You are on page 1of 59

BPBD PROVINSI KALIMANTAN SELATAN

BADAN PENANGGULANGAN BENCANA DAERAH


JL. BANGUNPRAJA NO.2 PALAM, CEMPAKA BANJARBARU, KALIMANTAN SELATAN 70732

PEKERJAAN : PERENCANAAN GEDUNG LOGISTIK BPBD KALIMANTAN SELATAN

DETAILED ENGINEERING DESIGN by :

FOR CONSTRUCTION ONLY


BPBD PROVINSI KALIMANTAN SELATAN
BADAN PENANGGULANGAN BENCANA DAERAH JL. BANGUNPRAJA NO.2 PALAM, CEMPAKA BANJARBARU, KALIMANTAN SELATAN 70732

PEKERJAAN : PERENCANAAN GEDUNG LOGISTIK BPBD KALIMANTAN SELATAN


SHEET LIST SHEET LIST SHEET LIST SHEET LIST
SHEET TITLE SHEET NUMBER SHEET TITLE SHEET NUMBER SHEET TITLE SHEET NUMBER SHEET TITLE SHEET NUMBER
00-PROJECT INFORMATION 02-ARCHITECTURE TOILET PLAN - 3 ARC-7.03 04-STRUCTURE
COVER PI-1.01 SUB COVER ARC ARC-0.00 TOILET PLAN - 4 ARC-7.04 SUB COVER STR STR-0.00
SHEET LIST PI-1.02 SITEPLAN ARC-1.01 STAIRS PLAN - 1 ARC-8.01 ISOLATED FOUNDATION PLAN STR-1.01
SUN PATH ORIENTATION ARC-1.02 STAIRS PLAN - 2 ARC-8.02 ISOLATED FOUNDATION DETAIL-1 STR-1.02
LAYOUT PLAN ARC-1.03 STAIRS PLAN - 3 ARC-8.03 ISOLATED FOUNDATION DETAIL-2 STR-1.03
FLOOR PLAN ARC-1.04 STAIRS PLAN - 4 ARC-8.04 WALL FOUNDATION PLAN STR-1.04
ORTHOGONAL PLAN (1st-F) ARC-2.01 STAIRS PLAN - 5 ARC-8.05 FRAMING PLAN - 1 STR-2.01
ORTHOGONAL PLAN (2nd-F) ARC-2.02 STAIRS PLAN - 6 ARC-8.06 FRAMING PLAN - 2 STR-2.02
ORTHOGONAL VIEW ARC-2.03 03_M.E.P. COLUMNS PLAN STR-3.01
PERSPECTIVE VIEW ARC-2.04 SUB COVER MEP MEP-0.00 SLAB FLOOR PLAN STR-4.01
ELEVATIONS-1 ARC-3.01 ELECTRICAL PLAN MEP-1.01 SLAB FLOOR DETAIL - 1 STR-4.02
ELEVATIONS-2 ARC-3.02 PLUMBING PLAN - 1 MEP-2.01 SLAB FLOOR DETAIL - 2 STR-4.03
SECTIONS-1 ARC-4.01 PLUMBING PLAN - 2 MEP-2.02 ROOF PLAN STR-5.01
SECTIONS-2 ARC-4.02 PLUMBING PLAN - 3 MEP-2.03 ROOF DETAIL-1 STR-5.02
WINDOWS/DOORS PLAN - 1 ARC-5.01 PLUMBING PLAN - 4 MEP-2.04 ROOF DETAIL-2 STR-5.03
WINDOWS/DOORS PLAN - 2 ARC-5.02 PLUMBING PLAN - 5 MEP-2.05 ROOF DETAIL-3 STR-5.04
WINDOWS/DOORS DETAIL-1 ARC-5.03 PLUMBING PLAN - 6 MEP-2.06 STRUCTURE DETAIL - 1 STR-6.01
WINDOWS/DOORS DETAIL-2 ARC-5.04 PLUMBING PLAN - 7 MEP-2.07 STRUCTURE DETAIL - 2 STR-6.02
WINDOWS/DOORS DETAIL-3 ARC-5.05 PLUMBING PLAN - 8 MEP-2.08 05-ADMIN PROYEK
CEILING PLAN ARC-6.01 PLUMBING PLAN - 9 MEP-2.09 COVER EE AP-01
TOILET PLAN - 1 ARC-7.01 COVER SPEKTEK AP-02
TOILET PLAN - 2 ARC-7.02

DETAILED ENGINEERING DESIGN by :

FOR CONSTRUCTION ONLY


BPBD PROVINSI KALIMANTAN SELATAN
BADAN PENANGGULANGAN BENCANA DAERAH
JL. BANGUNPRAJA NO.2 PALAM, CEMPAKA BANJARBARU, KALIMANTAN SELATAN 70732

PEKERJAAN : PERENCANAAN GEDUNG LOGISTIK BPBD KALIMANTAN SELATAN

ARCHITECTURE
DETAILED ENGINEERING DESIGN by :

FOR CONSTRUCTION ONLY


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
ar
kelu LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN

LEGEND

KIR
PAR

UNG
GED
UNG
GED

KIR
S58) 8.711

MUSHOLA
8.7 m

S59) 8.667

PAR
B6) 9.153
M5) 8.914

M3) 9.079
M4) 8.919

M1) 9.058

8.8 m
M2) 9.016

S54) 8.904

uk
S57) 9.021

UNG
8.9 m

mas
S3) 10.644

GED
B1) 10.065

S52) 8.799
S53) 8.988
TEMPAT CUCI
MOBIL A2) 11.068

S4) 11.127

B2) 9.939
11.1 m

9m B3) 9.806
S56) 9.051 S5) 11.069 A1) 11.213

S55) 8.981

BM1) 10.000

AS) 11.237
11.2 m
9.1 m
S48) 9.484
9.2 m
PH4) 9.384

B4) 9.725
S2) 10.935
S51) 8.925 11.1 m

S6) 11.201

S50) 9.252
S49) 9.138
S38) 10.153

S7) 10.504

9.2 m

B5) 9.614

9.3 m S39) 9.763

S12) 10.247 S8) 10.502

S40) 9.549

9.4 m 11.2 m
S44) 9.186
S46) 9.098 11.1 m

S45) 9.110 TL) 9.173 10.7 m


11 m
S1) 11.523
S26) 10.220 11.3 m

9.5 m
S9) 10.867
10.6 m
S41) 9.283 10.4 m
10.3 m
10.5 m
10.9 m

KANTIN
10.8 m 11.5 m
S37) 10.264
S43) 9.178 S42) 9.247

11.5 m

11.4 m

S36) 9.961

S11) 10.906 11.5 m

11.5 m

S35) 9.805
S27) 9.969
PH3) 9.593
PH5) 9.737 S10) 11.469

11.5 m
9.7 m
9.6 m S28) 9.895
CP) 11.120
S34) 9.577

10 m
11.6 m

S33) 9.415

10.1 m 10.2 m 11.5 m


9.9 m 11.6 m
S32) 9.391
9.5 m

ASI
S29) 9.704

S25) 11.282 11.6 m


S24) 10.800
9.8 m
11.7 m

GAR
PH6) 9.958

S47) 12.001
11.2 m
PH2) 9.870

S23) 10.697

S30) 9.500 11.1 m

11 m

S22) 10.604
S13) 11.267

y6 1
PH7) 10.025 10.9 m

9506.6
PH8) 10.215

S31) 9.688

S15) 10.794
S14) 11.272

PLANNER CONSULTANT
10.7 m

N
10.8 m
800

S60) 9.717

S21) 10.552

10.7 m

O
n

S16) 10.599
ra

10.7 m
Salu

R
y4 S20) 10.038
S19) 1.033

10.5 m
T
PH1) 10.473
10.3 m
10.4 m

H TEAM LEADER, ARCHITECT,


1100

S17) 10.393

S18) 10.286
(ELDA SUSANTI, IAI)

y1 x1
DRAFTER,

2400
773.84

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

1000 ARCHITECTURE
x6
SHEET TITLE

SITEPLAN
SCALE : 1 : 600

SHEET NUMBER : ARC-1.01


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL
14:00 W
BANJARBARU, KALIMANTAN SELATAN

LEGEND

17:26

PLANNER CONSULTANT

5:43 TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

DRAFTER,
29 September
SUN PATH E
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

skala : ARCHITECTURE
SHEET TITLE

SUN PATH ORIENTATION


SCALE :

SHEET NUMBER : ARC-1.02


ARC-1.03
1 : 300
(ALFIAN NOOR)
(ELDA SUSANTI, IAI)
BANJARBARU, KALIMANTAN SELATAN
PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

ARCHITECT,
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN

BANJARBARU, KALIMANTAN SELATAN 70732


BPBD PROVINSI KALSEL

DRAFTER,
PROJECT INFORMATION

PLANNER CONSULTANT

(AR. INDRA BAYU, PYR, IAI)

ARCHITECTURE

LAYOUT PLAN
SHEET DICIPLINE
TEAM LEADER,

SHEET NUMBER :
LEGEND

SHEET TITLE

SCALE :
x6

x1

2400
B6)
8.9 9.153
m
M2)
9.0 16
S54)
8.9 04
M1)
9.0 58
S52)
PARKIR

8.7 99
S53)
8.9 88 S57)
9.0 21 -20
T EMP
AT C -25
UCI
MOB H
IL -30
T
GEDUNG
9m
-35 R
S55) O
8.9 81
S51)
8.9 25
9.2
m -40 N
PH4)
9.384 9.1
m S56)
9.0 51
-45
-50
S50)
9.2 52
-55 B1)
10.06
5
S48)
9.4 84
-60
S45)
9.1 10 TL) S49)
9.1 9.1
73 38
-65 B3)
9.806
B2)
9.939
9.2
m
S46)
9.0 98
-70 BM
1) 10.
000
9.3
S43) m
9.1 78
S44)
9.1 86
807.5 1592.5 385 B5)
9.614
B4)
9.725

-20
-25
S42) 9.4
m
9.2 47

-30
-35
-40
-45
-50
-55
PH3)

-60
9.593 S41)
9.2 83
-65
0
9.5
m
5 -7
-7
S40)
9.5 49
S39)
9.7 63 S38)
S32) 10.15
9.3 3
91
PH5)
9.737

y6
S33)
9.4 15
9.5
m
S7)
10.50
4
PH2)
9.8 70
49.54 / 1000 (2.84°) 41.96 / 1000 (2.40°) S12)
10.24
7
-1.30 m

-0.05 m

744.99

9.6
m
PH6) S34)
9.958 9.5 77
S8)
10.50
2
9.7
m
S31)
9.6 S35)
88 9.8
S30) 05
9.5 00
S29) S36)
9.7 9.9 61
04
S26)
10 .3 10.22
m 0
S60) PH7)
9.7 17 10.02 S37)
5 9.8 S28) 10.26
m 9.8 4
95
10 .4
+0.00 m

m
9.9
m

1900
S27)
9.9
Saluran

10 m 69 10 .5
m
10 .6 m
385 3163.5 S11)
10.90
6
10 .1
m
S9)
10.86
-35
7
10 .8
PH8) m
10.21
5
-30
10 .2
-100 m 3893.24
-95 5
-2
+0.00 m

-90
-85
-80 0 CP)
-2 11 .120
PH1)
10.47
3 -75 S20)
10.03 S19) 1.0
10 .3 8 33
m
-70 S24)
10.80S2
0 5) 11
S23) .28 2
S21) 10.69 11 .5
10.55 S22) 5 m
2 10.60 7
-65 4
-1

y1
11 .6 11 .6
m m 11 .6
m
11 .7
m
-60 10 .4 10 .7
10 .7
m
10 .9
m
11 m
11 .2
m
m S16) m 11 .1
10.59 10 m
10 .5 10 .7 9 .8 m
m m
-55
S17)
10.39 S15) 0
3 10.79 S47)
12.00
S18)
10.28
-50 S14)
4
11.27
2
S13)
11.26
7
-1 1
6
-45
-40
-35 -5
-30
-25
-20 0
-5
-10
-15
-15
1000 2400
x6

x1

LAYOUT PLANS
skala : 1 : 300
ARC-3.01
PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN

Y1 Y2 - Y1 Y2 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA


BANJARBARU, KALIMANTAN SELATAN 70732
ARC-4.02 ARC-4.02 --- ARC-4.02 ARC-4.02

1900
1100 PERENCANAAN GEDUNG
D y1 400 y2 y2'400 y3 150 y3' 150 y4 800 y6 B D LOGISTIK BPBD KAL-SEL
y1 800 y3 300 y4

x6 x6 x6 x6 BANJARBARU, KALIMANTAN SELATAN


WC-1 WC-2
210

2 m² 2 m² LEGEND
TOOL STORAGE

400

400
x5' Not Enclosed R. STAFF

49.54 / 1000 (2.84°)


(+0.00) 30 m²
(+0.00) (+4.00)

FOOD STORAGE x5 x5 WATERTANK

800
S-1.1

892.5
X2 -0.10 m X2
30 m²
UP
590

ARC-4.01 (+0.00) S-1.2 DECKROOF


ARC-4.01
x4'

CORRIDOR
(-0.37 m)

400

400
VOYER/LOBBY R. KEPALA
32 m² 11 m²
(+0.00) (+4.00) (+4.00)

x4 x4 x4 x4
DN

92.5
400
2400

x3 x3 x3 x3

X1 X1
ARC-4.01 ARC-4.01
600

LOGISTIC AREA TERRACE

1600
CONCRETE

1507.5
124 m² (+0.00)
-0.05 m
(+0.00)
FLOOR
x2 x2 x2 x2

PLANNER CONSULTANT
600

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


x1 x1 x1 x1
41.96 / 1000 (2.40°)

DRAFTER,

800 700 800 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

C A C SHEET DICIPLINE A
y1 y3 y5 y6 y1 y3 ARCHITECTURE
1st FLOOR PLAN 2nd FLOOR PLAN SHEET TITLE

FLOOR PLAN
ARC-3.01
skala : 1 : 130 ARC-3.01
skala : 1 : 130
SCALE : 1 : 130

SHEET NUMBER : ARC-1.04


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732
FOOD STORAGE
MAIN LOGISTIC AREA PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN

LEGEND

TOOLS STORAGE

TOILET AREA

LOBBY/VOYER

PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE

ORTHOGONAL PLAN (1st-F)


SHEET TITLE

ORTHOGONAL PLAN (1st-F)


skala :
SCALE :

SHEET NUMBER : ARC-2.01


PROJECT INFORMATION

OFFIXE AREA/STORAGE EXTENTION BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN

OFFICE AREA JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA


BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN

LEGEND

PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE

ORTHOGONAL PLAN (2nd-F) ORTHOGONAL PLAN (2nd-F)


skala : SCALE :

SHEET NUMBER : ARC-2.02


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN

LEGEND

PLANNER CONSULTANT

ORTHOGONAL VIEW TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


skala :
DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE

ORTHOGONAL VIEW
FRONT FACADE SCALE :

skala :
SHEET NUMBER : ARC-2.03
PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN

