HVAC HYDRONIC PIPING

QUALITY CONTROL REPORT

Project Title: Date:


Building/Structure: Report No.:
INSTRUCTIONS: Before making inspections, the quality-control inspector should have reviewed the drawings
and specifications and should be sure that he understands them. Clarify all questions with the engineering office
that prepared them. Provide a copy of the completed report to the construction overseer, quality-control
coordinator, and any others as directed.

ITEM(S) COVERED BY THIS TEST

CHECKLIST
1.  Yes  No  N/A Have the systems been installed in accordance with the drawings and
specifications?
If no, please explain why:

2.  Yes  No  N/A Are the systems ready to be tested, adjusted, and balanced?
3.  Yes  No  N/A Has the system been cleaned and thoroughly flushed?
4.  Yes  No  N/A Have the systems been hydrostatically tested before insulation was applied and
are they free of leaks?
5.  Yes  No  N/A Are all balancing devices, flow meters, and terminal units readily accessible?
6.  Yes  No  N/A Is the system water level and pressure correct for the highest terminal units?
7.  Yes  No  N/A Have the proper piping safety devices been installed, such as pressure safety
reliefs, make-up regulators?
8.  Yes  No  N/A Does piping allow for thermal expansion and contraction?
9.  Yes  No  N/A Where applicable, has protection against seismic movement been incorporated?
10.  Yes  No  N/A Are all pipes and valves clearly marked for easy identification?
11.  Yes  No  N/A Have air separators and eliminators been installed?

Signature of Quality-Control Inspector Signature of Crew Overseer

Quality Control Report HVAC Hydronic Piping