No pollution & no recurring fuel costs
• Ideal substitute for power from fossil fuels
• Long lifespan for Solar PV Modules – over 25 years
• Highly reliable, regulated and consistent power supply
• Can be installed at point of use to avoid transmission losses
• Very good quality power output with steady voltage & frequency
• No moving parts - negligible maintenance of cleaning of module surface
BENEFITS OF SOLAR PROJECT
• Zero Maintenance
• Payback Period 3.5 to 5 years
• Get interest subsidy on bank loan (for MSME)
• ROI (Return on investment) – 18% to 29%
• Accelerated Depreciation – 60% for 1st year & 2nd year remaining 40%
• 100% bank loan without mortgage for MSME

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar
3. Commercial Offer
Sr. Solar Plant
Helios’s offering
No Parameter
1 Type of Module Waaree Mono Module
2 Plant Capacity 4599.800KW (DC)
3 Basic Price per kw 36,910.00
4 Total Cost 11,03,95,200.00
5 GST (13.8%) 1,52,34,537.60
6 Total Net Cost 12,56,29,737.60 Including GST
Project execution Within 180 days after order confirmation and advance receipt and Gov. approvals.
7 To be decided mutually at the time of finalization of project
& Commissioning
8 Validity of Offer 15 days from the date of offer
• 15% advance on acceptance of order
• 10% after approve application from discoms
Schedule of
9 • 37% before BOS Supply
Payments • 35% before module & Inverter supply
• 3% on completion of installation& Charging Certificate issuance.
1. TCS (0.1%)
2. SCDC/Forecasting Charge extra at actual
3. Cleaning
4. Security
Extra Charges on 5. Street Light
10 6. CCTV Camera
actual
7. Land Cost
8. Metering Part & All Govn. Charges
9. Govn. Charges
10. Plumbing Line
Benefits of SPV 1. Accelerated depreciation as per tax department.
11 2. Clean & Green Energy.
Plant
1. 1st Year O&M Free
12 O&M 2. Periodically Technical Site visit
3. Data Monitoring

Product Warranty:
• Specification Changes:
Helios Natural Renewtech P L reserves the right to modify the design of the system to substitute equal
to or superior to that originally specified (in order to permit incorporation of changes and
improvements, in the continued development of the Helios natural’s product)
• Warranty:
1. 25 years’ linear power output warranty:10yrs/90.88%, 25yrs/80.68%
2. 10 years’ warranty of manufacturing defect of Solar panel
3. 5 years’ warranty of manufacturing defect of Solis/Sungrow inverter.

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar
Project Generation:
• An annual degradation of 3% in 1st year and after 0.8% per annum. (During staggering/shading if grid
voltage is not in range of inverter than inverter would shut down for that particular time period. During
that period generation of Solar is proportionately reduced. Moreover, any reduction in energy
generation from solar plant owing to Chemicals, Gas, Fly Ash and or smoke emissions from the client’s
plant or nearby pants will not be covered under the guaranteed generation.

4. Scope of Work
Sr.
SERVICE SCOPE
No
I SITE LOCATION
1 Finalization of site location with Leveling CLIENT
2 Acquisition of Land and NA process. (Land Cost Will be Paid By Client) CLIENT
3 Ensuring site availability at all times without any hassles or hindrances for peaceful CLIENT
execution of project

II PRELIMINARY
1 Basic Engineering of plant HELIOS
2 Submission of BOQ with offered makes, SLD and PV System Report HELIOS

III LIAISONING AND APPROVALS


1 Local state Govt. project registration HELIOS
2 Power evacuation permission from local DISCOM HELIOS
3 SLD approval from Local Electricity Authority Agencies HELIOS
4 Detailed Project Report- Technical HELIOS
5 Approval for grid synchronization if required HELIOS
6 Final Completion Certificate HELIOS

IV ENGINEERING
1 Preparation of all drawings (Electrical and Mechanical) HELIOS
2 Preparation of all documents (Electrical and Mechanical) HELIOS
3 Submission of drawing and documents list HELIOS
4 Submission of technical datasheet of all equipment HELIOS
5 System sizing calculations HELIOS
6 Quality assurance plan HELIOS
7 As built drawings and O & M manuals HELIOS
8 Project Handover Documentation HELIOS

V PROJECT CONSTRUCTION ACTIVITES


1 Material storage HELIOS

VI CIVIL DETAILS
1 PCC Foundation for Module Mounting structure HELIOS
2 Control Room (As per required design) HELIOS

