sITE ACCEPTANCE TEST (SAT)

PLANT INTERFACING WORK (PIW) VCB - SHUTDOWN


TENAGA NASIONAL
Doc. No. SAT PIW - VCB Rev. No. 1 Date 5 June 2020

CONTRACT TITLE:

PLANT INTERFACING WORK (PIW) DI STESEN SUIS /PENCAWANG


ELEKTRIK 11kV VCB, UNTUK PROJEK DISTRIBUTION AUTOMATION
(SOUTHERN REGION), DISTRIBUTION NETWORK, TNB

CONTRACT NO. TNB 172 /2022


CONTRACTOR: AHM TECHNOLOGY SDN BHD

|DATE: •l|023
SUBSTATION NAME: PE tAmAN SAL MON SG BULON
FUNCTIONAL LOCATION :

sUBZONE:

STATE: SELAN GOR


6utoeticnllomaion)
NASIONAL
TENNGA
1/2
Pg Stamp:
2020
June
5 REMARK REMARK
REMARK
whiteBlace &
Sghature
3erna
/S/2d13
2Date:
requirement Representative

/Passed
("" RESULT
TEST
"-Passed
("
I "X"-Failed)
RESULT
TEST
(""-Passed
/
"X"-Failed)
Juruteknik NasIO
RESULT
TEST -Failed)
"X" DistribuName:na0a
station's Verified
by:
TNB's
Date to
LO4 according
PANEL
SG
SG SG
PANEL
SGPANEL
SG PANEL
PANEL SG SG SGPANEL
PANEL SG PANEL
SG PANEL
PANEL SGPANEL
SG SG PANEL
SG SG
PANEL PANEL
SG SG SG PANEL
SG SG
PANEL
PANEL
PANEL PANEL
SG
PANEL
SG
PANEL SG SG
PANEL
PANEL SG PANELPANEL
SG
PANEL PANEL
SG
RCBRCBRCBRCB
6u add/editTO
TO TO

SG Please FROM ASMADI


LUMPLR
2JELAIEK
RCBRCBRCBRCBRCBRCB RCBRCBRCBRCBRCB FROM RCB RCBRCBRCB RCBRCBRCBRCB EFI EFI EFI (1091985-V22%ait.com
YAN FROM
SPLmoN RCB RCERCBRCB RCE RCB RCEB RCB

SHUTDOWN *Note:
CONVENTIONAL) KUALA
MA alarm
General
Spare/Relay K JALAN
Sheet. SHEET
Tests. cables) BINTI
ENGINEER
PROJECI
Supervision
Circuit
Trip cables) cables) BHD. 54200
880
(SAT) kS Remote
/Supervisory Email:
sates.dntechnofogy
-VCB Continuity
Test TEST Close
Switch
OpenEarth
Switch
Earth Fail
Relay
Internal SIGNAL SIGNAL HUSNA N08.
Control SIGNAL
TEST
Rev.
No.
Continuity (Analog signal Indication
EFI CO-Common SDN
TECHNOLOGY
(PIW) (RCB MAN SARAYA
CONTINUITY Close
OpenControl
Control Ind-Common Current
Over
Earth
Fault Voltage+
+
MWatt -MVar(EFl Common EFI
Reset AHMsPARK.
ACCEPTANCE Termination & Common
nd-Close
Ind-Open Common
Common Voltage +
MVar
MWatt SHAHIRAH
WORK (Alarm Spare
Spare Sparearmoured Amp-Amp
+ non-armoured Stamp
TEST Termination WISML
TA BUSINE
SAT CONTINUITY TERMINATION armoured
INTERFACING
-VCB
PIW NO.
CORE NO.
CORE &
Cable CORE
NO. 13 sq, 2 Signature
[1] PE PA NOOR LEVEL
2, JELATEK
SITE Point-to-point 7
mm AHM
in sq, 1.5 sq, Observations:
Test
results
TERMINATION mm Contractor's
PLANT : mm twisted,NO.
CABLE NO.
CABLE Tested
by:
test No.: Name 1.5
Feeder CABLE
NO.
1.0
EFI1EFI1EFI1EFI1
PE
Name: Name:
1B 1B B 1B 1C 1C 1C cores,
Conduct Feedercores, 1A 1A 1A IA 1A TA 1A
Doc.
No. 1A 1A C
Record [1]
1A 1A A A |A A 2-pair, Date:

A1. 19
1. 2.
OHDZLLA
TENAGA
NASIONAL
1/2
Pg
Stamp:
2020
June REMARK REMARK REMARK
Blace
White &
MLHAAMAD
FAAMP
5

requirement
Signétur
matig+
Representative
RESULT
TEST
/(""-
Passed (""-Passed
/
TEST
RESULT (""-
Passed
/
RESULT
X"-Failed) "X"
-Failed) "X"
-Failed)
station's Verified
by:
TEST TNB's Name:
Date:
Date to
BuLOA according
SG
PANEL
SG
PANEL
SG SG SG
PANEL
PANEL
PANEL PANEL
SG SG SG
PANEL
PANEL
PANEL SG
PANEL
SG SG
PANEL SG
PANEL
PANEL SG
PANEL
SG SG SG
PANEL
PANEL SG
PANEL
PANEL SG
PANEL SG SG
PANEL
PANEL SG SG
PANEL SG
PANEL
PANEL PANEL
SG SG
PANEL
SG
PANEL
TO TO TO
RCBRCBRCBRCB
add/edit SG

Please FROM FROM LUMPLR


JELATEK2
RCBRCBRCBRCBRCBRCBRCBRCBRCBRCB RCBRCBRCBRCBRCBRCBRCBRCB RCB FROM RCBRCB RCBRCBRCBRCBRCB RCB EFI EFI EFI EFI ASMADI
(109t985-V
1 Email:
sales
anmtechnology@gmait.com
SHUTDOWN ALmON*Note:
CONVENTIONAL) KUALA
Sheet.SHEET alarm
General
Spare/Relay K JALAN
Tests. cables) HUSNABNTI
Supervision
Circuit
Trip cables) cables) PROJEC
ENGINEER
BHD. 54200
J3-425T
T880
(SAT) Test
Continuity Remote
Supervisory
/
- SIGNAL SIGNAL
VCB Rev.
No. TEST
Control
SIGNAL OpenSwitch
Close
Earth
Earth
Switch Fail
Internal
Relay 8
TEST Continuity (Analog signal Indication
EFI CO-Common SDNNO
(PIW) (RCB CONTINUITY Control
OpenControl
Close
Ind-Common Current
Over PARK.
ACCEPTANCE Termination MAN & Common
Ind-Open
Ind-Close CommonCommon
Earth
Fault Voltage
+t -Voltage Common EFI Reset 0GYAHM,
WORK (Alarm +
MWatt +
MWar (EFI
MWatt SHAHIRAH
TEST Termination armoured
SpareSpareSpare +
Amp
Amp MVar Stamp:
non-armoured JEtATEKBUSINEBs
WISMA
INTERFACING
-VCBCONTINUITY TA armoured TECHN
Cable TERMINATION CORE
NO. CORE
NO. CORE
NO.
13 sq, &
SITE SAT
PIW [1] mm Signature
NOOR 2,
Point-to-point
in
PE 2 AHM LEVEL
results sq, sq, Observations:
Test
TERMINATION 1.5
PLANT mm twisted, mm
Record
2.test No.: Feeder
Name
:
Feeder CABLE
NO. CABLE
NO. CABLE
NO. Contractor's
PE
Name: 1.5 1.0 Tested
by:
Doc.
No. Conduct 1A 1A 1B 1B 1B 1C 1C 1C 1C cores,
EFI1EFI1EFI1EFI1
1] cores, 1A 1A 1A 1A 1A 1A 1A 1A 1A 1A A 1A IA 1A A
2-pair, B
Name:
Date:
A1. 1. 19 4
SITE ACCEPTANCE TEST (SAT)
PLANT INTERFACING WORK (PIW) VCB -SHUTDOWN
TENAGA NASIONAL
Doc. No. SAT PIW -VCB Rev. No. Date 5 June 2020

|A1. TERMINATION CONTINUITY TEST (RCB CONVENTIONAL)

1. Conduct Point-to-point Cable Termination Continuity Tests.


|2. Record test results in (1)] Termination Continuity Test Sheet.