LEGEND

PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE
PERSPECTIVE SHEET TITLE
skala : PERSPECTIVE VIEW
SCALE :

SHEET NUMBER : ARC-2.04


PROJECT INFORMATION
945.59
TOP BPBD PROVINSI KALSEL
(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
800 BANJARBARU, KALIMANTAN SELATAN 70732
RB1

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

500 BANJARBARU, KALIMANTAN SELATAN


RB2
400 LEGEND

2nd-FFL

236.2
LANDING

100
cC
-10 0
STR - TIE BEAM 1st-FFL
-50
GL
ELEVATION-A
ARC-1.04
skala : 1 : 100

945.59
TOP

800
RB1

500
RB2
400
PLANNER CONSULTANT
2nd-FFL

236.2 TEAM LEADER, ARCHITECT,


LANDING
(ELDA SUSANTI, IAI)

DRAFTER,
100
cC (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE
-10 0
1st-FFL
ARCHITECTURE
STR - TIE BEAM
SHEET TITLE
-50 ELEVATIONS-1
ELEVATION-B GL
SCALE : 1 : 100
ARC-1.04
skala : 1 : 100
SHEET NUMBER : ARC-3.01
PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
945.59 PROVINSI KALIMANTAN SELATAN
TOP JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

800
RB1 PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN

500 LEGEND
RB2
400
2nd-FFL

236.2
LANDING

100
cC
-10 0
STR - TIE BEAM 1st-FFL
-50
GL
ELEVATION-C
ARC-1.04
skala : 1 : 100

945.59
TOP

800
RB1

500
RB2
400
2nd-FFL PLANNER CONSULTANT

236.2
LANDING TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

100 DRAFTER,

cC (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

-10 0 SHEET DICIPLINE

STR - TIE BEAM 1st-FFL ARCHITECTURE


SHEET TITLE
-50
GL ELEVATIONS-2
ELEVATION-D SCALE : 1 : 100
ARC-1.04
skala : 1 : 100
SHEET NUMBER : ARC-3.02
PROJECT INFORMATION

y1 800 y3 300 y4 400 y5 400 y6 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
945.59 945.59 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
TOP TOP BANJARBARU, KALIMANTAN SELATAN 70732
145.59

145.59
800 800
RB1 RB1 PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL
400

400
BANJARBARU, KALIMANTAN SELATAN

400 400 LEGEND


2nd-FFL 2nd-FFL

236.2
300

LANDING

450
100
cC +0.00 m -0.05 m
0
150

-10
-50
STR - TIE BEAM 1st-FFL
GL

150
-200
PC

400 400 300 800


y1 y2 y2' y3 y4 y6

SECTION - X1 y1 400 y2 y2'400 y3 300 y4 800 y6


ARC-1.04
skala : 1 : 130 945.59 945.59
TOP TOP
145.59

145.59
800 800
RB1 RB1

300
400

500
+4.00 m RB2

100
400 +3.79 m 400
2nd-FFL 2nd-FFL
+2.40 m +3.20 m
236.2

300
LANDING +2.70 m
400

PLANNER CONSULTANT
100
cC +0.00 m

50 100
-0.10 m -0.21 m
-100
STR - TIE1st-FFL -50
50

BEAM TEAM LEADER, ARCHITECT,


GL
(ELDA SUSANTI, IAI)
-0.82 m -0.82 m

150
-200 DRAFTER,

PC (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE
400 400 300 400 400
SHEET TITLE
y1 y2 y2' y3 y4 y5 y6 SECTIONS-1
SECTION - X2 SCALE : 1 : 130
ARC-1.04
skala : 1 : 130
SHEET NUMBER : ARC-4.01
PROJECT INFORMATION

x1 x2 1600 x3 x4 400 S-1.1x5 400 x6 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
945.59 945.59 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732
TOP TOP

145.59

145.59
800 800
PERENCANAAN GEDUNG
RB1 RB1
LOGISTIK BPBD KAL-SEL

400
BANJARBARU, KALIMANTAN SELATAN

+4.00 m +4.00 m LEGEND


400

800
2nd-FFL

236.2

300
LANDING
100
cC +0.00 m

100
-100 0
1st-FFL
STR - TIE BEAM 1st-FFL
200

200
-200 -200
PC PC

1600 250 150 400


x1 x2 x3 x4 x4'S-1.2 S-1.1x5 x6
2400

SECTION - Y1
ARC-1.04
skala : 1 : 130
x6 400 x5S-1.1 S-1.2 400 x4 x3 1600 x2 x1

400 +3.79 m 400


2nd-FFL 2nd-FFL

236.2
300

300
LANDING
100 PLANNER CONSULTANT
cC -0.05 m +0.00 m
100

100
-100 0
STR - TIE1st-FFL
BEAM 1st-FFL

150
TEAM LEADER, ARCHITECT,
200

(ELDA SUSANTI, IAI)


-200 -200
DRAFTER,
PC PC
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

210 190 400 1600 ARCHITECTURE


x6 x5' x5S-1.1 x4 x3 x2 x1 SHEET TITLE

SECTIONS-2
SECTION - Y2 SCALE : 1 : 130
ARC-1.04
skala : 1 : 130
SHEET NUMBER : ARC-4.02
PROJECT INFORMATION

BPBD PROVINSI KALSEL


WD1 (BADAN PENANGGULANGAN BENCANA DAERAH)
WD2 WD2 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
WD1 BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
DR1 LOGISTIK BPBD KAL-SEL
DR3 DR3 WD2

49.54 / 1000 (2.84°)


DR2 WD2
BANJARBARU, KALIMANTAN SELATAN
DR2
DR2 DR1
LEGEND
DR3
DR3
DR1 WD3
DR4
DR1 DR2
DR4
DR5 WD3

DR5

DR4
TERRACE
CONCRETE
FLOOR

WINDOWS DOORS PLAN (1st-F)


skala :

DR4
WINDOWS DOORS
TYPE MARK HEIGHT WIDTH QTY TYPE MARK HEIGHT WIDTH QTY
WD1 80 cm 300 cm 2 DR1 228 cm 129 cm 2
WD2 40 cm 100 cm 2 DR2 210 cm 80 cm 2 PLANNER CONSULTANT

WD3 150 cm 120 cm 1 DR3 210 cm 65 cm 2


DR4 340 cm 398.1 cm 2
TEAM LEADER, ARCHITECT,
DR5 340 cm 300 cm 1
WINDOWS DOORS PLAN (1st-F) (ELDA SUSANTI, IAI)

DRAFTER,
ARC-3.01
skala : 1 : 130
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE

WINDOWS/DOORS PLAN - 1
SCALE : 1 : 130

SHEET NUMBER : ARC-5.01


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

WD1
PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN


WD1

WD4 LEGEND

WD4
DR1 WD2

WD2
WD5
WD1 WD1
WD3
WD5

DR2 WD6
WD6

DR1
WD6
WATERTANK
WD2 WD2
DECKROOF
CORRIDOR

WD4 DR2
WINDOWS DOORS PLAN (2nd-F)
WD4 skala :

WINDOWS DOORS PLAN (2nd-F)


ARC-3.01
skala : 1 : 130

WINDOWS DOORS
TYPE MARK HEIGHT WIDTH QTY TYPE MARK HEIGHT WIDTH QTY PLANNER CONSULTANT

WD1 80 cm 300 cm 2 DR1 228 cm 129 cm 1


WD2 40 cm 100 cm 2 DR2 210 cm 80 cm 1
TEAM LEADER, ARCHITECT,
WD3 150 cm 120 cm 1
(ELDA SUSANTI, IAI)
WD4 40 cm 60 cm 2 DRAFTER,

WD5 150 cm 100 cm 2 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

WD6 40 cm 300 cm 2 SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE

WINDOWS/DOORS PLAN - 2
SCALE : 1 : 130

SHEET NUMBER : ARC-5.02


300 PROJECT INFORMATION

100.79 98.42 100.79 BPBD PROVINSI KALSEL


300 (BADAN PENANGGULANGAN BENCANA DAERAH)
100.79 98.42 100.79 PROVINSI KALIMANTAN SELATAN
SECT. A JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

SECT. A
PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

40
A
B
36.37

SECT. B BANJARBARU, KALIMANTAN SELATAN


80

LEGEND
WD6
A
43.63

OPENING SWING
FRAME ALUMINIUM POWDER COATING PROFILE 3"
B SECT. B PANEL WINDOWS ALUMINIUM + CLEAR GLASS 6mm
AKSESORIS CASEMENT HANDLE/FRICTION STAY/HINGES
WD1
OPENING SWING 100
FRAME ALUMINIUM POWDER COATING PROFILE 3"
PANEL WINDOWS ALUMINIUM + CLEAR GLASS 6mm SECT. A
AKSESORIS CASEMENT HANDLE/FRICTION STAY/HINGES

40
A
B SECT. B
120 100
WD2
SECT. A SECT. A
OPENING SWING
FRAME ALUMINIUM POWDER COATING PROFILE 3"
PANEL WINDOWS ALUMINIUM + CLEAR GLASS 6mm
AKSESORIS CASEMENT HANDLE/FRICTION STAY/HINGES

60
150

150

SECT. A
A A
PLANNER CONSULTANT

40
A TEAM LEADER, ARCHITECT,

B SECT. B B SECT. B B SECT. B


(ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

WD3 WD5 WD4 SHEET DICIPLINE

ARCHITECTURE
OPENING FIXED OPENING SWING OPENING SWING SHEET TITLE
FRAME ALUMINIUM POWDER COATING PROFILE 3" FRAME ALUMINIUM POWDER COATING PROFILE 3" FRAME ALUMINIUM POWDER COATING PROFILE 3" WINDOWS/DOORS DETAIL-1
PANEL WINDOWS ALUMINIUM + CLEAR GLASS 6mm PANEL WINDOWS ALUMINIUM + CLEAR GLASS 6mm PANEL WINDOWS ALUMINIUM + CLEAR GLASS 6mm
AKSESORIS CASEMENT HANDLE/FRICTION STAY/HINGES AKSESORIS CASEMENT HANDLE/FRICTION STAY/HINGES AKSESORIS CASEMENT HANDLE/FRICTION STAY/HINGES SCALE : 1 : 25

SHEET NUMBER : ARC-5.03


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

88.22 73.22
BANJARBARU, KALIMANTAN SELATAN
80 65
130 LEGEND
SECT. A SECT. A
12.8 15.9 15.3 26.67 26.67 26.67 opening

10 10
20
15

140

154
185
220

A A

210

210
105

95

90
40
70
20

16
A SECTION - A B SECTION - B B SECTION - B

DR1 DR2 DR3


OPENING UNEQUAL DOUBLE SWING OPENING SINGLE SWING OPENING SINGLE SWING
FRAME ALUMINIUM POWDER COATING 3" FRAME ALUMINIUM POWDER COATING PROFILE 3" FRAME ALUMINIUM POWDER COATING PROFILE 3"
PANEL DOORS FULLCORE ENGINEERING+DUCO FINISHED+GLASS 6mm PANEL DOORS FULLCORE ENGINEERING + DUCO FINISHED PANEL DOORS PVC DOOR (T=2-3 cm)
AKSESORIS HANDLE/HINGES/LOCK CASE/ AKSESORIS HANDLE/HINGES/LOCK CASE/ AKSESORIS HANDLE/HINGES/LOCK CASE/
DOOR STOPPER DOOR STOPPER DOOR STOPPER
PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE

WINDOWS/DOORS DETAIL-2
SCALE : 1 : 25

SHEET NUMBER : ARC-5.04


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

SECTION - A
SECTION - A PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

BANJARBARU, KALIMANTAN SELATAN


407.67 299.72
203.84 203.84 149.86 149.86 LEGEND
248.56

248.56
340.95

340.95
A A
93.99

93.99 PLANNER CONSULTANT

DR5 DR6
TEAM LEADER, ARCHITECT,

OPENING DOUBLE SLIDE OPENING DOUBLE SLIDE (ELDA SUSANTI, IAI)


FRAME STEEL FRAME (FABRICATION) FRAME STEEL FRAME (FABRICATION) DRAFTER,

PANEL DOORS STEEL PANEL (FABRICATION) PANEL DOORS STEEL PANEL (FABRICATION) (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

AKSESORIS HANDLE/HINGES/LOCK TOOLS/etc AKSESORIS HANDLE/HINGES/LOCK TOOLS/etc SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE

WINDOWS/DOORS DETAIL-3
SCALE : 1 : 25

SHEET NUMBER : ARC-5.05


PROJECT INFORMATION

y1 y2 y3 y3' y4 y1 y3 BPBD PROVINSI KALSEL


400 400 150 150 800
(BADAN PENANGGULANGAN BENCANA DAERAH)
250 550 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

x6 x6 x6 PERENCANAAN GEDUNG
CF2 CF2 LOGISTIK BPBD KAL-SEL
HfL = +2.60 HfL = +2.60
CF1 CF1
400

400

400

400
HfL = +2.70 x5' HfL = +2.60 x5' BANJARBARU, KALIMANTAN SELATAN

CF1 LEGEND
x5 HfL = +2.70 x5 x5

800
150
CF1 x4'
400

400
HfL = +3.20 CF1

492.5
HfL = +2.60

250
x4 x4 x4

400
307.5
x3 x3

600
LIGTHING
1600

1600

1600
FRAME
(HOLLOW)

1200
x2 x2

600
PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,

x1 x1 (ELDA SUSANTI, IAI)

DRAFTER,

800 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)


800 SHEET DICIPLINE
y1 y2 y3 ARCHITECTURE
y1 y3
SHEET TITLE

CEILING PLAN
CEILING PLAN (1st-F) CEILING PLAN (2nd-F)
SCALE :
ARC-3.01
skala : 1 : 120 ARC-3.01
skala : 1 : 120 1 : 120

SHEET NUMBER : ARC-6.01


PROJECT INFORMATION
y3 150 y3' 150 y4
BPBD PROVINSI KALSEL
(BADAN PENANGGULANGAN BENCANA DAERAH)
y3 150 y3' 150 y4 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732
40 cC-1 cC-2
(40x40)
TY1 30 (30x30)
PERENCANAAN GEDUNG
sC-1 ARC-7.03
(WF300x150.6.5,9) sC-2 WT-1 LOGISTIK BPBD KAL-SEL
(WF250X100.4,5.5,3)
x6 WATER TANK

30
HS-2 HS-1

37.85
HANDSHOWER HANDSHOWER BANJARBARU, KALIMANTAN SELATAN

LEGEND

400
+3.82 m
WS-2 WS-1
2nd-FFL +3.79 m
WALL SHOWER WALL SHOWER
210

TOWEL

53.6
A =2 m²

172.15
154.1
TX2 F2 HANGER TX1
ARC-7.02 (Homogenous Tile 30x30 (UnPolished-5cm)) SC-2 SC-1 ARC-7.01
-0.05 m SEAT CLOSET
SEAT CLOSET A =2 m²
F2
FD-2 (Homogenous Tile 30x30 (UnPolished-5cm)) FD-1
FLOOR DRAIN -0.05 m FLOOR DRAIN
DR3

64.9
131.6 DR3

x5'
CF2 CF2

300
HfL = +2.60 / A =m²2.13 m²
A = 2.13 HfL = +2.60 / A =m²2.13 m²
A = 2.13

WB-1
BORDER TILE 10x30 cm BORDER TILE 10x30 cm
WASH BASIN
100

TX3
190

190 ARC-7.02

HOMOGENEOUS HOMOGENEOUS
TILE 30x 60 cm TILE 30x 60 cm

260
TOWEL WS-1
90

100 HANGER WALL SHOWER


WS-2
cC
WALL SHOWER

180
SC-1
SC-2
x5 SEAT CLOSET SEAT CLOSET
PLANNER CONSULTANT
110

HS-2

60
HANDSHOWER TEAM LEADER, ARCHITECT,
HS-1
0
150 150 -10
HANDSHOWER (ELDA SUSANTI, IAI)
1st-FFL
DRAFTER,
y3 y3' y4 STR - TIE BEAM
TY2 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
ARC-7.04
40 20 40 50 40 20 40 50 SHEET DICIPLINE

TOILET PLAN y3 y3' y4


ARCHITECTURE
150 150 SHEET TITLE
ARC-3.01
skala : 1 : 25
TOILET PLAN - 1
SECTION - TX1 SCALE : 1 : 25
ARC-7.01
skala : 1 : 25
SHEET NUMBER : ARC-7.01
PROJECT INFORMATION

y4 150 y3' 150 y3 y4 BPBD PROVINSI KALSEL


95.84
(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

WT-1

WATER TANK BANJARBARU, KALIMANTAN SELATAN


WT-2

WATER TANK LEGEND

+4.00 m
400
+3.79 m RF2
EaB = -0.37 m
2nd-FFL +3.79 m

18.3
53.6

40.2
130
CF1
HfL = +3.20 / A =m²
A = 16.39 16.