VII MECHANICAL WORKS

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar
1 Module Mounting Structure HELIOS
2 String Monitoring Box Structure HELIOS

VIII DC ELECTRICAL SYSTEM


1 Solar PV Module HELIOS
2 Solar Cable – From Module to string combiner Box HELIOS
3 MC4 compatible Connectors HELIOS
4 Conduits for burying unarmored solar cable HELIOS
5 DC Cable (Al) from string combiner box to inverter HELIOS
6 Cable Terminations as per the scope above HELIOS

IX AC ELECTRICAL SYSTEM
1 LT Panel HELIOS
2 AC Cable HELIOS
3 Step Up Transformer (415 V to 11 KV) HELIOS

X PROTECTION SYSTEM
1 Earthing Strip Grid for MMS / Earthing Copper Cable HELIOS
2 Lightning Arrestors HELIOS
3 Tar Fencing CLIENT

XII MONITORING SYSTEM


1 Wi-Fi monitoring system HELIOS
2 Internet Connectivity CLIENT

XIII WATER SUPPLY


1 Plumbing line Only CLIENT
2 Bore-well, Water tank and water for panel cleaning CLIENT

XV TESTING AND COMMISSIONING


1 Inspection of equipment HELIOS
2 Pre – Commissioning tests of items HELIOS
3 System commissioning as per the scope mentioned above HELIOS
4 On-site training and system handover to Client for the scope mentioned above only HELIOS

XVI MISCELLANEOUS
1 Fire Extinguishers and Electrical Safety Items CLIENT

XVII OPERATION AND MAINTENANCE


1 As per project O&M Terms HELIOS

5. DISCLAIMER
1. This Proposal document is not an agreement by the Helios Natural Renewtech P L to the prospective
clients or any other party. The purpose of this Proposal is to provide interested parties with an offer
based on defined and assumed requirements. The entire offer is subject to change related to any change
in the scope of work or terms of contract. This Proposal is based on material and information available
in public domain.

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar
2. This Proposal, along with its Formats, is not transferable. The Proposal and the information contained
therein are to be used only by the person to whom it is issued. The information of Proposal shall not be
copied or distributed by the recipient to third parties.

3. While the Proposal has been prepared in good faith, no representation or warranty, express or implied,
is or will be made, and no responsibility or liability will be accepted by the Client, its employees or
advisors or agents as to or in relation to the accuracy or completeness of the Proposal.

4. The binding document between the client and Helios Natural Renewtech P L will be a defined EPC
contract/ material supply contract/ services contract document. Such a contract document will
supersede all previous documents and written / oral communication.

5. This Proposal includes certain statements, estimates and projections with respect to the anticipated
future performance of the Project. Such statements, estimates and projections reflect various
assumptions concerning anticipated results, which assumptions may or may not prove to be correct.
Neither the Client nor its employees or consultants make any representation or warranty with respect to
the accuracy of such statements, estimates and projections and actual performance of the Project nor
any opportunity, which may be materially different from that set forth in such statements, estimates and
projections.

6. Force Majeure: Our proposal is subject to force majeure clause. Helios Natural Renewtech P L will not
responsible for any delay or not supply of materials, implementation of projects, management or
providing any kind of services or related scope of work due to natural calamities, rain, cyclone, flood,
strike, riots, major accident, diseases, war or any other act/any events beyond control of Helios Natural
Renewtech P L. Thus our payment should not be stopped or delay.

7. Other Work: Any other work which is not covered under our scope of work/services or include in quote,
have to be done by the client with their own cost as directed by our representative in the stipulated time
in order to complete the work.

6. Bank Details:
Company Name: Helios Natural Renewtech Pvt. Ltd.
Account Number: 04570 500 3078
Bank Name: ICICI Bank
Branch Name: Thaltej, Ahmedabad
IFSC Code: ICIC0000457

7. JURISDICTION:
All disputes are subject to Gandhinagar Jurisdiction only.

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar
IMPORTANT TO NOTE: "This Helios Natural Renewtech P L’s offer is preliminary and not final and as such non-binding.
It is tendered for discussion only, does not constitute a term to contract and Helios Natural can, without notice, make
any change at Helios Natural’s own discretion."

Helios Natural
228-229,Shreedhar auram, Nr Shivalay Parisar, Kudasan, Gandhinagar

You might also like