[1] TERMINATION CONTINUITY TEST SHEET Pg 1/2

PE Name:
PE tPAN SALM0N
Feeder No..
Feeder Name: / E TA mAN PARL
19 cores, 1.5 mm sg, armoured (Alarm & Control cables) Note: Please addledit according to station's requirement
TEST RESULT
("Passed / REMARK
CABLE NO. CORE NO. SIGNAL FROM TO
"X"-Failed)
RCB SG PANEL
14 |Common
1A Control Open RCB SG PANEL
Control Close RCB SG PANEL
1A
SG PANEL /
1A Ind-Cormmon RCB
RCB SG PANEL /
1A Ind-Open
A Ind-Close RCB SG PANEL
RCB SG PANEL
1A Earth Switch Open
Earth Switch Close RCB SG PANEL
1A
RCB SG PANEL
Common
Supervisory / Remote RCE SG PANEL
RCB SG PANEL
Common
RCB SG PANEL
1A Over Current
RCB SG PANEL
1A Earth Fault
RCEB SG PANEL
|Internal Relay Fail
Trip Circuit Supervision RCB SG PANEL
1A
|Spare/Relay General alarm RCB SG PANEL
A
RCE SG PANEL
1A Spare
RCE SG PANEL
1A Spare
RCB SG PANEL
1A Spare
cables)
2-pair, twisted, 1.5 mm sg, armoured (Analog
TEST RESULT
REMARK
CABLE NO. CORE NO. SIGNAL FROM TO (""-Passed /
"X" -Failed)

1E Amp + RCB SG PANEL hit


1B |Amp RCB sG PANEL Blaut
RCB SG PANEL
1 Voltage +
RCB SG PANEL
1B Voltage
RCB SG PANEL
MWatt +
RCB SG PANEL
MWatt -
MVar + RCB SG PANEL
1C
RCB SG PANEL
1C MVar
4cores, 1.0 mm sq, non-armoured (EFlsignal cables)
TEST RESULT
FROM TO (""-Passed | REMARK
CABLE NO. CORE NO. sIGNAL
"X" -Failed)
Common EF RCB
EFI1
EFI RCB
EFI1 EFIIndication
EFI RCB
EFI1 CO-Common
EFI Reset EFI RCB
EFI1
Test Observations:

Verified by:
Tested by: TNB's Representative Signatre &Stamp:
Contractor's Signature & Stamp:

NOORSHAHIRAH HäSNABINTI KASMADI


PROJEC ENGINEER
AHM TECHNOLOGY SDN BHD
41091985-4
ttvEt 2, WISA4 4HM, NOE. IALAN Name:or Nec
Name: JELATEK 2
Date:
JELATEKBUSttNESS PARK, S4200KUALA LUMPLR Date: asa NasC

Email: saté.3nmtechnology@gmait.com
TENAGA
NASIONAL
2/2
Pg
FAZLLAH
(Distribu/orAutomalon)
T/JurutBiaesaknik
5June
2020 REMARK REMARK REMARK
stamp:OHD

Se)Automation
Distribution
& 28/5/2023
(""Passed
/ X"-Failed)
Signature Network
Distribution
Nastonar
S
RESULT
TEST Passed
/(""-
RESULT
TEST X"Failed) (""
Passed
/ "X"-Failed)
TEST
RESULT

/ Representative enaga
Date

Verified
by:
TO BC BC BC BC TO RCBRCB RCBRCB RCBRCB RCB RCB TO RCB RCB |TNB's
Name:Date:
BULO 9llelel
Charger
FROM FROM FROM
CONVENTIONAL) DB DB DB DB BC BC BC BC BC BC BC BC BC BC
1 Battery NOOR
SHAHIRAH LUMPLR
HUSNABNTIkASMADI
JALAAHELATEK}
SHUTDOWN Sheet. S&
Tests. (1091985-V 5teehnology@gmail.com
SHEET alarms)

(SAT)
-
VCB Rev.
No. (RCB
Continuity
Test
Continuity
SALMON
for
TEST cable
SIGNAL
Charger
SIGNAL Charger
1
Alarm
2
Alarm
Charger
FAL
Spere
Ac
Spare
lomn
SIGNAL PROJECT
NGINEER
sR}ShI80
Email:
KUALA

TEST AC
CONTINUITY 8HD.
(PIW) Termination Cable) 54200
-armoured) (Battery NO&
ACCEPTANCE TEST Termination Neutral Spare
Common Common
BatterySpareSpare Battery
|-30VDC
+30VDC SDN.
WORK
CONTINUITY
TMN Line Earth (DC Stamp: AHMPARK.
TECHNOLOGY
Cable TERMINATION armoured armoured
INTERFACING
VCB (coloured CORE
NO. CORE
NO.
CORE
No. JELATEK[BUSINESS
-PIW [1]
Point-to-point RED BLUEYELLOW
BLACK RED
BLACK &
Signature WISMA
SITE in PE 2
results sq, sq, Observations:
Test
SAT TERMINATION sq mm 2,
PLANT mm AHM
mm
NO. R-BC1
CB R-BC1 Contractor'sLEVEL
test
PE
Name:
CABLE
NO.
AC-BC1
AC-BC1 1.5 NO.
AC-BC1
AC-BC1
CABLE 2.5 CABLE CB
Tested
by:
Doc.
No. Conduct
Record 4
cores, cores, BC1 BC1 BC1 BC1 BC2 BC2 BC2 BC2 cores,
Name:Date:
A1. 1. 2. 4 4 2
3. 2. |1.
|Name:
Date:
Contractor'Tested
s by: Observations:
|Test Position
BreakerLIR 2. 1. 0v. iii. Conditions:
i.
The The
i. Test
RecordConduct
This
|A2.
Test Test To The RCB
Local/Remote
REMOTE
REMOTE connectbreaker test Earth RCBNo: RCBbrand:
type: RCB Name:PE
test Doc.No.
Bt4251Je7 TELATEKLEVEL LOCAL LOCAL Conducted REMOTE LOCALPositionBreaker Conducted CONTROL

