VALVES CHECKLIST

SL YES NO REMARKS
NO. DESCREPTION

Whether the technical submittal is


1.
submitted for approval/approved.

Whether the valves supplied is of


2.
approved make.

Whether the valves supplied is of


3.
approved specification.

Whether the valves supplied is having


4.
proper invoice/delivery Chelan.

Whether the valves supplied is having


5.
factory test certificate.

Whether the valve is supplied without


6.
damage.

Whether the valve installation done as


7.
per specification.

Whether the valve installation is done by


8.
skilled labour/technician/fitter.

Whether the valves were installed


10.
without any damage to the valve/pipe.

Whether the valves were insulated after


11.
testing.

Whether the pressure testing of valves


12.
were completed as per specification.

Whether the testing & commissioning is


13. done by authorized
engineers/technicians.

Whether the testing & commissioning


18.
report is submitted by testing authority.

HLL CONTRACTOR

Page 1 of 2
NAME NAME

PLACE PLACE

DATE DATE

SIGINATURE SIGINATURE

DESIGINATION DESIGINATION