CF1
CF2 CF2 HfL = +2.70 / A =m²
A = 14.82 14.82 m²
HfL = +2.60 / A =m²2.13 m²
A = 2.13 HfL = +2.60 / A =m²2.13 m²
A = 2.13
74

BORDER TILE BORDER TILE


10x30 cm 10x30 cm
DR3 DR3

320
+1.40 m
WB-1
131.6
270
WASH BASIN
HOMOGENEOUS

HOMOGENEOUS
TILE 10x60 cm

TILE 10x60 cm
196

180

PLANNER CONSULTANT

90
TEAM LEADER, ARCHITECT,

-0.05 m -0.05 m +0.00 m


0 0 (ELDA SUSANTI, IAI)

-10 1st-FFL -10 1st-FFL DRAFTER,

STR - TIE BEAM STR - TIE BEAM (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

150 30 120 195 ARCHITECTURE


y4 150 y3' 150 y3 y4
SHEET TITLE

TOILET PLAN - 2
SECTION - TX2 SECTION - TX3 SCALE : 1 : 25
ARC-7.01
skala : 1 : 25 ARC-7.01
skala : 1 : 25 SHEET NUMBER : ARC-7.02
PROJECT INFORMATION

x6 210 x5' 190 x5 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

500
PERENCANAAN GEDUNG
RB2
LOGISTIK BPBD KAL-SEL
WT-1

WATER TANK
BANJARBARU, KALIMANTAN SELATAN
WT-2

WATER TANK LEGEND

+3.79 m

58.5
WF-R
EaB = +3.25 m

WF-R CF1
EaB = +3.25 m
HfL = +3.20 / A =m²
A = 16.39 16.39 m²

CF2
HfL = +2.60 / A =m²2.13 m²
A = 2.13

BORDER TILE
225

220
WD2 10x30 cm

sC-2 sC-2
(WF250X100.4,5.5,3) DR3
HOMOGENEOUS TILE (WF250X100.4,5.5,3)

30x60 cm WB-1

WASH BASIN

100 154.1
cC
180

HS-1

HANDSHOWER
SC-1 PLANNER CONSULTANT
cC-2 SEAT CLOSET

100
110

(30x30) 90
cC-2 TEAM LEADER, ARCHITECT,
(30x30)
0 (ELDA SUSANTI, IAI)

-10 1st-FFL DRAFTER,

STR - TIE BEAM (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE

210 190 TOILET PLAN - 3


SECTION - TY1 x6 x5' x5 SCALE : 1 : 25
ARC-7.01
skala : 1 : 25 SHEET NUMBER : ARC-7.03
PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732
x5 190 x5' 210 x6
PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

+3.79 m BANJARBARU, KALIMANTAN SELATAN

LEGEND
sB-3
EaB = +3.50 m

25
WF-R WF-R
CF1 EaB = +3.25 m
EaB = +3.25 m

HfL = +3.20 / A =m²


A = 16.39 16.39 m²

65
CF2
HfL = +2.60 / A =m²2.13 m²
A = 2.13

BORDER TILE
10x30 cm WD2
DR3

160
sC-1
(WF300x150.6.5,9)
330

HOMOGENEOUS TILE
30x60 cm

WS-2
100
WALL SHOWER cC
+0.80 m

cC-1

100
(40x40)

+0.00 m -0.05 m 0
-10 1st-FFL PLANNER CONSULTANT
STR - TIE BEAM

TEAM LEADER, ARCHITECT,

35 190 172.15 37.85 (ELDA SUSANTI, IAI)

DRAFTER,

S-1.1 x5 x5' x6 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

SECTION - TY2 ARCHITECTURE


SHEET TITLE
ARC-7.01
skala : 1 : 25
TOILET PLAN - 4
SCALE : 1 : 25

SHEET NUMBER : ARC-7.04


PROJECT INFORMATION

y2 150 y2' 250 y3 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

sC-2
(WF250X100.4,5.5,3) PERENCANAAN GEDUNG
20 R @ 200 mm 35.28 LOGISTIK BPBD KAL-SEL
x5 x5
BANJARBARU, KALIMANTAN SELATAN
35

LEGEND
12 11 10 9 8 7 6 5 4 3 2 1
SX1
ARC-8.03

113.5
UP

150
80

+1.20 m +1.00 m +0.80 m +0.60 m +0.40 m +0.20 m


35

x4'
13 31 31 31 31 31 31 x4'

14

400
F2
(Homogenous Tile 30x30 (UnPolished-5cm)) 15
+0.00 m

16
250

17

18
Plate (10 mm)
(40 x 40 cm)

19

20
cC-1
(40x40)

x4 x4
PLANNER CONSULTANT
sC-1
(WF300x150.6.5,9)

40 TEAM LEADER, ARCHITECT,

400 (ELDA SUSANTI, IAI)

y2 SX2 y3 DRAFTER,

ARC-8.05 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

STAIRS PLAN ARCHITECTURE


ARC-3.01
skala : 1 : 25 SHEET TITLE

STAIRS PLAN - 1
SCALE : 1 : 25

SHEET NUMBER : ARC-8.01


PROJECT INFORMATION

BPBD PROVINSI KALSEL


y2 400 y3 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
20 R @ 200 mm LOGISTIK BPBD KAL-SEL

x5 x5
BANJARBARU, KALIMANTAN SELATAN

LEGEND
S-1.1
120
SX1
ARC-8.03

120

150
+2.40 m +2.20 m +2.00 m +1.80 m +1.60 m +1.20 m +1.00 m +0.80 m

12 11 10 9 8 7 6 5 4

+2.60 m 13 31 31 31 31 31 31 31 31 x4'
RF2

31
EaB = -0.37 m
+2.80 m 14

31
+3.79 m
400

+3.00 m 15

+3.20 m 16 31
31

+3.40 m

250
17
31

+3.60 m 18
VOIDE
31

+3.80 m 19 20
31

+4.00 m 20 189.41
sC-1
(WF300x150.6.5,9)
x4 DN FF1 x4 PLANNER CONSULTANT
(Homogenous Tile 60x60 (Polished-5cm))
+4.00 m

TEAM LEADER, ARCHITECT,

150 180 70 (ELDA SUSANTI, IAI)

250 DRAFTER,

SX2
y2 y2' y3
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
ARC-8.05
SHEET DICIPLINE

ARCHITECTURE
STAIR PLAN (2nd-F) SHEET TITLE

STAIRS PLAN - 2
ARC-3.01
skala : 1 : 25
SCALE : 1 : 25

SHEET NUMBER : ARC-8.02


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
y2 S-2.1 S-2.2 400 y3 BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
+4.00 m WF-R LOGISTIK BPBD KAL-SEL
400 EaB = +3.57 m +3.95 m 400
2nd-FFL RF2 2nd-FFL
+3.79 m

21.5
EaB = -0.37 m
BANJARBARU, KALIMANTAN SELATAN

LEGEND

58.5
WF-R
EaB = +3.57 m
163.8

sB-3 +3.20 m
CF1 WF-R EaB = +3.50 m

SX1.1 A = 16.39 m² EaB = +3.25 m

ARC-8.04

32.83 35 35 31.17
+2.40 m
236.2 RAIL SUPPORT
HR
LANDING +2.20 m
Ø40
sB-4
EaB = +2.16 m
C-ST +2.00 m
EaB = +2.29 m
+1.80 m

+1.60 m
SX1.2
136.2

WF-
<va S

320
EaB
= ARC-8.04
r ies> +1.40 m

20
31 31 31
+1.20 m
Plate (10 mm) +1.00 m
100 (30 x 30 cm)
cC +0.80 m

+0.60 m

140
cC-1
(40x40)
+0.40 m
100

cC-2 +0.20 m
(30x30)
+0.00 m
0
-10 1st-FFL
STR - TIE BEAM PLANNER CONSULTANT

150 250 TEAM LEADER, ARCHITECT,

y2 y2' y3 (ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

SECTION - SX1 ARCHITECTURE


ARC-8.01
skala : 1 : 25 SHEET TITLE

STAIRS PLAN - 3
SCALE : 1 : 25

SHEET NUMBER : ARC-8.03


PROJECT INFORMATION

32.3 31 BPBD PROVINSI KALSEL


y2 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
+1.40 m WOOD PANEL (T ≥ 3cm) JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
15 2.5 BANJARBARU, KALIMANTAN SELATAN 70732

3.8
PERENCANAAN GEDUNG
UKA35x35x4
(L = 50 mm) LOGISTIK BPBD KAL-SEL
WOOD PANEL (T ≥ 3cm)
C-ST

20
20 R @ 200 mm
UKA100x50x8 EaB = +1.29 m
33.8
(L = 120 mm) +2.40 m BANJARBARU, KALIMANTAN SELATAN
WOOD PANEL (T ≥ 3cm)
+1.20 m C-ST
236.2 236.2 LEGEND
UKA35x35x4 EaB = +1.09 m

LANDING LANDING (L = 50 mm)

3.8
NOSING
WF- Ø2cm
<va S

14.8
EaB
=
ries>
C-ST
sB-4 EaB = +2.29 m
EaB = +2.16 m
UKA35x35x4
(L = 50 mm) C-ST UKA35x35x4
DETAIL - SX1.2 EaB = +1.09 m
(L = 120 mm)
sB-4 WF-S UKA35x35x4 ARC-8.03
skala : 1 : 5 UKA35x35x4
EaB = +2.16 m EaB = +2.21 m (L = 50 mm) (L = 50 mm)
UKA150x75x10
(L = 200 mm)
HOST WALLS
33.44

DETAIL - SX1.1
ARC-8.03
skala : 1 : 5 sC-2 WOOD PANEL (T ≥ 3cm) +1.60 m
(WF250X100.4,5.5,3)

HOST WALLS
HOST WALLS

+1.40 m
C-ST
EaB = +1.49 m

C-ST PLANNER CONSULTANT


EaB = +1.29 m

sB-4
EaB = +2.16 m
+2.40 m
C-ST
EaB = +1.29 m +1.20 m TEAM LEADER, ARCHITECT,
WF-S
EaB = <varies> (ELDA SUSANTI, IAI)

WF-S sB-4 C-ST


DRAFTER,

C-ST EaB = +2.21 m EaB = +2.16 m EaB = +1.09 m WOOD PANEL (T ≥ 3cm) (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
EaB = +2.29 m SHEET DICIPLINE
C-ST
WOOD PANEL (T ≥ 3cm) ORTHOVIEW SX1.2 EaB = +1.09 m
ARCHITECTURE
ORTHOVIEW SX1.1 skala :
SHEET TITLE

STAIRS PLAN - 4
skala :
SCALE : 1:5

SHEET NUMBER : ARC-8.04


PROJECT INFORMATION
x5 x4' x4
150 250 BPBD PROVINSI KALSEL
(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN

107.5 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA


BANJARBARU, KALIMANTAN SELATAN 70732

62 62 62 PERENCANAAN GEDUNG
STEEL

19.5
LOGISTIK BPBD KAL-SEL
RAILING

25
BANJARBARU, KALIMANTAN SELATAN

121.5
10 10
108
LEGEND
+4.00 m

25
PLINT 10x60
+4.00 m

18.5
400 400
2nd-FFL +3.80 m
2nd-FFL
HR
+3.60 m
Ø40
+3.40 m
WF-R sB-3 sB-2
+3.20 m
WF-R EaB = +3.57EaB
m = +3.82 m EaB = +3.67 m
EaB = +3.57 m
163.8

HR SUPPORT +3.00 m WF-R C-ST


EaB = +3.25 m EaB = +3.74 m

+2.80 m
SX2.2
+2.60 m
WF-S ARC-8.06
EaB = <varies>
+2.40 m
236.2 C-ST
LANDING EaB = +2.49 m

WF-S SX2.1
EaB = +2.21 m ARC-8.06

400
136.2

EaB = <varies>
WF-S

100
cC cC-2
(30x30)

PLANNER CONSULTANT

cC-1
110

(40x40)
TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


+0.00 m
0 DRAFTER,
-10 1st-FFL (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
STR - TIE BEAM SHEET DICIPLINE

ARCHITECTURE
SHEET TITLE
35 80 35 250 STAIRS PLAN - 5
SECTION - SX2 x5 S-1.1 S-1.2 x4' x4 SCALE : 1 : 25
ARC-8.01
skala : 1 : 25
SHEET NUMBER : ARC-8.05
PROJECT INFORMATION
x4
S-1.2 x4' 62 7.25 7.5 BPBD PROVINSI KALSEL
22.25 12.75 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
STEEL STEEL JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA

RAILING WOOD PANEL (T ≥ 3cm) RAILING FF1 BANJARBARU, KALIMANTAN SELATAN 70732
(Homogenous Tile 60x60 (Polished-5cm))
+2.80 m sB-3

18.5
C-ST
EaB = +3.82 m
+4.00 m PERENCANAAN GEDUNG
EaB = +2.69 m 400 400 LOGISTIK BPBD KAL-SEL
2nd-FFL 2nd-FFL

8.3
20

+2.60 m

20
UKA35x35x4 BANJARBARU, KALIMANTAN SELATAN
C-ST

10.2
EaB = +2.49 m (L = 50 mm) +3.80 m
C-ST
UKA35x35x4 EaB = +2.69 m
LEGEND
(L = 50 mm) WF-S
20

EaB = <varies>
+2.40 m

20

25
UKA35x35x4
236.2 (L = 50 mm) C-ST WF-R
LANDING WF-S EaB = +3.74 m WF-S EaB = +3.57 m

UKA65x50x5 EaB = <varies> EaB = +3.67 m

(L = 150 mm)
WF-S UKA150x75x10
EaB = +2.21 m
(L = 200 mm)
UKA100x50x8 C-ST
DETAIL - SX2.2
EaB = <varies>