.atnmtechneogy@gmai.com
Email
SHAHIRAH
AttHUSEU
A NOOR
conducted Switch
is [21 test is RCB
2, Signature 30Test applicable
results
Control
TECHACL
WISMA at at
Vdc
is OPERATION
PLANT
Plug at in
the the supply
PROJE Stmp:
&
RCB Switchgear: is
with ON PleasePlease
whichever
choose
TRIASAPE RCB
[2] for
Operation PIW-
VCBSAT
INTERFACING
DARK AHM OGY inserted position
the
RCB both
TRIP
for SITE
tick CONTROL
breaker
TRmAN Test RCB
N08. SDN.
Trip/Close
Breaker
Switch status
INTERLOCK
Interlock ACCEPTANCE
S4200 BHD. Position
RCBRIS into (at "
SUPERVISORY
SUPERVISORY Sheet.
Conventional
indication "
REMOTE the at all whichever WORK
REMOTE
KUALAIALAN times)
half-racked OPERATION
switchgear Test.
(1091985-V
JELATEKKASMADI
TEST
change during (PIW)
LUMPLR CLOSE applicable:
applicable:
ALMoN and Rev.No TEST
cubicle in the VCB
at position INTERLOCK RCB (SAT)
2 RCB tests.
connector
Multi-pin. SHUTDOWN -
(from at
the
dry VOCB
SGTEST
Passed
"X"-Failed) ("v" - contact to
Result
Test activate 1/2/3|4 SHEET
TRIP swithgear B0LO
Trip/Close
Switch
RCB to
wet the
/
cubicle
contact)Control H
|Date: Name: Verified
TNB's by:
(Test Conventional
RCB
Operation.
Representative CLOSE Position)
X Date

TellaaNASIOibemadT/Biasr
NetyJuruteknik
Distributunork
FAZLABINMPHD
MUHAMMAD
FAZLLAH
lnbutionAoetion
2D/5/902
Signature

X
&
Stamp:
Passed
("v"- /
"X" Result
Test 2020
June 5
/
Failed) -
Womation) Multi-pin
RCB
NASIONAL
TENAGA
sales.3hmtechnology@gmal.com Emait:
188003-4251 TEL
LUMPLR KUALA 54200 PARK.8USINESs JELATEK
LEVEL2
23/5/23
JELATEK2 JALAN NO
8. AHM, WISMA Date:
Date: (1091935-V PCANOLOGY
BHD. SDN. SignAHRA
Stamp: Signature& ENGINEER PROJÉC Narme:
BIATLKASMáJ
Name: SHAHRAHSNA NOOR Stamp: Signature&Contractor's
by:Tested
Stamp: Slgnature
Representative
& TNB's
Verified
by: THE THATCONFIRM TO THIS
IS
ACCORDING CARRIED
QUT BEEN HAVE TESTS ABOVE
PROCEDURES. INJECTION
TEST TESTPRIMARY TO 20mA) 12- reading
(.e Positive
4-12mA) (Lreading
e Negative
90 270° 180- 90 270 180" 90 MVAR
90" 270- 180" 180 90 270" 180 90" 270" 180" 900 270° 180° 20mA) 12- reading
(.e Positive
270" 180 90 270- 180" 90- 270" 180" 90 270
Negative
4-12mA) reading
(i.e
180 90 270" 180 90" 270" 180 90 270" 180" 90 MWATT
270180-| 90 270 180- 90 270" 180" 90 270 180 90 270. 180" 90 270 180" 90 270" (mA) 100%
(mA) 50%
VOLTAGE
(mA) Point Star
Position Test
R-B R-Y Y-B R-B R-Y Y-B R-B R-Y Y-B R-B R-Y Y-B R-B R-Y RATIO) (CT AMPS
R-B R-Y R-Y Y-B R-B R-Y Y-B R-B R-Y Y-B R-B R-Y Y-B
Y-B Y-B R-B
ANALOG
reset EFI
Close
Open
CONTROL
DO) (
Switch Earth
Close
Open
STATUS
DI) (
On/Off EFI
AlarmCharging Stadon
Fail
Supervision Cìrcuit Trip AC
Fail Relay Internal
Fault Earth
Overcurrent
Remote/Supervisory
So1368 s0135 SO1356 (DALARM
I)
FEEDER
REMARK
SHEET INJECTION
TEST PRIMARY 3)

