Optix RTN 900 Microwave Acceptance Test

ACCEPTANCE TEST DATA

CX to RTN PORT/BOARD EXPANSION

STATION ID : 091304

STATION Name : Sukamahi

PROJECT : Port 2020

WPO No. : -

ATP DATE : 01-April-20


Optix RTN 900 Microwave Acceptance Test

CX to RTN Port/Board Expansion Check

Site ID Site Name IDU Port CX Port Info

091304 Sukamahi

Port Utilization Capture:


1. Capture Port Utilization Before

2. Capture Port Utilization After


Optix RTN 900 Microwave Acceptance Test

Capture and Photo Attachment

1. Board and Port Photo Before and after (RTN Side)

2. Board and Port Photo Before and after (CX Side)

3. Capture Troughtput/Utilization port Before and After (RTN side)

4.
Optix RTN 900 Microwave Acceptance Test

RTN to CX PORT/BOARD Expansion Acceptance TestSign-off Information


The acceptance of RTN to CX Port/Board expansion had been carried out in accordance to the
H3I requirements and that the test report presents a fair and true statement of test results.

Subcontractor PT. Huawei Tech Investment Managed Services

Name: ------------------------ -------------------------- ---------------------------

Date: ------------------------ -------------------------- ---------------------------

PT. Hutchinson 3 Indonesia

Name: ------------------------ Date:


------------------------