(L = 120 mm)
WF-S

EaB = +3.49 m

ARC-8.05
skala : 1 : 10

35 STRINGER WF-S
(w = 10 mm)
DETAIL - SX2.1 WF-R
EaB = <varies>
S-1.2 x4' EaB = +3.25 m
ARC-8.05
skala : 1 : 10

WOOD PANEL (T ≥ 3cm) C-ST


EaB = +2.69 m

+2.80 m WF-R FF1


EaB = +3.57 m (Homogenous Tile 60x60 (Polished-5cm))
STEEL UKA150x75x10 SCREED
RAILING (L = 200 mm)
+4.00 m
WOOD PANEL (T ≥ 3cm) C-ST
EaB = +2.69 m
+2.60 m
STEEL +4.00 m
RAILING BONDECK
sB-3
FRAME
+2.20 mWOOD PANEL (T ≥ 3cm)
EaB = +3.82 m
C-ST
EaB = +2.49 m PLANNER CONSULTANT
+2.40 m C-ST WF-R
EaB = +3.57 m
EaB = +2.49 m
WOOD PANEL (T ≥ 3cm)
WOOD PANEL (T ≥ 3cm) TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


+3.80 m
C-ST WF-S DRAFTER,
EaB = +2.09 m EaB = +2.21 m STRINGER
C-ST
(w = 10 mm) C-ST (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

C-ST EaB = +2.29 m C-ST EaB = +3.74 m SHEET DICIPLINE


EaB = +2.09 m
EaB = +3.69 m ARCHITECTURE
C-ST
EaB = +2.29 m +3.60 m C-ST SHEET TITLE
C-ST
STAIRS PLAN - 6
EaB = +2.29 m
ORTHOVIEW SX2.1 C-ST
EaB = +3.49 m
EaB = +3.69 m

C-ST ORTHOVIEW SX2.2


skala : WF-S EaB = +3.49 m
skala : SCALE : 1 : 10
EaB = <varies>
SHEET NUMBER : ARC-8.06
BPBD PROVINSI KALIMANTAN SELATAN
BADAN PENANGGULANGAN BENCANA DAERAH
JL. BANGUNPRAJA NO.2 PALAM, CEMPAKA BANJARBARU, KALIMANTAN SELATAN 70732

PEKERJAAN : PERENCANAAN GEDUNG LOGISTIK BPBD KALIMANTAN SELATAN

M.E.P.
DETAILED ENGINEERING DESIGN by :

FOR CONSTRUCTION ONLY


PROJECT INFORMATION

y1 y2 y3 y3' y4 y1 y3 BPBD PROVINSI KALSEL


400 400 150 150 800
(BADAN PENANGGULANGAN BENCANA DAERAH)
250 550 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
CL1.6 CL1.7 BANJARBARU, KALIMANTAN SELATAN 70732
E = +260 E = +260
x6 x6 x6 PERENCANAAN GEDUNG
CL1.4
E = +270 CL1.5 CL2.2 CL2.3 LOGISTIK BPBD KAL-SEL
E = +270 E = +260 E = +260
400

400

400

400
x5' x5'
2
BANJARBARU, KALIMANTAN SELATAN

2
CL1.3 CL1.8
E = +270 E = +320 LEGEND
x5 x5 2 x5

800
CL1.2 SINGLE SWITCH

2
150
E = +270
x4' CL2.1 DOUBLE SWITCH

1
CL1.9 E = +260
400

400
2

E = +320

492.5
HL1 RECEPTACLE

250
CL1.1 E = +467.8
E = +270 CEILING LIGHTS (ES 30W)
x4 x4 x4

1
12

HL2 HANGING LIGHTS (ES 30W)


PANEL + BOX E = +467.8

400
307.5
x3 x3 E = Elevation from FFL
HL3 CL2.4 FFL = Floor Finished Level
E = +467.8 E = +91.6

600
HL4
1600

1600

1600
E = +467.8

1200
x2 x2
HL5 CL2.5
E = +467.8
E = +92.6

600
HL6 PLANNER CONSULTANT
E = +467.8

CL2.6 TEAM LEADER, ARCHITECT,


E = +94.1
x1 x1 (ELDA SUSANTI, IAI)

DRAFTER,

800 300 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)


800 SHEET DICIPLINE
y1 y2 y3 M.E.P.
y1 y3
SHEET TITLE

ELECTRICAL PLAN
ELECTRICAL PLAN (1st-F) ELECTRICAL PLAN (2nd-F)
SCALE : As indicated
ARC-3.01
skala : 1 : 120 ARC-3.01
skala : 1 : 120
SHEET NUMBER : MEP-1.01
PROJECT INFORMATION

y3 y4
300 BPBD PROVINSI KALSEL
1900 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
y1 400 y2 y2'400 y3 150 y3' 150 y4 800 y6 BANJARBARU, KALIMANTAN SELATAN 70732

x6
ST
IW-1 PERENCANAAN GEDUNG
CP50 SEPTICTANK DISTRIBUTION FROM
EL31 CP45 INFILTRATION WELL EL14 LOGISTIK BPBD KAL-SEL
EL29 EL19 WT-1
WATERPUMP
x6 x6 WATER TANK

L=169.09 cm
BANJARBARU, KALIMANTAN SELATAN

CP33
WP-1

110
210

CP49

400
x5' LEGEND

49.54 / 1000 (2.84°)


(+0.00)
(+0.00) WB-1 CP = CLEAN WATER PIPE (3/4")
WASH BASIN DISTRIBUTION TO TOILET SP = SANITARY PIPE (4")
x5 EL3 WP = WASTE WATER PIPE (2")
UP PX1 PX2
VP = VENTILATION PIPE (2")
590

(+0.00) MEP-2.03 MEP-2.04

EL = PVC ELBOW

L=162.33 cm
CP41
400
TE = PVC TEE

L=30.77 cm
CP30
(+0.00)
176.53 85.5 EL13
x4 x4

170

L=30.77 cm
TE7

CP31
EL20 CP28 CP29 EL12
L=168.56 cm L=77.83 cm
CP51

WT-2

WATER TANK
2400

x3 x3

-0.05 m

TERRACE
1600

1600
(+0.00)
(+0.00)

150 53.84 96.16


x2 x2
y3 y3' y4
PY2 PY2
MEP-2.06 MEP-2.05

PLUMBING PLAN (deck roof) PLANNER CONSULTANT


ARC-3.01
skala : 1 : 25

TEAM LEADER, ARCHITECT,

x1 WM x1 (ELDA SUSANTI, IAI)

WATERMETER DRAFTER,
800 700
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
y1 WATERSOURCE (PDAM) y3 y5 y6 SHEET DICIPLINE

M.E.P.
PLUMBING PLAN SHEET TITLE

PLUMBING PLAN - 1
ARC-3.01
skala : 1 : 130
SCALE : As indicated

SHEET NUMBER : MEP-2.01


PROJECT INFORMATION
y3 150 y3' 150 y4
BPBD PROVINSI KALSEL
67.5 80 152.5 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

35
PERENCANAAN GEDUNG
SP5 LOGISTIK BPBD KAL-SEL
ST

ø 120
SEPTICTANK
IW-1
BANJARBARU, KALIMANTAN SELATAN

80
INFILTRATION WELL
LEGEND

CP = CLEAN WATER PIPE (3/4")


SP = SANITARY PIPE (4")

35
WP = WASTE WATER PIPE (2")
CP45 EL34 VP = VENTILATION PIPE (2")
EL17 EL24 EL28 EL = PVC ELBOW

SP4
SP3
x6 EL33 CP38 EL22 x6 TE = PVC TEE
CP42 CP5 CP47 TO WATERTANK
CP36
CP44

37.85
EL27
CP37 EL18 CP17

CP9
EL25 EL16

6
WP
EL15 CP6

WP-1
WS-2 HS-2 WS-1 HS-1
SC-2 SC-1
210

172.15
PX2 PX1
MEP-2.04 MEP-2.03

FD-2 WP8 FD-1

CP46
x5' x5'

WP4
WB-1

100
PX3 PLANNER CONSULTANT
MEP-2.04
EL26

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

150 150 M.E.P.


y3 y3' y4 SHEET TITLE

PY2 PY2 PLUMBING PLAN - 2


PLUMBING PLAN (TOILET) MEP-2.06 MEP-2.05
SCALE : As indicated
ARC-3.01
skala : 1 : 25
SHEET NUMBER : MEP-2.02
PROJECT INFORMATION
y3 150 y3' 150 y4
BPBD PROVINSI KALSEL
(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
WT-1
LOGISTIK BPBD KAL-SEL
WATER TANK

BANJARBARU, KALIMANTAN SELATAN

LEGEND

400
+3.82 m
CP = CLEAN WATER PIPE (3/4")
2nd-FFL CP41 +3.79 m
CP33 SP = SANITARY PIPE (4")
EL19 EL14 WP = WASTE WATER PIPE (2")
VP = VENTILATION PIPE (2")
EL = PVC ELBOW

53.6
TE = PVC TEE

CP34
CP40
300

260
EL17
100 WS-1
EL16
cC WS-2

180
SC-2 SC-1
CP39

PLANNER CONSULTANT
110

EL25
CP36
CP55 HS-2 HS-1
60

EL6 EL2 TEAM LEADER, ARCHITECT,


EL15 0
-10 1st-FFL (ELDA SUSANTI, IAI)

STR - TIE BEAM DRAFTER,


SP2
SP1

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE
SP4 M.E.P.
EL41 EL42 SHEET TITLE

WP6 PLUMBING PLAN - 3


40 20 40 50 40 20 40 50
SECTION - PX1 150 150 SCALE : As indicated
MEP-2.01
skala : 1 : 25 y3 y3' y4 SHEET NUMBER : MEP-2.03
PROJECT INFORMATION

y4 150 y3' 150 y3


BPBD PROVINSI KALSEL
(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
EL12 CP29 TE7 EL3 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL
WT-1

WATER TANK BANJARBARU, KALIMANTAN SELATAN

CP32 LEGEND

+4.00 m CP = CLEAN WATER PIPE (3/4")


400
CP28 EL20 2nd-FFL
SP = SANITARY PIPE (4")
WP = WASTE WATER PIPE (2")
EL13 CP41
VP = VENTILATION PIPE (2")
CP33 EL = PVC ELBOW
53.6

TE = PVC TEE

130
CF1
CF2 CF2 HfL = +2.70 / A =m²
A = 14.82 14.82 m²
HfL = +2.60 / A =m²2.13 m²
A = 2.13 HfL = +2.60 / A =m²2.13 m²
A = 2.13
74

DR3 DR3 y4

+1.40 m
WB-1
131.6

270
WASH BASIN

EL1
196

180

CP1

WP1
EL37 EL36 PLANNER CONSULTANT
WP2

90
WP3
FD-1 FD-2 TEAM LEADER, ARCHITECT,

FLOOR DRAIN FLOOR DRAIN +0.00 m


0 0 (ELDA SUSANTI, IAI)
-10 1st-FFL -10 1st-FFL DRAFTER,
EL38
WP3

STR - TIE BEAM EL38 STR - TIE BEAM


(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
WP7

WP4 TE9 WP8 SHEET DICIPLINE


WP 4 M.E.P.
WP10 WP9 195
TE10 EL40 y4
SHEET TITLE

PLUMBING PLAN - 4
WP6 EL39
SECTION - PX2 150 150 SECTION - PX3 SCALE : As indicated

skala : 1 : 25 y4 y3' y3 skala : 1 : 25


MEP-2.01 MEP-2.02 SHEET NUMBER : MEP-2.04
PROJECT INFORMATION

x6 210 x5' 190 x5 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
EL3 CP30 TE7 CP31 EL11 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

500
RB2 PERENCANAAN GEDUNG
WT-1 LOGISTIK BPBD KAL-SEL
WATER TANK

CP32
WT-2
BANJARBARU, KALIMANTAN SELATAN
WATER TANK
LEGEND
CP27 TE6 CP = CLEAN WATER PIPE (3/4")
CP33 SP = SANITARY PIPE (4")
+3.79 m
EL14 WP = WASTE WATER PIPE (2")
CP26 VP = VENTILATION PIPE (2")
CP13 EL = PVC ELBOW
CP33

58.5
TE = PVC TEE
225

220
DR3
CP34

100 154.1 WB-1


cC

180
CP46
HS-1
EL36
SC-1

100
EL37
110

90
ST

SEPTICTANK

WP3
FD-1
0
-10 1st-FFL
STR - TIE BEAM PLANNER CONSULTANT

TE9 EL38
SP2

WP4
WP8

TE10
WP9

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


SP4 EL42 WP6 EL39 DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE
210 190 M.E.P.
x6 x5' x5 SHEET TITLE

SECTION - PY1 PLUMBING PLAN - 5


MEP-2.01
skala : 1 : 25 SCALE : As indicated

SHEET NUMBER : MEP-2.05


PROJECT INFORMATION

BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
x5 190 x5' 210 x6 BANJARBARU, KALIMANTAN SELATAN 70732

PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL

+3.79 m
EL20 CP41 EL19
BANJARBARU, KALIMANTAN SELATAN

CP28 LEGEND
sB-3
EaB = +3.50 m
CP = CLEAN WATER PIPE (3/4")

25
SP = SANITARY PIPE (4")
WP = WASTE WATER PIPE (2")
VP = VENTILATION PIPE (2")
EL = PVC ELBOW

65
TE = PVC TEE

CP40

160
330

EL17
WS-2 100
EL24 cC
+0.80 m

CP4

CP43

100
EL8

CP20
+0.00 m -0.05 m 0
-10 EL23 1st-FFL
CP21 PLANNER CONSULTANT
STR - TIE BEAM
CP42

TEAM LEADER, ARCHITECT,

35 190 172.15 37.85 (ELDA SUSANTI, IAI)

DRAFTER,
S-1.1 x5 x5' x6
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

M.E.P.
SECTION - PY2 SHEET TITLE

MEP-2.01
skala : 1 : 25 PLUMBING PLAN - 6
SCALE : As indicated

SHEET NUMBER : MEP-2.06


PROJECT INFORMATION

EL11 BPBD PROVINSI KALSEL


CP3 (BADAN PENANGGULANGAN BENCANA DAERAH)
WT-2 1 PROVINSI KALIMANTAN SELATAN

CP3 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA


0 EL3 BANJARBARU, KALIMANTAN SELATAN 70732

TE7 EL20
9 PERENCANAAN GEDUNG
EL12 CP2 LOGISTIK BPBD KAL-SEL
CP4
1
BANJARBARU, KALIMANTAN SELATAN

WT-1 EL19 LEGEND

CP32
CP = CLEAN WATER PIPE (3/4")
EL13 SP = SANITARY PIPE (4")
WP = WASTE WATER PIPE (2")
VP = VENTILATION PIPE (2")
CP3 EL = PVC ELBOW
3
TE = PVC TEE
EL14