tests. the out cary Work)


to Statement
of Contract's Procedures
(in TestInjection TestPrimary Refer
to 0v.
contact). wet contact
to dry (fromn RCB change
at indication status Supply
for Vdc Connect
30 To|I.
Operation. Control activate
the connector
to cubicleswitchgear the intoinserted Plisug Testbreaker The i.
Position) (Test cubicle swithgear VCB theposition
at half-racked in breaker
at the conducted
with test
is Ihe
Conditions: Test
nanme: PE
SHEET TEST
INJECTION PRIMARY 3)

Sheet. Test
Injection Pnmary Po[3) results
n
in testRecord .
supervision. Chargeman BO
under
Commissioning
Test Modification
and Plant
after 300A to rated
up cable power for 600A Modification)
to up Plant (after Test
Injection Primary |Cary
Out
INJECTION
TEST PRIMARY A3.
2020 June 5 Date No. Rev. -VCB PIW SAT No. Doc.
NASIONAL TENAGA
SHUTDOWN VCB- (PIW) INTERFACING
WORK PLANT
(SAT)ACCEPTANCE
TEST SITE
3 2
Üüjian:
No.
1
4

RDIP Bowdens |Jalankan |Ukurkan


terpasangrintangan
pada |CT Adakah |Adakahdengan
EF|=(230V)
Bacaan
bateri baik? Test NO. JENISEFIPENCAWANG
SIRI LITAR
tandakan
(silatandakan Gunakan
NO |injection
pada TENAGA
rujuk contact
tersambung
Kelip. NASIONAL
BERNAD
NoINCöÜaKeABN NCoUT
oNBi bacaan terdapat
0 buzzer pada
secondary
Current
ujian EFI.
Lampiran = 1 Adakah
SUIS kedudukan
= relay TERPASANG
kedudukan CT Adakah
5 4 3 2BitNOANCQUT voltan
(SCADA dan mengguna kedudukan betul?
1 6 4 3 2 1 12 1 10 9 8 7
6 5 2 1 LV
T(ÀTAS)ING terminal
pada pada EFI
SENARAI
4 SUPPLY
untuk probe CT <3.0V
bit bit EFI?
berfungsi
output) yang
definisi pada pada pada
set
SEMAK
DIP DIP
setiap
suis suis
bit) pada pada |204 2.|ke Stmndby
3.2y
ncoming::0utgoing DAN
::QUT: :INCOMING :INCOMING
:INCOMING
NCROLL
OFF ON
k UJIAN

EFI
S2 DIP SUIS
S1 DIP 204 | Stondby O722 UNTUK
SUIS
826343739
dalam|Nota: Sila Lakukan
bit External
6&7kanUntuk semak
PROJEK
SCADA
output
|wayar |Ada lilitan
Satu Jika
continuity 20-300untuk
lihat bacaan
i(B WAH)MNOÖUT^ÜIs DI jenama
Lampiran test OUTGOING
oUTGOING OUTGOING
adalah menyemak DA
KedudukanNOQUT atau <3.0V
Cabletroll
dan
jika
4 5 4 2
arus kurang
Indicator
reset RECOMMISSION /
jalankan 2 bateri
penyambungan bagi
sebanyak pada
dari
contoh perlu 2310, 037228264794
curent 100Q
ditukar jika
EFI
KOMEN TROLLNOR
10A (Cabletroll
pemasangan tersebut.
injection. CT tiada
ke
terminal LV
&
Endau) dipasang, Untuk
Perlu CT
/2.4ka EFI;yang EFI
keluarkan bacaan endau
perlu
(EMG) betul:
OFF
NoÜjianSR
3 2 1
6 4
|Ukurkan |Adakah dengan Test
|Adakah NO. JENISEFIPENCAWANG
TERPASANG
SIRI LITAR
Jalankan
injection
Bowdens CTpada
terpasang Bacaan(230V)
(silatandakan Gunakan
tandakan NO TENAGA
contact Kelip. NASIONAL
BERHAD
rujuk
T(ATAS)INCOUTRDIPSUS tersambung
bateri terdapat baik?
bacaan
pada ujian rintangan
Lampiran 0 1 buzzer
= = relay
pada EFI.
kedudukan
betul? Adakah
kedudukan
kedudukan secondaryCT Adakah voltan
EF|
Bit Bit LV
6 5 4 3 2 1
NoINCOÜTL
NoINGÖUT 4 3 2 1 12 11 9 8 7 3 2

