You are on page 1of 3

FINISHING SUPERINTENDENT / Q.A.

INSPECTOR

Physical Demands Job Analysis Form


January 2023

Work Area: Interior of bldgs; parkades; main office

I. Brief Job Description

Organize all interior sub-trades


Confirm the construction schedule with each building under construction and report findings
to Site Super
Receive final municipal occupancy inspection at a minimum of one week prior to home owner
closing
Ensure home is 100% complete for home owner walkthrough
Conduct walk through one week prior to home owner occupancy
Complete all deficiencies on home owner walk through before home owner occupancy
Coordinate with sub trades to have all sub trade deficiencies completed
Have home 100% complete for home owner upon occupancy
Hand over home to home owner on occupancy date

II. Job Tasks/Essential Functions

III. Tools/Equipment
Task light Beam level Laptop
Measuring tape Tablet
IV. Hazards/Environment
Hazards
Environment

V. Physical Demands (Requirements)


Total Hours in 8-Hr Total Hours in 8-Hr
Day Day
Body Movements 0-1 1-3 3-6 6-8
Physical 0-1 1-3 3-6 6-8
R O F C R O F C

Bend at Waist Lift 1-10 lbs

Twist Upper Body 11-19


lbs
Kneel --- --- --- --- 20-49 --- --- --- ---
lbs
Walk-Uneven Surface 50+ lbs --- --- --- ---
Climb --- --- --- --- Carry 1-10 lbs

Reach Above 11-19


Shoulder lbs
Repetitive Use of 20-49 --- --- --- ---
Hands lbs
a) Squeezing 50+ lbs --- --- --- ---
b) keyboarding Push 1-10 lbs

Operate Foot Controls --- --- --- --- 11-19


lbs
Endurance --- --- --- --- 20-49 --- --- --- ---
lbs
Sit 50+ lbs --- --- --- ---
Stand Pull 1-10 lbs

Walk 11-19
lbs
Talking 20-49 --- --- --- ---
lbs
Hearing 50+ lbs --- --- --- ---
R= Rare (1%) O=Occasional (1-33%) F=Frequently (33-66%) C=Continuously (66-100%)

You might also like