The document summarizes an acceptance test for expanding ports and boards between an Optix RTN 900 microwave and a CX system. It lists the station ID and name, project, work order number, and ATP date. It then provides details on checking the CX to RTN port/board expansion, including site information and port utilization captures before and after. Photos were also taken of the boards and ports before and after on both the RTN and CX sides. Port throughput and utilization were captured before and after on the RTN side as well. Sign-off information is provided to confirm the test was completed according to requirements.
The document summarizes an acceptance test for expanding ports and boards between an Optix RTN 900 microwave and a CX system. It lists the station ID and name, project, work order number, and ATP date. It then provides details on checking the CX to RTN port/board expansion, including site information and port utilization captures before and after. Photos were also taken of the boards and ports before and after on both the RTN and CX sides. Port throughput and utilization were captured before and after on the RTN side as well. Sign-off information is provided to confirm the test was completed according to requirements.
The document summarizes an acceptance test for expanding ports and boards between an Optix RTN 900 microwave and a CX system. It lists the station ID and name, project, work order number, and ATP date. It then provides details on checking the CX to RTN port/board expansion, including site information and port utilization captures before and after. Photos were also taken of the boards and ports before and after on both the RTN and CX sides. Port throughput and utilization were captured before and after on the RTN side as well. Sign-off information is provided to confirm the test was completed according to requirements.
STATION Name : Kampung Kranggan Kulon - Jati Raden
PROJECT : Port 2020
WPO No. : -
ATP DATE : 18-September-2020
Optix RTN 900 Microwave Acceptance Test
CX to RTN Port/Board Expansion Check
Site ID Site Name IDU Port CX Port Info
094324 Kampung Kranggan Kulon
Port Utilization Capture:
1. Capture Port Utilization Before
2. Capture Port Utilization After
Optix RTN 900 Microwave Acceptance Test
Capture and Photo Attachment
1. Board and Port Photo Before and after (RTN Side)
2. Board and Port Photo Before and after (CX Side)
3. Capture Troughtput/Utilization port Before and After (RTN side)
Optix RTN 900 Microwave Acceptance Test
RTN to CX PORT/BOARD Expansion Acceptance TestSign-off Information
The acceptance of RTN to CX Port/Board expansion had been carried out in accordance to the H3I requirements and that the test report presents a fair and true statement of test results.
Subcontractor PT. Huawei Tech Investment Managed Services