4
(SCADA dan mengguna pada =
SUPPLY
pada EFI SENARAI
untuk probe <3.0V 3V
CT
terminal berfungsi
bit bit output) current
yang EFI?
definisi pada pada pada
set SEMAK
DIP DIP
setiap
suis suis 3.2VStndby
Incoming.oütgoing
EKOMEN
bit) pada pada
(20A 2)k :INCOMING :INCOMING :PE
:NORTROLL
INCOMING
DAN

OFF ON UJIAN

1A EFI
|204 2.lks Sdrndby
3.0v Y722|26iol UNTUK
s2 DIP SUIS
s1 DIP
m¡v

output |Ada
SCADA
wayar lilitan
Satu dalam|Nota: lihat
|Sila Jika kanUntuk
lIndicator
External
semak
Lakukan SALmON PROJEK
continuity bacaan bit al
20-300untuk jenama
DIP ABit 6
test
OUTGOING
SÚIS
Lampiran
adalah menyemak
atau <3.OV
&7
dan
NOKTRL
OUTGOING
oUTGOING DA
/
5 3 2 5 4 2 5 4 3 4 3 2 1 jika Cabletroll
reset
RECOMMISSION
(BAWAH) 1 jalankan
sebanyak
arus
10A kurang
2 bateri S&
penyambungan bagi pada
dari
contoh perlu 2310, Og7228240[4l BuLOH
current 100Q EFI
ditukar jika
(Cab
pemasangan tersebut.
Cabletroll CT tiada
PINCOUT injection.
ke
INC terminal LV
& Untuk
EndauU) dipasang,
Perlu CT
EFI; EFI
/2.4kQ yang
ÖUT keluarkan bacaan perlu endau
a
(EMG) betul:
OFF
ENGR-750-12-WI-11-Borang01

TENAGA
NASIONAL BERHAD
Nama Aktiviti: PENGUJIAN MULATUGAS SISTEM
30VDC LOW MAINTENANCE
Pencawang :BERKA ÎNSAR/EBOO-30-0uL
Tarikh Mulatugas
:PE T MAN SA LMON Syehama cager Imodel
Bilangan Charger 18irl2023 Serial no charger
Bulan/Tahun Penghantaran
Kegunaan DC :APRIL 023
:VCB/ RMU / RTUIFTU Jenama bateri / model : SAFT UPIMo-4
Jika VCB, Bilangan VCB: 3 Bulan/Tahun Pembuatan : DECEM BER 022
Aktiviti
Keterangan Aktivti
Tandakan ()
1
Pastikan sistem DC telah siap dipasang kecuali kabel dari pengecas ke bateri &pengecas ke beban.
2 Pastikan semua MCB pada pengecas bateri dalam keadaan terbuka (0FF).
Aktiviti Ujian Julat Bacaan AmbilBacaan

3
|Semak bacaan Voltan pembekal masuk AC (L-N) 216 - 252 Vac 230 Vac
pada terminal blok pengecas bateri.
Jika julat vltan AC tidak dipatuhi, maklumkan kejanggalan kepada pihak yang terlibat bagi tujuan pembaikan.
Aktiviti Keterangan Aktivti Tandakan ()
Pastikan Suis Mode berada dalam kedudukan Manual. Hidupkan (0N) MCB AC, Bateri &Beban.
Aktiviti Julat Bacaan Ambill Bacaan
Ujian
5 Pastikan LED Manual Float menyala. Ukur voltan pada 27 -31.5 Vdc (terminal +ve ke -ve) 33. 2 Vdc
terminal blok ke beban.