CP40
FROM WATERMETER
CP
WB-1 EL16 37
CP38 EL17
EL24 EL25
CP39 CP4
4 5
EL26 EL37 SC-2
CP3 EL8 EL33 CP4

CP34

CP55
EL15
CP4
WP3

6 FD-2 CP5 EL34


CP43

CP18
SC-1 EL7

WP7
EL40 EL9
WP4 FD-1 CP7
CP6 CP20

CP22
EL38
TE9 EL5 EL23
CP9 P42
EL27 EL10 C CP16
TE10 WP 8
CP48

CP24 SP3
CP34

EL4
SP2

EL39 2 EL41
EL42 CP4 CP15
EL28 EL22 PLANNER CONSULTANT
WP6

SP4
TEAM LEADER, ARCHITECT,

ST (ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

M.E.P.
SP5
ORTHOVIEW PLAMBING TOILET
SHEET TITLE

PLUMBING PLAN - 7
skala :
IW-1 SCALE : 1 : 50

SHEET NUMBER : MEP-2.07


PROJECT INFORMATION
INLET (SESUAI DESAIN)
BPBD PROVINSI KALSEL
15 127.5 15 127.5 15 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

15
PERENCANAAN GEDUNG

35
80
LOGISTIK BPBD KAL-SEL

10
BANJARBARU, KALIMANTAN SELATAN

40
OUTLET 70 VENT Ø2-3"

30
79.69

69.69
LEGEND

150
120
CP = CLEAN WATER PIPE (3/4")

30

39.69
SP = SANITARY PIPE (4")
WP = WASTE WATER PIPE (2")
L

9.69
70 VP = VENTILATION PIPE (2")
EL = PVC ELBOW

35.31
TE = PVC TEE

15 152.5 80 67.5
300
C
SEPTICTANK (TOP VIEW)
skala : 1 : 20

152.5 80 67.5
15 137.5 55 60 55 40.97 26.53 35 80 35
CONTROL HOLE 15 25 35 30 30 15
PLATE COVER (2mm) + HANDLE TEE
OUTLET Ø4"
(OVER FLOW) VENT 2-3" COVER w HANDLE
D13-150
20

D13-150

20
34.42

INLET Ø4"
15

15
(SESUAI DESAIN)
30
BRICKWALL 1:2
WATERLEVEL WATERLEVEL WATERLEVEL w PLASTER 1:2
155

155
BRICKWALL 1:2 +
105

105
PLANNER CONSULTANT
PLASTER 1:2

BRICKWALL 1:2 + PVC Ø4"


PLASTER 1:2 PVC Ø4"
30

14/14 SLUDGE
SLUDGE

50
SLOPE 2% TEAM LEADER, ARCHITECT,
D13-150 TRANSITION D13-150 (ELDA SUSANTI, IAI)
20

20
DRAFTER,

WORKPLANE
5 15

15
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

15 127.5 15 127.5 15 150 M.E.P.


COMPARTMENT-2 300 COMPARTMENT-1 SHEET TITLE

PLUMBING PLAN - 8
SEPTICTANK (L-SECTION) SEPTICTANK (C-SECTION) SCALE : As indicated
skala : 1 : 20 skala : 1 : 20 SHEET NUMBER : MEP-2.08
PROJECT INFORMATION
PIPE SCHEDULE PIPE SCHEDULE PIPE FITTING SCHEDULE PIPE FITTING SCHEDULE
BPBD PROVINSI KALSEL
MARK PIPE TYPE LENGTH MARK PIPE TYPE LENGTH MARK SIZE QTY MARK SIZE QTY (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
CP CP42 PVC 3/4" 2.47 m ELBOW EL40 51 mmø-51 mmø 1 BANJARBARU, KALIMANTAN SELATAN 70732

CP1 PVC 3/4" 0.09 m CP43 PVC 3/4" 0.96 m EL1 19 mmø-19 mmø 1 EL41 102 mmø-102 mmø 1
CP2 PVC 3/4" 0.03 m CP44 PVC 3/4" 0.45 m EL2 19 mmø-19 mmø 1 EL42 102 mmø-102 mmø 1 PERENCANAAN GEDUNG
CP3 PVC 3/4" 0.18 m CP45 PVC 3/4" 6.72 m EL3 19 mmø-19 mmø 1 42 LOGISTIK BPBD KAL-SEL
CP4 PVC 3/4" 0.17 m CP46 PVC 3/4" 2.77 m EL4 19 mmø-19 mmø 1 TEE
CP5 PVC 3/4" 0.17 m CP47 PVC 3/4" 0.62 m EL5 19 mmø-19 mmø 1 TE1 19 mmø-19 mmø-19 mmø 1 BANJARBARU, KALIMANTAN SELATAN

CP6 PVC 3/4" 0.18 m CP48 PVC 3/4" 0.65 m EL6 19 mmø-19 mmø 1 TE2 19 mmø-19 mmø-19 mmø 1
LEGEND
CP7 PVC 3/4" 0.23 m CP49 PVC 3/4" 0.15 m EL7 19 mmø-19 mmø 1 TE3 19 mmø-19 mmø-19 mmø 1
CP = CLEAN WATER PIPE (3/4")
CP8 PVC 3/4" 0.03 m CP50 PVC 3/4" 0.58 m EL8 19 mmø-19 mmø 1 TE4 19 mmø-19 mmø-19 mmø 1
SP = SANITARY PIPE (4")
CP9 PVC 3/4" 0.22 m CP51 PVC 3/4" 24.55 m EL9 19 mmø-19 mmø 1 TE5 19 mmø-19 mmø-19 mmø 1 WP = WASTE WATER PIPE (2")
CP10 PVC 3/4" 0.03 m CP52 PVC 3/4" 0.04 m EL10 19 mmø-19 mmø 1 TE6 19 mmø-19 mmø-19 mmø 1 VP = VENTILATION PIPE (2")
CP11 PVC 3/4" 0.03 m CP53 PVC 3/4" 0.02 m EL11 19 mmø-19 mmø 1 TE7 19 mmø-19 mmø-19 mmø 1 EL = PVC ELBOW
CP12 PVC 3/4" 0.03 m CP54 PVC 3/4" 0.66 m EL12 19 mmø-19 mmø 1 TE8 19 mmø-19 mmø-19 mmø 1 TE = PVC TEE
CP13 PVC 3/4" 0.1 m CP55 PVC 3/4" 0.12 m EL13 19 mmø-19 mmø 1 TE9 51 mmø-51 mmø-51 mmø 1
CP14 PVC 3/4" 0.12 m 63.09 m EL14 19 mmø-19 mmø 1 TE10 51 mmø-51 mmø-51 mmø 1
CP15 PVC 3/4" 0.15 m SP EL15 19 mmø-19 mmø 1 10
CP16 PVC 3/4" 0.15 m SP1 PVC 4" 0.43 m EL16 19 mmø-19 mmø 1
CP17 PVC 3/4" 1.09 m SP2 PVC 4" 0.43 m EL17 19 mmø-19 mmø 1
CP18 PVC 3/4" 0.37 m SP3 PVC 4" 1.3 m EL18 19 mmø-19 mmø 1
CP19 PVC 3/4" 0.13 m SP4 PVC 4" 1.48 m EL19 19 mmø-19 mmø 1
CP20 PVC 3/4" 0.55 m SP5 PVC 4" 0.6 m EL20 19 mmø-19 mmø 1
CP21 PVC 3/4" 0.05 m 4.23 m EL21 19 mmø-19 mmø 1
CP22 PVC 3/4" 0.55 m WP EL22 19 mmø-19 mmø 1
CP23 PVC 3/4" 0.05 m WP1 PVC 2" 0.07 m EL23 19 mmø-19 mmø 1
CP24 PVC 3/4" 0.37 m WP2 PVC 2" 0.05 m EL24 19 mmø-19 mmø 1
CP25 PVC 3/4" 0.13 m WP3 PVC 2" 0.73 m EL25 19 mmø-19 mmø 1
CP26 PVC 3/4" 0.12 m WP4 PVC 2" 1.12 m EL26 19 mmø-19 mmø 1
CP27 PVC 3/4" 0.12 m WP5 PVC 2" 0.01 m EL27 19 mmø-19 mmø 1
CP28 PVC 3/4" 1.69 m WP6 PVC 2" 3.09 m EL28 19 mmø-19 mmø 1
CP29 PVC 3/4" 0.78 m WP7 PVC 2" 0.13 m EL29 19 mmø-19 mmø 1
CP30 PVC 3/4" 0.31 m WP8 PVC 2" 1.36 m EL30 19 mmø-19 mmø 1
CP31 PVC 3/4" 0.31 m WP9 PVC 2" 0.02 m EL31 19 mmø-19 mmø 1
PLANNER CONSULTANT
CP32 PVC 3/4" 1.32 m WP10 PVC 2" 0.02 m EL32 19 mmø-19 mmø 1
CP33 PVC 3/4" 1.69 m 6.59 m EL33 19 mmø-19 mmø 1
CP34 PVC 3/4" 3.75 m EL34 19 mmø-19 mmø 1 TEAM LEADER, ARCHITECT,

CP35 PVC 3/4" 0.08 m EL35 19 mmø-19 mmø 1 (ELDA SUSANTI, IAI)

DRAFTER,
CP36 PVC 3/4" 0.27 m EL36 51 mmø-51 mmø 1
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
CP37 PVC 3/4" 0.16 m EL37 51 mmø-51 mmø 1 SHEET DICIPLINE

CP38 PVC 3/4" 0.37 m EL38 51 mmø-51 mmø 1 M.E.P.


CP39 PVC 3/4" 0.74 m EL39 51 mmø-51 mmø 1 SHEET TITLE

CP40 PVC 3/4" 3.81 m PLUMBING PLAN - 9


CP41 PVC 3/4" 1.62 m SCALE : 1 : 50

SHEET NUMBER : MEP-2.09


BPBD PROVINSI KALIMANTAN SELATAN
BADAN PENANGGULANGAN BENCANA DAERAH
JL. BANGUNPRAJA NO.2 PALAM, CEMPAKA BANJARBARU, KALIMANTAN SELATAN 70732

PEKERJAAN : PERENCANAAN GEDUNG LOGISTIK BPBD KALIMANTAN SELATAN

STRUCTURE
DETAILED ENGINEERING DESIGN by :

FOR CONSTRUCTION ONLY


1900 PROJECT INFORMATION

y1 y2 150 y2' y3 y4 y5 y6 BPBD PROVINSI KALSEL


400 250 300 400 400 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
120 295 90 295 120 195 90 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
120 BANJARBARU, KALIMANTAN SELATAN 70732

x6 120 x6 PERENCANAAN GEDUNG


LOGISTIK BPBD KAL-SEL
iF2 iF2
iF1 (90 x 90 x 40)
iF1 (90 x 90 x 40)

iF-1 BANJARBARU, KALIMANTAN SELATAN


400
280

400
(120 x 120 x 40) (120 x 120 x 40)

iF1 STR-1.02 iF2 iF2 iF2

120
(120 x 120 x 40) (90 x 90 x 40) (90 x 90 x 40) (90 x 90 x 40) LEGEND

Jenis bolt & anchor di gambar hanya untuk kete-


x5 x5
120

800
rangan posisi dan ukuran dll, sehingga tetap me-
nyesuaikan ketersediaan jenis yang ada di
iF2 pasaran/lapangan
(90 x 90 x 40)
cC = CONCRETE COLUMN
iF-2
400
280

400
iF1 iF1
(120 x 120 x 40) iF2
STR-1.03
(120 x 120 x 40) iF2 iF-1 LEGEND sC = STEEL COLUMN
cB = CONCRETE BEAM
(90 x 90 x 40) (90 x 90 x 40) skala : 1 : 25
sB = STEEL BEAM
x4 x4
120

PU = PURLIN
RHS = RECTANGLE HOLLOW STEEL
C = CANAL/CNP
IA = WIND BRACING
90 (IKATAN ANGIN)
TS = TRACKSTANG
iF = ISOLATED FOUNDATION
2400

x3 x3
EaB = ELEVATION at BOTTOM
EaT = ELEVATION at TOP

90
1600
1480

1600

1600
iF-2 LEGEND
skala : 1 : 25
x2 x2

PLANNER CONSULTANT

iF1 iF1
(120 x 120 x 40) (120 x 120 x 40)
TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

x1 x1
120

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE
120 680 120
STRUCTURE
800 300 400 400 SHEET TITLE

y1 y2 y3 y4 y5 y6 ISOLATED FOUNDATION PLAN


FOUNDATION SCALE : As indicated
ARC-4.01
skala : 1 : 120 SHEET NUMBER : STR-1.01
PROJECT INFORMATION
iF1.1 x6
STR-1.02 x6
BPBD PROVINSI KALSEL
120 (BADAN PENANGGULANGAN BENCANA DAERAH)
40 10 20.3 9.7 PROVINSI KALIMANTAN SELATAN

15 15 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA


BANJARBARU, KALIMANTAN SELATAN 70732

sC-1 PERENCANAAN GEDUNG


(WF300x150.6.5,9)
1 - M_17A - D16 LOGISTIK BPBD KAL-SEL

10
iF1.2
STR-1.02 Plate (10 mm)
x6
120

(40 x 10 cm) BANJARBARU, KALIMANTAN SELATAN


9 - M_T1 - D16
@150 mm 100 Plate (10 mm)
A (30 x 5 cm) LEGEND

31
cC
1 - M_17A - D16
STR-1.02
6 X 20.00 mm Jenis bolt & anchor di gambar hanya untuk kete-
rangan posisi dan ukuran dll, sehingga tetap me-
(Grade = 4.6) nyesuaikan ketersediaan jenis yang ada di
100
German J-Anchor pasaran/lapangan
cC
21 - M_T1 (Stirrup) Ø8 cC = CONCRETE COLUMN
1 - M_17A - D16

100
@150 mm cC-1 sC = STEEL COLUMN
(40x40) cB = CONCRETE BEAM
y1 40
DETAIL iF1 sB = STEEL BEAM
PU = PURLIN
skala : 1 : 20 +0.00 m
DETAIL iF1.2
STR-1.01

0 0 RHS = RECTANGLE HOLLOW STEEL


1st-FFL
-10 1st-FFL STR-1.02
skala : 1 : 10 C = CANAL/CNP
STR - TIE BEAM 40 6 X 20.00 mm IA = WIND BRACING
50
10 20 10 (Grade = 4.6) (IKATAN ANGIN)
German J-Anchor TS = TRACKSTANG
1 - M_17A - D16 -50 iF = ISOLATED FOUNDATION
1 - M_17A - D16 GL

9
EaB = ELEVATION at BOTTOM

13
1 - M_17A - D16 1 - M_17A - D16 Plate (10 mm) EaT = ELEVATION at TOP

11
(40 x 10 cm)
1 - M_17A - D16
y1 Plate (10 mm)

