PRESSURIZATION UNIT CHECKLIST

SL YES NO REMARKS
NO. DESCREPTION

Whether the technical submittal is


1.
submitted for approval/approved.

Whether the general arrangement


2. drawing is submitted for
approval/approved.

Whether the pressurization unit supplied


3.
is of approved make.

Whether the pressurization unit supplied


4.
is of approved specification.

Whether the pressurization unit supplied


5.
is having proper invoice/delivery Chelan.

Whether the pressurization unit supplied


6.
is having factory test certificate.

Whether the pressurization unit is


7. supplied with proper packing & with no
damage to the packing.

Whether the pressurization unit packing


is properly removed without any
8. damage to the pressurization unit /
pressurization unit accessories during
erection.

Whether the lifting/shifting of


pressurization unit is done as per
9.
manufacturer’s instruction during
erection.

Whether the pressurization unit base is


10. provided at site as per manufacturer’s
instruction.

Whether the positioning of


14.
pressurization unit is done properly.

15. Whether any damage occurred during


pressurization unit

Page 1 of 2
lifting/moving/positioning etc.

Whether all safety measures taken


16.
during pressurization unit erection.

Whether the pressurization unit testing


17. & commissioning is done as per
manufacturer’s instructions.

Whether the testing & commissioning is


18. done by authorized
engineers/technicians.

Whether the testing & commissioning


18.
report is submitted by testing authority.

HLL CONTRACTOR

NAME NAME

PLACE PLACE

DATE DATE

SIGINATURE SIGINATURE

DESIGINATION DESIGINATION