Professional Documents
Culture Documents
CHECKLIST
1. Yes No N/A Have all pumps been checked?
2. Yes No N/A Does the equipment match the specifications?
3. Yes No N/A Are all bearings lubricated if required?
4. Yes No N/A Is the rotation free and correct?
5. Yes No N/A Are motors aligned and fastened securely? Have couplings been aligned?
6. Yes No N/A Have pump bases been correctly grouted?
7. Yes No N/A Has air been bled from the pump casing where required?
8. Yes No N/A Are all drive-set screws and keyways tight?
9. Yes No N/A Are the vibration-isolation and flexible pipe connectors in their proper positions
and aligned?
10. Yes No N/A Is all equipment clean and free of foreign objects?
11. Yes No N/A Are drive guards in place?
12. Yes No N/A Has access been provided for pressure and/or temperature readings across the
pump and/or across the strainers?
13. Yes No N/A Are the motor starters equipped with thermal-overload protection of the proper
size?
14. Yes No N/A Have the locations of all start-stop stations, disconnect switches, electrical
interlocks, and motor starters been marked?
15. Yes No N/A Have the availability of electrical power to all equipment and the compatibility of
voltage and phase been checked?
16. Yes No N/A Are all strainers clean?
17. Yes No N/A Have air separators been installed and has proper functioning been confirmed?