40

14
21 - M_T1 (Stirrup) Ø8
(40 x 40 cm)
@150 mm

11
200
Plate (10 mm)
cC-1
9 - M_T1 - D16 9 - M_T1 - D16

13
(40 x 10 cm)
1 - M_17A - D16 (40x40)

9
@150 mm @150 mm
21 - M_T1 (Stirrup) Ø8
150

sC-1 Plate (10 mm)


@150 mm (WF300x150.6.5,9)
(40 x 40 cm)
1 - M_17A - D16
1 - M_17A - D16
SECTION - A x6
1 - M_17A - D16 STR-1.02
skala : 1 : 10
1 - M_17A - D16 9 - M_T1 - D16
@150 mm
-200 -200
PLANNER CONSULTANT
PC PC
40

LANTAI KERJA TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


10 5

ORTHOVIEW iF1 PASIR URUG DRAFTER,

skala : (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

120 STRUCTURE
SHEET TITLE

ISOLATED FOUNDATION DETAIL-1


SECTION - iF1.1
SCALE : As indicated
STR-1.02
skala : 1 : 20
SHEET NUMBER : STR-1.02
PROJECT INFORMATION

21 - M_T1 (Stirrup) Ø8 y2 BPBD PROVINSI KALSEL


1 - M_17A - D16 @150 mm (BADAN PENANGGULANGAN BENCANA DAERAH)

y2 10.1 PROVINSI KALIMANTAN SELATAN


JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA

7 - M_T1 - D16 30
BANJARBARU, KALIMANTAN SELATAN 70732

@150 mm
sC-2 PERENCANAAN GEDUNG
B (WF250X100.4,5.5,3)
STR-1.03 LOGISTIK BPBD KAL-SEL
x5
90

sC-2
iF2.1 (WF250X100.4,5.5,3) BANJARBARU, KALIMANTAN SELATAN
STR-1.03
iF2.2
STR-1.03 Plate (10 mm)
LEGEND
100 (50 x 7 cm)
cC

50
90 4 X 16.00 mm
(Grade = 4.6)
y2 7 - M_T1 - D16 German J-Anchor
@150 mm
DETAIL iF2 Plate (10 mm)
100

100
STR-1.01
skala : 1 : 20 (30 x 30 cm)
cC

+0.00 m
0 0 7.5 15 7.5
1st-FFL 1st-FFL
DETAIL iF2.2
50
STR-1.03
skala : 1 : 10

-50
1 - M_17A - D16 1 - M_17A - D16 GL y2
1 - M_17A - D16 1 - M_17A - D16 sC-2
Plate (10 mm) (WF250X100.4,5.5,3)
(50 x 7 cm)
21 - M_T1 (Stirrup) Ø8 Plate (10 mm)

7.5
(30 x 30 cm)
@150 mm

200
Plate (10 mm)

7.5 7.5 7.5


7 - M_T1 - D16 7 - M_T1 - D16 cC-2 x5 (50 x 7 cm)
(30x30) 4 X 16.00 mm
@150 mm @150 mm
150

1 - M_17A - D16 1 - M_17A - D16 (Grade = 4.6)


21 - M_T1 (Stirrup) Ø8 German J-Anchor
1 - M_17A - D16
@150 mm 7.5 7.5 7.5 7.5

7 - M_T1 - D16
7 - M_T1 - D16
@150 mm SECTION - B
-200
@150 mm -200 STR-1.03
skala : 1 : 10
PLANNER CONSULTANT

PC PC
40

TEAM LEADER, ARCHITECT,

ORTHOVIEW iF2 LANTAI KERJA (ELDA SUSANTI, IAI)

skala : DRAFTER,
10 5

PASIR URUG (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

90 STRUCTURE
SHEET TITLE

ISOLATED FOUNDATION DETAIL-2


SECTION iF2.1 SCALE : As indicated
STR-1.03
skala : 1 : 20
SHEET NUMBER : STR-1.03
PROJECT INFORMATION
y1 y2 y2' y3 y3' y4 y6
y6 BPBD PROVINSI KALSEL
800 300 800 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
400 150 250 150 150 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732
TANAH
x6 x6 PASIR URUG URUG
30 PERENCANAAN GEDUNG
COR BETON
0 LOGISTIK BPBD KAL-SEL

210
1st-FFL
400

400
x5'

50
BANJARBARU, KALIMANTAN SELATAN
-50

190
GL LEGEND
x5
800

800
150

100
x4' PASIR URUG
400

400
wF1

250
STR-1.04

10 15
x4 x4

ANSTAMPING 107.41
400

SECTION wF1
STR-1.04
skala : 1 : 30
2400

x3

y3
30
600

COR BETON
wF2 TANAH DR4 F2"
PASIR URUG
1600

1600
STR-1.04 (Homogenous Tile 30x30 (UnPolished-3cm))
URUG +0.00 m
0
1st-FFL -10

40 10
STR - TIE BEAM
x2

50

40
cB-1 -50
EaB = -0.50 m
GL
wF1
(30 x 79.87 x 100)
AN1

100
(1520.13 x 90 x 15)
600

125
PLANNER CONSULTANT

10 15
TEAM LEADER, ARCHITECT,

x1 x1 (ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)


79.87
800 300 400 400 SHEET DICIPLINE
90 STRUCTURE
1900
SHEET TITLE

y1 y3 y4 y5 y6 SECTION wF2 y3 WALL FOUNDATION PLAN


WALL FOUNDATION PLAN STR-1.04
skala : 1 : 30 SCALE : As indicated
ARC-3.01
skala : 1 : 120 SHEET NUMBER : STR-1.04
PROJECT INFORMATION

1900
BPBD PROVINSI KALSEL
(BADAN PENANGGULANGAN BENCANA DAERAH)
y1 400 y2 150 y2' 250 y3 150 y3' 150 y4 400 y5 400 y6 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

cB-1 cB-2
EaB = -0.50 m EaB = -0.50 m
x6 x6 PERENCANAAN GEDUNG
cB-1 cB-1 LOGISTIK BPBD KAL-SEL
210

EaB = -0.50 m
EaB = -0.50 m EaB = -0.50 m

cB-2

EaB = -0.50 m
cB-1
BANJARBARU, KALIMANTAN SELATAN

400
x5' x5'

EaB = -0.50 m
EaB = -0.50 m

cB-1
EaB = -0.50 m
cB-1

cB-2
cB-2
190

cB-2 cB-2 EaB = -0.50 m LEGEND


EaB = -0.50 m EaB = -0.50 m
Jenis bolt & anchor di gambar hanya untuk kete-
x5 x5

800
rangan posisi dan ukuran dll, sehingga tetap me-
35 80 35

S-1.1 EaB = -0.50 m


cB-2
nyesuaikan ketersediaan jenis yang ada di
150

pasaran/lapangan
S-1.2
x4' x4' cC = CONCRETE COLUMN
EaB = -0.50 m

EaB = -0.50 m
cB-1

cB-1

400
sC = STEEL COLUMN
EaB = -0.50 m
cB-2
250

cB-1 cB = CONCRETE BEAM


EaB = -0.50 m sB = STEEL BEAM
x4 x4 PU = PURLIN
cB-2 cB-2 RHS = RECTANGLE HOLLOW STEEL
EaB = -0.50 m EaB = -0.50 m

C = CANAL/CNP
EaB = -0.50 m
EaB = -0.50 m

cB-1
cB-1

IA = WIND BRACING
400

400
(IKATAN ANGIN)
TS = TRACKSTANG
iF = ISOLATED FOUNDATION
2400

x3
EaB = ELEVATION at BOTTOM
EaT = ELEVATION at TOP
EaB = -0.50 m
EaB = -0.50 m
600

600
cB-1
cB-1

1600
x2
EaB = -0.50 m

EaB = -0.50 m
cB-1

cB-1
600

600
PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,


cB-1 cB-2
EaB = -0.50 m EaB = -0.50 m (ELDA SUSANTI, IAI)

x1 DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)


800 300 400 400 SHEET DICIPLINE

y1 y3 y4 y5 y6 STRUCTURE
SHEET TITLE

FRAME PLAN (BELOW) FRAMING PLAN - 1


ARC-3.01
skala : 1 : 120 SCALE : As indicated

SHEET NUMBER : STR-2.01


PROJECT INFORMATION

1900 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
y1 400 B-A y2 400 y3 300 y4 400 y5 400 y6 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
STR-2.02 BANJARBARU, KALIMANTAN SELATAN 70732
6 6.24 6.24 6
WF-R WF-R WF-R EaBsB-2
= +3.35 m
B-1.1 6 X 12.00 mm
EaB = +3.57 m EaB = +3.57 m EaB = +3.25 m
STR-2.02
sC-2 (Grade = 10.9) PERENCANAAN GEDUNG
x6 x6 WF-R (WF250X100.4,5.5,3)
EaB = +3.57 m UNI 5712 LOGISTIK BPBD KAL-SEL
210

WF-R WF-R

EaB = +3.25 m
EaB = +3.57 m

WF-R
WF-R

EaB = +3.57 m EaB = +3.57 m


BANJARBARU, KALIMANTAN SELATAN

400
x5' x5' x6

11
EaB = +3.82 m
EaB = +3.82 m

EaB = +3.82 m

sB-3
sB-3

sB-3
EaB = +3.82 m

EaB = +3.82 m

EaB = +3.82 m
sB-2
190

sB-3

sB-3

sB-3
WF-R EaB = +3.35 m 2 X 12.00 mm
LEGEND
EaB = +3.57 m
Jenis bolt & anchor di gambar hanya untuk kete-
x5 x5 2 X 12.00 mm (Grade = 10.9)

800
rangan posisi dan ukuran dll, sehingga tetap me-
S-1.1 WF-R UNI 5712
EaB = +3.82 m (Grade = 10.9) nyesuaikan ketersediaan jenis yang ada di
EaB = +3.82 m

sB-3
EaB = +3.57 m
sB-3

S-1.2 WF-R UNI 5712


pasaran/lapangan
x4'

EaB = +3.82 m
cC = CONCRETE COLUMN

sB-3
EaB = +3.57 m

EaB = +3.25 m
EaB = +3.25 m

WF-R
WF-R
400

400
sC = STEEL COLUMN
EaB = +3.57 m
WF-R

EaB = +3.57 m
WF-R
sB-3 WF-R cB = CONCRETE BEAM
WF-R
EaB = +3.57 m EaB = +3.82 m EaB = +3.57 m sB = STEEL BEAM
x4 x4 PU = PURLIN
16.16 16.16
EaB = +3.82 m
sB-2 sB-2 sB-2
sB-3

EaB = +3.35 m EaB = +3.35 m EaB = +3.35 m RHS = RECTANGLE HOLLOW STEEL
sB-2 sB-2 y2 C = CANAL/CNP
EaB = +3.67 m EaB = +3.67 m
DETAIL B-A IA = WIND BRACING
skala : 1 : 10 (IKATAN ANGIN)
WF-R STR-2.02

EaB = <varies> TS = TRACKSTANG


iF = ISOLATED FOUNDATION
2400

x3 x3
EaB = ELEVATION at BOTTOM
EaB = +3.57 m

x6 FF1
WF-R

3 X 12.00 mm
(Homogenous Tile 60x60 (Polished-5cm))
DECKFLOOR EaT = ELEVATION at TOP
SCREED +4.00 m
(Grade = 10.9) 400
UNI 5712 2nd-FFL

3.3 5
sB-3

10.2
1600

1600

1600
EaB = +3.82 m

UKA150x90x10

6 4.05
WF-R (L = 200 mm)
EaB = <varies>
Plate (6 mm)
x2 x2

25
(23 x 5.75 cm)

3.95 6
UKA45x45x5
(L = 200 mm)
3 X 12.00 mm WF-R
EaB = +3.57 m

5.5 5.5 4
WF-R

(Grade = 10.9) WF-R EaB = +3.57 m


EaB = +3.57 m 2 X 12.00 mm
PLANNER CONSULTANT
UNI 5712 (Grade = 10.9)
RSA150x150x10 UNI 5712
sC-2 (L = 100 mm)
(WF250X100.4,5.5,3) TEAM LEADER, ARCHITECT,
WF-R
EaB = +3.88 m (ELDA SUSANTI, IAI)

x1 x1 DRAFTER,
25.1
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

800 300 400 400 SECT. B-1.1 SHEET DICIPLINE

STRUCTURE
y1 y3 y4 y5 y6 STR-2.02
skala : 1 : 10 SHEET TITLE

FRAMING PLAN - 2
FRAME PLAN (MIDDLE) SCALE : As indicated
ARC-3.01
skala : 1 : 120
SHEET NUMBER : STR-2.02
PROJECT INFORMATION
1900
BPBD PROVINSI KALSEL
y1 400 y2 y2' 400 y3 150 y3' 150 y4 400 y5 400 y6 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732
cC-1 cC-2 cC-1 cC-2
(40x40) (30x30) (40x40) cC-3 (30x30)
(12x12)
x6 sC-1 x6 PERENCANAAN GEDUNG
(WF300x150.6.5,9) cC-3 cC-3
sC-2 (12x12) LOGISTIK BPBD KAL-SEL
sC-2 (12x12)
sC-1
210

(WF250X100.4,5.5,3) (WF300x150.6.5,9) (WF250X100.4,5.5,3)

cC-3 cC-3 BANJARBARU, KALIMANTAN SELATAN

400
x5' x5'
(12x12) (12x12)
cC-2 sC-2 cC-3
sC-2
190

(12x12) LEGEND
(30x30) (WF250X100.4,5.5,3) (WF250X100.4,5.5,3)

x5 cC-1 sC-1 sC-1 cC-1 cC-2 x5

800
(40x40) (WF300x150.6.5,9) (WF300x150.6.5,9) (40x40) (30x30) 40
sC-2 cC-2
(WF250X100.4,5.5,3) (30x30)
x4' x4' cC-1

40
sC-2 cC-2
400

400
(WF250X100.4,5.5,3) (30x30)
cC-2 sC-1 sC-2 30
(30x30) (WF300x150.6.5,9) (WF250X100.4,5.5,3)

x4 cC-1 sC-1 cC-1 cC-2 x4 cC-2

30
(40x40) (WF300x150.6.5,9) (40x40) (30x30)
sC-2
(WF250X100.4,5.5,3) 12
cC-3

12
15
cC-1 sC-1 cC-1 sC-1 sC-1
2400

x3 x3

30
(40x40) (WF300x150.6.5,9) (40x40) (WF300x150.6.5,9)
10.1

sC-2

25.1
1600

1600

1600
x2 cC-1 sC-1 cC-1 sC-1 x2
(40x40) (WF300x150.6.5,9) (40x40) (WF300x150.6.5,9)

