SK ST ND02 313
SK ST ND02 313
L
H
H
NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
OTHERWISE STATED.
N
M.J.
EXISTING FOOTBRIDGE LINK BRIDGE
SB1 LEGEND :
SC1 SC1
GRANOLITHIC SURFACING OF
SB1
SB1
LIFT SHAFT +21.400 EXISTING DITCH 25x20 JOINT SEALANT
2300x2300 GRANOLITHIC
SURFACING OF
EXISTING S.S. FLASHING PANEL THE LINK BRIDGE
GRANOLITHIC
SURFACING OF
FOOTBRIDGE
100o DOWN PIPE
250
SP1 SB1 SP1
SC1 SC1
1% FALL
SB2
SB2
DITCH
1625
2000
100x100x8 RSA
WITH FILLET WELD
SB4 SB4
EXISTING FOOTBRIDGE
25x20 JOINT SEALANT
DRAINAGE DOWNPIPE SB3
SP2 SP2 SB4
TO BE VERIFIED ON SITE
M.J.
125
25
SECTION A (DECK LEVEL)
D
2710
C
PARAPET WALL TO BE
-
A
-
MODIFIED
M.J.
EXISTING FOOTBRIDGE LINK BRIDGE
SITE SKETCH
25mm JOINT FILLER
FALL
EXISTING REINFORCEMENT
TO BE RETAINED EXISTING HORIZONTAL EXISTING HORIZONTAL
REINFORCEMENT TO BE CUT REINFORCEMENT TO BE
EXISTING PARAPET WALL RETAINED SB4
TO BE REMOVED
2460
EXISTING 60x60x5 EA
VERTICAL WITH FILLET WELD
REINFORCEMENT 25x20 JOINT SEALANT
TO BE CUT
Client
路政署
STRUCTURAL FINISH LEVEL Highways Department
EXISTING PARAPET WALL Major Works Project
TO BE REMOVED
DETAIL B Management Office
EXISTING Consultants
VERTICAL
REINFORCEMENT
TO BE RETAINED
ELEVATION
SCALE 1 : 25 Scale in A3 Date
AS SHOWN
JUL 2023
SURFACE TO BE SCABBLED APPLY APPROVED NON-SHRINK
CEMENT GROUT TO MAKE GOOD Designed Drawn Checked
SURFACE MC IC JT
30 MIN.
SURFACE TO BE SCABBLED DETAIL A
APPLY APPROVED
CUT POINT OF NON-SHRINK Project
VERTICAL REINFORCEMENT CEMENT GROUT TO
MAKE GOOD SURFACE CONTRACT NO. HY/2022/08
EXISTING REINFORCEMENT
EXISTING REINFORCEMENT
TO BE RETAINED
TO BE RETAINED PROVISION OF UNIVERSAL ACCESSIBILITY
FACILITIES AT FOOTBRIDGES,
ELEVATED WALKWAYS AND SUBWAYS -
EXISTING REINFORCEMENT
TO BE RETAINED PACKAGE 6 CONTRACT 2
CUT POINT OF
HORIZONTAL REINFORCEMENT
Title
DETAIL B
Drawing No. Stage Rev.
SCALE 1 : 5
DETAIL A
SCALE 1 : 5 SK/ST/ND02/313 S -