Substation Configuration Diagram M1
Substation Configuration Diagram M1
GIS CENTRAL
RELAY ROOM CONTROL ROOM
SCADA
0AYG01
RTU Panel CAB
PROTECTION &
IEC 61850 AUTOMATION ROOM
Modbus
=E03+CC1, 0AWE03 =E01+CC1, 0AWE01 =E02+CP1, 0ARE01 =E05+CP1, 1CHB05 =E03+CP1, 0CHB03
=E05+CC1, 0AWE05
=E04+CC1, 0AWE04 =E07+CC1, 0AWE07 =E07+CP1, 0ARE07 =E06+CP1, 2CHB06 =E04+CP1, 0CHB04
=E06+CC1. 0AWE06 =E02+CC1, 0AWE02 =E00+CP1, 0ARE02
Control Panel Control Panel Prot. Panel Prot. Panel Prot. Panel
Control Panel Control Panel Prot. Panel
87L,
79, 25
87T, REF 87T, REF
27, 59 87BB
ABB, REB670
ABB, RET670
50/51, AVR
50N/51N
50/51, 50/51, 50/51, 50/51, Tariff (UAT)
50N/51N 50N/51N 50N/51N 50N/51N Meter ABB, REB670 ABB, REF615 ABB, REU615
50BF, 25 50BF 50BF, 25 50BF, 25 Schneider,
ION
ABB, REF615 ABB, REF615 ABB, REF615 ABB, REF615
FO to
2 x 150kV OHTL 150kV Bus Coupler remote 2 x 150kV OHTL 150kV Busbars 2 x 150/15kV GSUT 2 x 150/6.3kV SST
2 x 150/15kV GSUT 2 x 150/6.3kV SST relay
1BAT10 & 2BAT10 0AET10 & 0AET20 OHTL1 & OHTL2 COUPLER OHTL1 & OHTL2 BUSBAR PROT 1BAT10 & 2BAT10 0AET10 & 0AET20
Title Project
Customer GIS BABELAN 150KV
150 KV GIS BABELAN
M1
M0
Rev.
As commented
For approval
Revision note
24.03.16
07.10.14
Date
UA
UA
Name
PT Cikarang Listrindo ABB SUBSTATION CONFIGURATION DIAGRAM
Dwg. No.
BPS-0AE-28037 Sheet
01
N.Sheet
-