PLANNER CONSULTANT

sC-1 sC-1
TEAM LEADER, ARCHITECT,
(WF300x150.6.5,9) (WF300x150.6.5,9)
(ELDA SUSANTI, IAI)

x1 cC-1 cC-1 x1 DRAFTER,


(40x40) (40x40)
(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
800 300 400 400 SHEET DICIPLINE

y1 y2 y2' y3 y4 y5 y6 STRUCTURE
SHEET TITLE

COLUMNS PLAN
COLUMNS PLAN SCALE : As indicated
ARC-3.01
skala : 1 : 120
SHEET NUMBER : STR-3.01
PROJECT INFORMATION

y1 y2 y3 y4 BPBD PROVINSI KALSEL


400 400 300 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
36.31 106.84 120.34 120.34 32.32 121.99 121.99 103.54 72.62 82.51 82.51 82.51 BANJARBARU, KALIMANTAN SELATAN 70732

x6 x6 PERENCANAAN GEDUNG
WF-R WF-R WF-R LOGISTIK BPBD KAL-SEL
EaB = +3.57 m EaB = +3.57 m EaB = +3.25 m

130
BANJARBARU, KALIMANTAN SELATAN

EaB = +3.82 m

EaB = +3.82 m
sB-3
200

sB-3
EaB = +3.82 m
sB-3

EaB = +3.82 m
sB-3
EaB = +3.82 m
sB-3
LEGEND

EaB = +3.25 m EaB = +3.50 m


sB-2

EaB = +3.82 m

WF-R sB-3
sB-3
Jenis bolt & anchor di gambar hanya untuk kete-

EaB = +3.50 m
sB-3
EaB = +3.35 m
rangan posisi dan ukuran dll, sehingga tetap me-

EaB = +3.50 m
sB-3
nyesuaikan ketersediaan jenis yang ada di
400

140
400
EaB = +3.50 m
sB-3
pasaran/lapangan
WF-R WF-R
cC = CONCRETE COLUMN

EaB = +3.82 m
EaB = +3.57 m EaB = +3.57 m

WF-R sB-3
A sC = STEEL COLUMN
EaB = +3.57 m EaB = +3.82 m

STR-4.02 sB-2 cB = CONCRETE BEAM


WF-R sB-3

EaB = +3.57 m
200

EaB = +3.82 m
sB-3

EaB = +3.35 m
sB = STEEL BEAM

EaB = +3.82 m
sB-3

EaB = +3.82 m

130
sB-3
PU = PURLIN
RHS = RECTANGLE HOLLOW STEEL
x5 x5 C = CANAL/CNP
sB-2 IA = WIND BRACING
35

WF-R WF-R
EaB = +3.57 m EaB = +3.57 m EaB = +3.35 m
(IKATAN ANGIN)
WF-S

130
TS = TRACKSTANG
80

EaB = +3.82 m

EaB = +2.21 m
sB-3

iF = ISOLATED FOUNDATION
S-1.2 EaB = ELEVATION at BOTTOM
WF-S EaT = ELEVATION at TOP
WF-R
EaB = +2.21 m sB-2
85

EaB = +3.25 m
WF-R
EaB = +3.50 m
EaB = +3.35 m

sB-3
EaB = +3.50 m
EaB = +3.57 m

sB-3
EaB = +3.25 m
WF-R

EaB = +3.50 m
400

140
400
sB-3

EaB = +3.50 m
sB-3
EaB = <varies>

EaB = <varies>
WF-S

WF-S
EaB = +3.82 m
EaB = +3.82 m
EaB = +3.82 m

sB-3
sB-3
sB-3

sB-2
200

EaB = +3.57 m
WF-R

EaB = +3.35 m

130
EaB = +3.57 m
WF-R

STR-4.03

x4 x4
WF-R WF-R
EaB = +3.82 m
EaB = +3.82 m
EaB = +3.82 m

EaB = +3.57 m
EaB = +3.57 m EaB = <varies>

WF-R
EaB = +3.57 m

EaB = +3.82 m

sB-3
sB-3
sB-3
WF-R
100

sB-3

PLANNER CONSULTANT

sB-2 sB-2 sB-2


EaB = +3.67 m EaB = +3.67 m EaB = +3.67 m
TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


36.31 106.84 120.34 120.34 16.16 49.15 60 90.85 102.14 97.86 36.31 82.51 82.51 82.51 16.16 DRAFTER,

800 300 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

y1 y2 S-2.1 S-2.2 y3 y4 STRUCTURE


SHEET TITLE

SLAB FLOOR PLAN


DECKFLOOR PLAN SCALE : 1 : 50
ARC-3.01
skala : 1 : 50
SHEET NUMBER : STR-4.01
PROJECT INFORMATION
2 X 12.00 mm 2 X 12.00 mm
(Grade = 10.9) (Grade = 10.9) BPBD PROVINSI KALSEL
WF-R UNI 5712 UNI 5712 (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
EaB = +3.57 m
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732
x6

METALDECK PERENCANAAN GEDUNG


A.1 WF-R sC-1 LOGISTIK BPBD KAL-SEL
STR-4.02 EaB = +3.25 m
(WF300x150.6.5,9)

EaB = +3.57 m
WF-R
6 X 12.00 mm BANJARBARU, KALIMANTAN SELATAN
(Grade = 10.9)

EaB = +3.50 m

130
EaB = +3.82 m

sB-3
sB-3

LEGEND
UNI 5712
Jenis bolt & anchor di gambar hanya untuk kete-
UKA150x75x10 rangan posisi dan ukuran dll, sehingga tetap me-
(L = 200 mm) nyesuaikan ketersediaan jenis yang ada di
200

pasaran/lapangan
3 X 12.00 mm
sB-2
EaB = +3.35 m
sBB -= +33.82 m (Grade = 10.9) cC = CONCRETE COLUMN
Ea
UNI 5712 sC = STEEL COLUMN
STUDS METALDECK cB = CONCRETE BEAM
sB = STEEL BEAM
PU = PURLIN
RHS = RECTANGLE HOLLOW STEEL
EaB = +3.57 m
WF-R

80

C = CANAL/CNP
WF-R
EaB = +3.57 m IA = WIND BRACING
R
WBF=-+3.57 m W F-
(IKATAN ANGIN)
x5'
Ea
EaB
= +3.2 R TS = TRACKSTANG
5m
y3 F- R m
WB = +3.25
iF = ISOLATED FOUNDATION
Ea EaB = ELEVATION at BOTTOM
30 Plate (6 mm) EaT = ELEVATION at TOP
36.31 36.31 (23 x 5.75 cm)

y3 2 X 12.00 mm cC-3 RSA150x150x10


RSA135x65x10
DETAIL - A (Grade = 10.9) (L = 100 mm) +3.95 m
400
(12x12)
(L = 100 mm)
STR-4.01
skala : 1 : 20 UNI 5712 METAL DECK 2nd-FFL
ORTHOVIEW - A.1
8.3

+3.79 m WATERPROOF

21.5
sB-3 WF-R LAYER
10.2

skala :
EaB = +3.82 m
EaB = +3.57 m COR BETON
UKA45x45x5

3
(L = 200 mm)
Plate (6 mm)
25

15.3
(23 x 5.75 cm)

2 X 12.00 mm
PLANNER CONSULTANT
sB-3
10.2
(Grade = 10.9)
6.5

EaB = +3.50 m
UNI 5712
6 4 2.5

RSA150x150x10
(L = 100 mm) TEAM LEADER, ARCHITECT,
UKA150x75x10
25

25

6 X 12.00 mm (ELDA SUSANTI, IAI)


(L = 200 mm)
2.5 4 6

(Grade = 10.9) DRAFTER,

UNI 5712 WF-R (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

EaB = +3.25 m
2 X 12.00 mm EaBWF-R SHEET DICIPLINE

STRUCTURE
= +3.25 m

sC-1 (Grade = 10.9)


SHEET TITLE
(WF300x150.6.5,9) UNI 5712
SLAB FLOOR DETAIL - 1
SECTION A.1 RSA150x150x10
(L = 100 mm) SCALE : As indicated
STR-4.02
skala : 1 : 10
SHEET NUMBER : STR-4.02
PROJECT INFORMATION

B.1 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
STR-4.03
x4 PROVINSI KALIMANTAN SELATAN
36.31 106.84 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA

2 X 12.00 mm 15 BANJARBARU, KALIMANTAN SELATAN 70732

(Grade = 10.9) 2 X 12.00 mm


(Grade = 10.9) FF1 PERENCANAAN GEDUNG
UNI 5712 COR BETON (Homogenous Tile 60x60 (Polished-5cm))
x4 UNI 5712 +4.00 m +4.00 m LOGISTIK BPBD KAL-SEL
sC-1 METALDECK 400
(WF300x150.6.5,9) WF-R 2nd-FFL
RSA135x65x10

5
EaB = +3.57 m
BANJARBARU, KALIMANTAN SELATAN
(L = 100 mm)
2 X 12.00 mm sB-2 RSA135x65x10 UKA150x90x10

13.5
+3.82 m
(Grade = 10.9) EaB = +3.67 m (L = 100 mm) (L = 200 mm) LEGEND

EaB = +3.82 m
EaB = +3.82 m

sB-3
sB-3

100
UNI 5712

6 4 2.5
Jenis bolt & anchor di gambar hanya untuk kete-

3 6 3
rangan posisi dan ukuran dll, sehingga tetap me-
EaB = +3.57 m
WF-R

nyesuaikan ketersediaan jenis yang ada di

25
pasaran/lapangan

2.5 4 6
cC = CONCRETE COLUMN
sC = STEEL COLUMN
2 X 12.00 mm 2 X 12.00 mm cB = CONCRETE BEAM
sB-2 WF-R 6 X 12.00 mm
(Grade = 10.9) EaB = +3.57 m (Grade = 10.9) sB = STEEL BEAM
EaB = +3.67 m
UKA100x50x8 UNI 5712 (Grade = 10.9)
UNI 5712 PU = PURLIN
143.15 (L = 120 mm) UNI 5712
RSA150x150x10 RHS = RECTANGLE HOLLOW STEEL
y1 (L = 100 mm)
C = CANAL/CNP
3 4.8 15 4.8 3
100 IA = WIND BRACING
DETAIL - B (IKATAN ANGIN)
TS = TRACKSTANG
STR-4.01
skala : 1 : 20
SECTION B.1 iF = ISOLATED FOUNDATION
sC-1 skala : 1 : 10 EaB = ELEVATION at BOTTOM
STR-4.03

(WF300x150.6.5,9)
EaT = ELEVATION at TOP

METALDECK

2 X 12.00 mm
(Grade = 10.9)
UNI 5712
PLANNER CONSULTANT
W F-
R
E aB R
WBF=-+3.57 m
= +3.5

sBB -= +33.82 m
7m

Ea
Ea
TEAM LEADER, ARCHITECT,

Plate (6 mm) (ELDA SUSANTI, IAI)


(23 x 5.75 cm)
DRAFTER,
RSA150x150x10 2 X 12.00 mm (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
(L = 100 mm) (Grade = 10.9) SHEET DICIPLINE

E aB
sB-2 UNI 5712 STRUCTURE
2 X 12.00 mm = +3.6
7m
SHEET TITLE

UKA100x50x8 (Grade = 10.9) ORTHOVIEW - B.1 SLAB FLOOR DETAIL - 2


(L = 120 mm) UNI 5712
skala : SCALE : As indicated

SHEET NUMBER : STR-4.03


PROJECT INFORMATION
y1 800 y3 300 y4 800 y6
y1 800 y3 300 y4 800 y6 BPBD PROVINSI KALSEL
(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
x6 x6 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

x6 x6

400
WF-R PERENCANAAN GEDUNG
EaB = <varies>
LOGISTIK BPBD KAL-SEL
S-x51.1

400
S-1.2
BANJARBARU, KALIMANTAN SELATAN

400
WF-R
EaB = <varies>

x4 x5 LEGEND

Jenis bolt & anchor di gambar hanya untuk kete-


rangan posisi dan ukuran dll, sehingga tetap me-
nyesuaikan ketersediaan jenis yang ada di
pasaran/lapangan

400
2400

x3 x3 cC = CONCRETE COLUMN
WF-R
EaB = <varies> WF-R sC = STEEL COLUMN
EaB = <varies>

x4 cB = CONCRETE BEAM
sB = STEEL BEAM

1600
PU = PURLIN

(CNP 150.12,2 - 25.70 m)


RHS = RECTANGLE HOLLOW STEEL

(CNP 150.12,2 - 25.70 m)

PU
x2 x2

(CNP 150.12,2 - 11.40 m)(CNP 150.12,2 - 11.40 m)


C = CANAL/CNP

PU
(CNP 150.12,2 - 25.70 m)

PU
IA = WIND BRACING

PU
(IKATAN ANGIN)

(CNP 150.12,2 - 25.70 m)


2400
x3 x3

PU
TS = TRACKSTANG

PU
iF = ISOLATED FOUNDATION

(CNP 150.12,2 - 11.40 m)


(CNP 150.12,2 - 25.70 m)

(CNP 150.12,2 - 25.70 m)


x1 x1 EaB = ELEVATION at BOTTOM

PU
PU

PU
EaT = ELEVATION at TOP

(CNP 150.12,2 - 11.40 m)


400 400 300 800

PU
y1 y2
S-2.1S-2.2
y2' y3 y4 y6 IA

1600
TS EaB = <varies>

TOP ELEVATION EaB = <varies>

ARC-3.01
skala : 1 : 200 WF-R WF-R
EaB = <varies> EaB = <varies>
x2 x2

R1
STR-5.02

s>
IA
e
<vari
=
EaB
TS
EaB = <varies>
PLANNER CONSULTANT

WF-R WF-R
EaB = <varies> EaB = <varies>
TEAM LEADER, ARCHITECT,
x1 x1
(ELDA SUSANTI, IAI)

DRAFTER,
400 400 300 800 (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

y1 y2 y3 y4 y6 SHEET DICIPLINE

STRUCTURE
SHEET TITLE

ROOF PLAN
ROOF FRAME PLAN
ARC-3.01
skala : 1 : 120 SCALE : As indicated

SHEET NUMBER : STR-5.01


PROJECT INFORMATION

BPBD PROVINSI KALSEL


R1.B (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
STR-5.04
y1 y2 y3 JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
400 400 BANJARBARU, KALIMANTAN SELATAN 70732

82.46
82.46 PERENCANAAN GEDUNG
150 LOGISTIK BPBD KAL-SEL
945.59
TOP TS
EaB =
<vari e
s> 150
450 PU BANJARBARU, KALIMANTAN SELATAN
EaB = +8.75 m
150
145.59

LEGEND
WF-R RHS 50.30 WF-R
Jenis bolt & anchor di gambar hanya untuk kete-
EaB = <varies> EaB = +8.68 m EaB = <varies>
124.6
800 6 rangan posisi dan ukuran dll, sehingga tetap me-
nyesuaikan ketersediaan jenis yang ada di
RB1 124.6 pasaran/lapangan
6
cC = CONCRETE COLUMN

100
sB-2 sB-2 124.6
EaB = <varies>
R1.A EaB = <varies> PU
6 sC = STEEL COLUMN
STR-5.03 EaB = +6.61 m 169.5
8 124.6 cB = CONCRETE BEAM
6
PU sB = STEEL BEAM