6
Pusingkan suis ke boost. Pastikan LED Manual Boost 27-31.5 Vdc (terminal +ve ke -ve) 32.4 Vdc
menyala. Ukur voltan pada terminal blok ke beban.
Jika julat voltan untuk Float atau Boost tidak dipatuhi, matikan (OFF) semua MCB.
Laporkan dalam Sistem Maklumbalas Bahan(SMB) &hubungi pihak pembekal untuk pembaikan segera ditapak.
Aktiviti Keterangan Aktivti Tandakan ()
7 Pusing semula suis ke Float. Pastikan LED Manual Float menyala.
l) Ambil bacaan Voltan Pengecas Bateri pada terminal blok ke bateri &rekodkan
pada pelekat mulatugas pada pintu pengecas.
ü) Rekod Bacaan Suhu pada paparan LCD pada pelekat mulatugas pada pintu
TEMPERATURE COMPENSATION pengecas.
8
(FLOAT CHARGE MODE) ii) Rujuk Jadual Temperature Compensation pada pintu perngecas &rekodkan
voltan Float Min &Max pada pelekat mulatugas pada pintu pengecas
iv)Adakah Voltan Float dalam julat voltan float Min &Max? Ya () atau Tidak (x)
Aktiviti Keterangan Aktivti Tandakan ()
9 Pusingkan suis ke boost. Pastikan LED Manual Boost menyala.
Ji)Ambil bacaan Voltan Pengecas Bateri pada terminal blok ke bateri &rekodkan
pada pelekat mulatugas pada pintu pengecas.
li) Rekod Bacaan Suhu pada paparan LCD pada pelekat mulatugas pada pintu
TEMPERATURE COMPENSATION pengecas.
10
(BOOST CHARGE MODE) li) Rujuk Jadual Temperature Compensation padapintu pengecas &rekodkan
voltan Boost Min &Max pada pelekat mulatugas pada pintu pengecas. /

ivJAdakah Voltan Float dalam julat voltan boost Min &Max ? Ya (V) atau Tidak (%)
Jika julat voltan untuk Float atau Boost pada no 8(iv) &10(v)untuk
tidakpembaikan
dipatuhi, laporkan dalam Sistem Maklumbalas Bahan(SMB) &hubungi pihak pembekal
segera ditapak.
Aktiviti Keterangan Aktivti Tandakan ()
11 Matikan (OFF) MCB pada pengecas bateri ke bateri &beban.
12 |Lengkapkansambungan kabel dari pengecas ke bateri&pengecas ke beban.
13 |Hidupkan (ON) semula MCB pada pengecas bateri ke bateri &beban
14 Pusina Suis Charger Selector Mode ke Manual &Boost. Pusing semula ke Auto. Pastikan LED Charger Auto Boost menvala.
Pengecas akan bertukar ke Float secara Otomatik selepas 12 Jam.

Diuji oleh: Disahkan oleh:


Tarikh : NOOR SHAHÌRAY HUSNA BINTI KASMADI Tarikh
| FNGINEER
DROJECTF
Analisa/Catatan NLGY SDN RHD 1091985-y
Keputusan i NObALANIEATEK 2
JELAIEK F SINE, ARk, 54200 KUAIAIUMPLR
Perlu Tindakan Lanjutan t -4251 MAS TIDAK
Tindakan olmail: salE.ahmtechnology@gmail.com

Tarikh
ENGR-750-18-WI-11 Borang01

STATE:
PRIMARY INJECTION TEST SHEET
SUBSTATION
CIRCUIT PE TAhAN SLNO N eB0L0 CB NO.
Feeder Name PASARAyA kEmAYAN UST MAINTENANCE DATE (4`eke')

RELAY DETAILS
MAKE
TYPE CT RATED CURRENT( SECONDARY) 1A 6A
CT RATIO PHASE (PRIMARY
SERIAL NO, RATIO (PRIMAF
OPERATED
lo2287912/O85 Not applicable for Seada DA NIA

Untuk projek DA - Current Operated sahaja CURRENY VOLTAGE

COMMISsIONING MAINTENANCE INVESTIGATION I REPAIR


Mulatugas Fasliti DA oleh Prolek DA

CT TERMINATION(V) Perlu senak connection CT Teminal Block. Perlu rujuk PIC Protection di tapak.
S1 S $3

TEST RESULT:

RELAY SETTING METER READING (A)


PHASE INJECTION Aunbil data pada Sticker Relay PRIMARY CURRENT SECONDARY Bacaan dia1bil pada
PHASE
(A) CURRENT (A) bahagian hedapan
PS TMS
Relay
254
R-Y
0. ! 300 25A 200

7.7 mA
24 A
Y-B
0. 300 B 2.5 A
E

B-R
50 0.! 300 2,5 303
R

R-E
0.2 60
A
Y-E
60 m A
E A

B-E
B

TEAM
TESTED BY CHECKED BY
POSITION POSITION
DATE DATE
SUHAIRIMUSTAFFA
JURUTEKNIK 70027 2?/s/23
UNIT PERLINDUNGAN
TNB SELANGOR
VERIFIED BY
Nota:
Tested by Cantractor DA
POSITION
Checked by Team DA
DATE Vertfled by PIC Protection

