Hoist Speed, Alarm Settings, and Reminder Card.

Please print and post in sight of the hoist operator as a reference.


MAXIMUM ALLOWABLE Running Speed
Downhole Condition ft/min m/min

Through Casing 500 150


Open Hole 150 45
Through G.I.T. 250 75
Within 100 ft. of surface, TD, restrictions, etc. 50 15
Tension Alarms and Shutdowns limits MUST be adjusted each 2000 ft (600 m) Alloy Cables maximum RIH/POOH speed is 100 ft/min (30m/min)
Shutdown and Alarms
Rig up/Rig down
Tension Definition Tensile Bar Cable Head OTA (A3, A2, Universal)
Differential ten. (TEN) ALARM Tool Weight + 500 lbs Tool Weight + 250 lbs
Diff. ten. (TEN) SHUTDOWN Tool Weight + 1000 lbs (<50% WP-Low) Tool Weight + 500 lbs (<25% WP-Low)
Total ten. (TTEN) ALARM Tool Weight + 500 lbs Tool Weight + 250 lbs
Total ten. (TTEN) SHUTDOWN Tool Weight + 1000 lbs (<50% WP-Low) Tool Weight + 500 lbs (<25% WP-Low)
Cablehead ten. (CHT) Tool Weight + 500 lbs (<50% WP-Low) NA
-- RIH POOH RIH POOH
Differential ten. (TEN) ALARM 300 lbs 300 lbs 250 lbs 250 lbs
Diff. ten. (TEN) SHUTDOWN 1000 lbs 1000 lbs 500 lbs 500 lbs
Total ten. (TTEN) ALARM LOW 500 lbs below RIH ten. NA 250 lbs below RIH ten. NA
1000 lbs above POOH ten. 250 lbs above POOH ten.
Total ten. (TTEN) ALARM HIGH 500 lbs above RIH ten. 250 lbs above RIH ten.
(<50% WP-Low) (<25% WP-Low)
1500 lbs above POOH ten. 500 lbs above POOH ten.
Total ten. (TTEN) SHUTDOWN 1000 lbs above RIH ten. 500 lbs above RIH ten.
(<50% WP-Low) (<25% WP-Low)
Cablehead ten. (CHT) LOW 200 lbs below RIH ten. 200 lbs below POOH ten. NA NA
Cablehead ten. (CHT) HIGH <70% WP-Low <70% WP-Low NA NA
Reminders
BEFORE RIH:
-10 K Load Cell Test. IN CASE OF ANY UNCERTANTIES/FAULTY READINGS - DO NOT MOVE WINCH BEFORE FIXING ISSUE. Post Cerberus Winchman Sheet. Use Z-WRAP CHART. ONLY 'LOW" SPEED DURING RIG UP
-Make sure your mechanical encoder, the hoist panel, and the logging system depths match.
BEFORE POOH:
-Stop at 200 ft coming out of the hole for safety meeting, regardless of service type. The FS/FE must take over hoisting duties while pulling tools to surface. NO DISTRACTIONS of ANY KIND
Torque Valve Procedure (adjust every 500 ft):
- Turn the valve anticklockwise until the hoist starts to slow down and then turn the valve about 1/2 turn clockwise
- Repeat this every 500 ft (150M)