406.86
EaB = +6.18 m
PU = PURLIN
300

sC-1
sC-1

50.00°
PU RHS = RECTANGLE HOLLOW STEEL

150
(WF300x150.6.5,9)
(WF300x150.6.5,9) EaB = +5.76 m

PU C = CANAL/CNP
sB-2 EaB = +5.33 m IA = WIND BRACING
EaB = <varies>
ROD (IKATAN ANGIN)

79.83
WF-R
500
EaB = <varies>
500
TS = TRACKSTANG
RB2 RB2 iF = ISOLATED FOUNDATION

150
EaB = ELEVATION at BOTTOM

30.00°
100

100
EaT = ELEVATION at TOP
HL5
400 E = +467.8 400
2nd-FFL 2nd-FFL

159.36 159.36 185.57


SECTION - R1 800 504.29
STR-5.01
skala : 1 : 50

PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

STRUCTURE
SHEET TITLE

ROOF DETAIL-1
SCALE : 1 : 50

SHEET NUMBER : STR-5.02


PROJECT INFORMATION

SPANDECK SHINGLES BPBD PROVINSI KALSEL

7.5 7.5
(BADAN PENANGGULANGAN BENCANA DAERAH)
TSvaries> 150 PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
<
PU EaB =
PU

25
BANJARBARU, KALIMANTAN SELATAN 70732
E aB
y1 EaB = +8.24 m = +8.7
5m TS= <varies>
EaB
PERENCANAAN GEDUNG
LOGISTIK BPBD KAL-SEL
150 WF= <-vRaries>
EaB
PU
EaB = +7.73 m BANJARBARU, KALIMANTAN SELATAN
Folded PLT5x130x115
800 (L = 130 mm)
RB1 LEGEND

Jenis bolt & anchor di gambar hanya untuk kete-


rangan posisi dan ukuran dll, sehingga tetap me-
RAFTER_WF250.125.6.8 TS= <varies>
15

nyesuaikan ketersediaan jenis yang ada di


(L = 704.06 mm)
A1 EaB pasaran/lapangan
14.8

PU

EaB =
cC = CONCRETE COLUMN

IA<varies>
W150X13 STR-5.03
sB-2
E aB
= +8.2
100

4m
(L = 950 mm) EaB = <varies> sC = STEEL COLUMN
157.23 -R s> cB = CONCRETE BEAM
1 X 6.00 mm WFaB = <varie 2 X 8.00 mm
E sB = STEEL BEAM
(Grade = 4.6)
sC-1 (Grade = 8.8) PU = PURLIN
EN ISO 4016
(WF300x150.6.5,9)
Folded PLT5x130x115 XOX RHS = RECTANGLE HOLLOW STEEL
(L = 130 mm) W F- TS= <varies> C = CANAL/CNP
E
aB = R IA EaB
IA = WIND BRACING
DETAIL R1.A
+ 7.75
m EaB = <varies>

1 X 20.00 mm (IKATAN ANGIN)


STR-5.02
skala : 1 : 20 Plate (5 mm) TS = TRACKSTANG
y1 (Grade = 8.8) (31.93 x 15 cm)
XOX iF = ISOLATED FOUNDATION
12.5 EaB = ELEVATION at BOTTOM
sC-1 WF-R EaT = ELEVATION at TOP
(WF300x150.6.5,9)
6
EaB = <varies>

W150X13 WF-R TS= <varies>


EaB = +7.75 m 3 X 12.00 mm
W150X13 EaB
(Grade = 10.9) RAFTER_WF250.125.6.8
8

(L = 950 mm)
UNI 5712 (L = 704.06 mm)
W150X13
(L = 950 mm)
8

800
RB1
TS= <varies>
4.05

EaB 2 X 8.00 mm
(Grade = 4.6)
12

3 X 12.00 mm
6

EN ISO 4016
(Grade = 10.9) W F-
UNI 5712
EaB
= +7.7 R PLANNER CONSULTANT
5m
PU
6

EaB
= +7.7
3m
UKA150x90x10
3.95

(L = 200 mm) RAFTER_WF250.125.6.8


16

(L = 704.06 mm) TEAM LEADER, ARCHITECT,

1 X 20.00 mm (ELDA SUSANTI, IAI)

DRAFTER,
sC-1 (Grade = 8.8)
XOX ORTHOVIEW R1.A
(WF300x150.6.5,9) (AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)
sC-1 SHEET DICIPLINE
(WF300x150.6.5,9)
skala : STRUCTURE
3.8 5.5 5.5 3.8
DETAIL A1
SHEET TITLE

5.7 18.6 5.7 ROOF DETAIL-2


STR-5.03
skala : 1 : 5 30 SCALE : As indicated

SHEET NUMBER : STR-5.03


PROJECT INFORMATION
1 X 12.00 mm y2 2 X 12.00 mm x2
(Grade = F10T) PU PU (Grade = F10T) BPBD PROVINSI KALSEL
EaB = +9.57 m EaB = +9.57 m (BADAN PENANGGULANGAN BENCANA DAERAH)
KS HT BOLT KS HT BOLT SPANDECK SHINGLES PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA

82.46 TS BANJARBARU, KALIMANTAN SELATAN 70732


EaB =
<vari e
s>
82.46 PU
EaB = +9.57 m
PERENCANAAN GEDUNG
TSvaries> 2 X 12.00 mm 2 X 12.00 mm
EaB =
< LOGISTIK BPBD KAL-SEL
PU PU (Grade = F10T) (Grade = F10T)

5
EaB = +9.27 m
EaB = +9.27 m
KS HT BOLT KS HT BOLT

6
945.59 BANJARBARU, KALIMANTAN SELATAN
TOP

12
LEGEND
13.05
7.5

7.5
Jenis bolt & anchor di gambar hanya untuk kete-
Plate (5 mm) Plate (5 mm) EaB =IA<varies> rangan posisi dan ukuran dll, sehingga tetap me-
7.5

7.5
19.6
(7.43 x 4.34 cm) (7.43 x 4.34 cm) nyesuaikan ketersediaan jenis yang ada di
pasaran/lapangan
IAvaries>

1.6

1.6
EaB =
<
1 X 12.00 mm cC = CONCRETE COLUMN
IA (Grade = F10T) sC = STEEL COLUMN
25

Plate (5 mm) RAFTER_WF250.125.6.8 Plate (8 mm) Plate (5 mm) Plate (8 mm)

25
Plate (8 mm)
(L = 442 mm)
EaB = <varies>
cB = CONCRETE BEAM
WF-Raries> KS HT BOLT
(19.4 x 7.16 cm) (42.6 x 12.5 cm) (19.4 x 7.16 cm) (23.2 x 5.95 cm)
IA (42.6 x 12.5 cm)
<v Plate (8 mm) EaB =
Plate (8 mm) sB = STEEL BEAM
SECTION B1
EaB = <vari e
s>
WF-R

EaB = <varies>
(23.2 x 5.95 cm)
PU = PURLIN

WF-R
EaB = (42.6 x 12.5 cm)
45.68 45.68 <vari e
s>
STR-5.04
skala : 1 : 5 RHS = RECTANGLE HOLLOW STEEL
B1 2 X 12.00 mm RAFTER_WF250.125.6.8 C = CANAL/CNP
DETAIL R1.B STR-5.04
(Grade = F10T)
(L = 442 mm)
IA = WIND BRACING
TS Ø10
STR-5.02
skala : 1 : 10 KS HT BOLT Trak Stang (IKATAN ANGIN)
3.75 5 3.75
EaB U
P TS = TRACKSTANG
=+ PU 12.5
9.57
m
E aB
= +9.2
7m
iF = ISOLATED FOUNDATION
EaB = ELEVATION at BOTTOM
WF-R EaT = ELEVATION at TOP

Ikat
PU

IAAngin D16
a
.125.6.8

n
RAFTER_WF250
EaB = +9.57 m TS 0
Trak Stang Ø1

TS 0
Trak Stang Ø1

Plate (5 mm)
(7.43 x 4.34 cm)

PU Plate (5 mm)
CNP 150.12,2 (19.4 x 7.16 cm)
Ikatan
IA
A ngin D
IA 16

Ikatan Angin D16 Plate (8 mm)


(23.2 x 5.95 cm)

TS RAFTER_WF250.125.6.8 RHS PLANNER CONSULTANT


Trak Stang Ø10 Plate (8 mm) (L = 442 mm) 5
(42.6 x 12.5 cm)
EaB
= +8.6
0.30
8m

Plate (8 mm) TEAM LEADER, ARCHITECT,


WF-R (23.2 x 5.95 cm)
RAFTER_WF250.125.6.8 (ELDA SUSANTI, IAI)

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

TS IA LIGHTS HANGER STRUCTURE


Trak Stang Ø10 Ikatan Angin D16 ORTHOVIEW R1.B SHEET TITLE

skala : ROOF DETAIL-3


SCALE : As indicated

SHEET NUMBER : STR-5.04


PROJECT INFORMATION

TYPE cC1 cC2 BPBD PROVINSI KALSEL


(BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
SEGMENT AT BOTTOM SUPPORT MIDSPAN TOP SUPPORT BOTTOM SUPPORT MIDSPAN TOP SUPPORT JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

40 40 40 30 30 30
PERENCANAAN GEDUNG
CROSS LOGISTIK BPBD KAL-SEL
SECTION

40

40

40

30

30

30
(scale 1:20)
BANJARBARU, KALIMANTAN SELATAN

LEGEND
DIMENSION 40 x 40 cm 40 x 40 cm 40 x 40 cm 30 x 30 cm 30 x 30 cm 30 x 30 cm Jenis bolt & anchor di gambar hanya untuk kete-
CORNER BARS 4 D16 4 D16 4 D16 4 D16 4 D16 4 D16 rangan posisi dan ukuran dll, sehingga tetap me-
nyesuaikan ketersediaan jenis yang ada di
SIDE BARS 12 D16 12 D16 12 D16 4 D16 4 D16 4 D16 pasaran/lapangan

STIRRUPS/BEUGEL Ø8 @15 Ø8 @15 Ø8 @15 Ø8 @15 Ø8 @15 Ø8 @15 cC = CONCRETE COLUMN


SHELL THICKNESS 30 mm 30 mm 30 mm 30 mm 30 mm 30 mm sC = STEEL COLUMN
cB = CONCRETE BEAM
sB = STEEL BEAM
PU = PURLIN
TYPE cC3 RHS = RECTANGLE HOLLOW STEEL
SEGMENT AT BOTTOM SUPPORT MIDSPAN TOP SUPPORT C = CANAL/CNP
IA = WIND BRACING
(IKATAN ANGIN)
12 12 12 TS = TRACKSTANG
CROSS
SECTION iF = ISOLATED FOUNDATION
12

12

12
(scale 1:20) EaB = ELEVATION at BOTTOM
EaT = ELEVATION at TOP

DIMENSION 12 x 12 cm 12 x 12 cm 12 x 12 cm
CORNER BARS 4 Ø10 4 Ø10 4 Ø10
SIDE BARS --- --- ---
STIRRUPS/BEUGEL Ø6 @15 Ø6 @15 Ø6 @15
SHELL THICKNESS 25 mm 25 mm 25 mm

TYPE sC1 sC2


SEGMENT AT BOTTOM SUPPORT MIDSPAN TOP SUPPORT BOTTOM SUPPORT MIDSPAN TOP SUPPORT
PLANNER CONSULTANT
15 15 15 10.1 10.1 10.1
CROSS
TEAM LEADER, ARCHITECT,
SECTION
25.1

25.1

25.1
30

30

30

(ELDA SUSANTI, IAI)


(scale 1:20)
DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

SHEET DICIPLINE

DIMENSION 300x150x6x5,9 300x150x6x5,9 300x150x6x5,9 250x100x4,5x5,3 250x100x4,5x5,3 250x100x4,5x5,3 STRUCTURE


CORNER BARS --- --- --- --- --- --- SHEET TITLE

STRUCTURE DETAIL - 1
SIDE BARS --- --- --- --- --- ---
STIRRUPS/BEUGEL --- --- --- --- --- --- SCALE : As indicated

SHELL THICKNESS --- --- --- --- --- --- SHEET NUMBER : STR-6.01
PROJECT INFORMATION

MARK cB1 cB2 BPBD PROVINSI KALSEL


SEGMENT AT LEFT SUPPORT MIDSPAN RIGHT SUPPORT LEFT SUPPORT MIDSPAN RIGHT SUPPORT (BADAN PENANGGULANGAN BENCANA DAERAH)
PROVINSI KALIMANTAN SELATAN
JL. BANGUN PRAJA NO.2, PALAM, CEMPAKA
BANJARBARU, KALIMANTAN SELATAN 70732

25 25 25
20 20 20
PERENCANAAN GEDUNG
CROSS
LOGISTIK BPBD KAL-SEL
SECTION

40

40

40

25

25

25
(scale 1:20)
BANJARBARU, KALIMANTAN SELATAN

LEGEND

DIMENSION (W x D) 25 x 40 cm 25 x 40 cm 25 x 40 cm 20 x 25 cm 20 x 25 cm 20 x 25 cm Jenis bolt & anchor di gambar hanya untuk kete-


rangan posisi dan ukuran dll, sehingga tetap me-
TOP BARS 3 D16 3 D16 3 D16 3 D13 2 D13 3 D13 nyesuaikan ketersediaan jenis yang ada di
pasaran/lapangan
SIDE BARS/TORSION 2 D16 2 D16 2 D16 --- --- ---
cC = CONCRETE COLUMN
BOTTOM BARS 2 D16 2 D16 2 D16 2 D13 3 D13 2 D13
sC = STEEL COLUMN
STIRRUPS/BEUGEL Ø8 - 10 Ø8 - 10 Ø8 - 10 Ø8 - 10 Ø8 - 10 Ø8 - 10 cB = CONCRETE BEAM
SHELL THICKNESS 30 mm 30 mm 30 mm 30 mm 30 mm 30 mm sB = STEEL BEAM
PU = PURLIN
RHS = RECTANGLE HOLLOW STEEL
C = CANAL/CNP
IA = WIND BRACING

40

25
LEFT SUPPORT

LEFT SUPPORT
(IKATAN ANGIN)
TS = TRACKSTANG
10 10 10 10 10 10 10 10 10 iF = ISOLATED FOUNDATION
10 10 10 10 10 10 10 10 10 EaB = ELEVATION at BOTTOM
COLUMN - W
COLUMN - W EaT = ELEVATION at TOP
LONGITUDINAL SECTION
SCALE 1:20

MIDSPAN

MIDSPAN
40

25
15 15 15 15 15 15 15 15
15 15 15 15 15 15 15 15

PLANNER CONSULTANT

TEAM LEADER, ARCHITECT,

(ELDA SUSANTI, IAI)


RIGHT SUPPORT

RIGHT SUPPORT
40

25

DRAFTER,

(AR. INDRA BAYU, PYR, IAI) (ALFIAN NOOR)

10 10 10 10 10 10 10 10 10 SHEET DICIPLINE

10 10 10 10 10 10 10 10 10 STRUCTURE
COLUMN - W
COLUMN - W SHEET TITLE

STRUCTURE DETAIL - 2
SCALE : As indicated

SHEET NUMBER : STR-6.02

You might also like