ANALYSIS/REMARKS:

RESULT PASS / FAIL by PIC Protetlon

REQUIRES FURTHER ACTION: YES I No

ACTION BY
DATE
NSAL DERNAD STATE:
ENGR-750-18-W1-11 Borang0t

PRIMARY INJECTION TEST SHEET3ELANGOR


SUBSTATION
CIRCUIT CB NO.
Feeder Name Tx AST MANTENANCE DATE lulcker)
RELAY DETAILS
MAKE
TYPE IKFMSS
SERIAL NO. CT RATED CURRENT( SECONDARY)
CT RATIO PHASE (PRIMARY) 1A 5A )

OPERATED
Untuk projek DA -Current Operated sahaja
Vo2987801/
L CURRENT/VOLTAGE
NCT RATIO (PRIMARY)
Not applicable for Scada DA
NIE

COMMISSlONING
MAINTENANCE
Mulatugas Fasiliti DA oleh Projek DA INVESTIGATION I REPAIR

CT TERMINATION N)
S1 JPerlu sennak connection CT Terminal Block. Perlu ruiuk PIC
Protection di tapak.

TEST RESULT:

RELAY SETTING METER READING (A)


PHASE INJECTION Ainbil data pada Sticker Relay PRIMARY CURRENT SECONDARY
A
PHASE Bacaan diambil pada
CURRENT (A) bahagian hadapan
PS ( . TMS
Relay
27 A
R -Y 2 A
ISo
(Go) 2-7 mA
R

Y -B 2 1S1
2.5 IS3
E

B-R

(Go) 152
EF Lo.7

R-E 2mA

A 33
31
R
Y mA
B-E
30 B 33
EF

TEAM
TESTED BY CHECKED BY
POSITION POSITION
DATE DATE
SUHAIRIMUSTAFFA
JURUTEKNIK 70027
UNIT PERLINDUNGAN 22/5773
TN8 SELANGOR
VERIFIED BY
Nota
Tested by Contractor DA
POSITION
Checked by Team DA
DATE Vetfed by PIC Pratection

ANALYSIS/REMARKS:

RESULT PASS I FAIL by PiC Pratectlun

REQUIRES FURTHER ACTION YES I NO

ACTION BY
DATE
ENGR-750-18-WI-11 Borang01

ZGSNAL BERNo STATE: JELANGrOR


PRIMARYINJECTION TEST SHEET
SUBSTATION PE TAOAN SAL MON CB NO.
CIRCUIT UST MAJNTENANCE DATE (L5cker)
Feeder Name PE TAmAN PAR
RELAY DETAILS
1A/6A )
MAKE STEMENS CT RATED CURRENT (SECONDARY) 600
TYPE CT RATIO PHASE (PRIMARY)
NCT RATIO (PRIMARY)
SERIAL NO,
Not appllcable for Scada DA NIA
OPERATED CURRENTI VOLTAGE
Untuk projek DA -Current Operated sahgja
INVESTIGATION REPAIR
COMMISsIONING MAINTENANCE
Mulatugas Fasilid DA oleh Projek DA

JPerlu semak connection CT Terminal Block. Perlu rujuk PIC Protection di tapak.
CT TERMINATION(V)
S1 S2

TEST RESULT:
METER READING (A)
RELAY SETTING SECONDARY Bacaan diambil pada
PRIMARYYCURRENT
CUI PHASE bahagian hadapan
PHASE INJECTION Anbil data pada Sticker Relay CURRENT (A)
(A)
Relay
PS TMS
15

R B

R
Y 303
Y -B Jo0
B.Om
R 25 303
Y 2.5
B00
B -R
50 B
37
30

R-E

R 0 A
Y

Y-E B
E A
R

Y
B-E A

TEAM CHECKED BY
TESTED BY POSITION
POSITION DATE
DATE SUHAIRI MOSTAFFA
JURUTEKNIK 70027
UNIT PERLINDUNGAN 2(5
TNB SELANGOR
VERIFIED BY Nota
Tested by Contractor DA

POSITION Checked by Team DA


Veified by PIC Protection
DATE

ANALYSIS/REMARKS;

RESULT
PASS / FAIL by PIC Protection

REQUIRES FURTHER ACTION: YES / NO

ACTION BY
DATE