INSPECTION CHECK LIST

ZARA STORAGE Document No.:


Revision: 0
MOE Date:
Page 1 of 1

INSPECTION CHECK LIST FOR INSTALLATION OF FAHU

Location / Area:

Sr. No. Description Yes No Remarks


Ensure that the MIR has been raised for consultant approval
1
before installation at site.
Ensure that the materials are as per approved material submittal.
Ensure that the Mechanical /structural damage during
2
transportation to location.

Check correct model, location & orientation of Units are as per


3 approved shop drawings

Check the provision for U-trap for condensate pipe connection


4 with necessary slope.

Ensure that the sizes of the installed chilled water pipes & valves
connected to the equipment as per approved shop drawings.
5
.

6 Check that the AHU / FAHU sections are fitted properly

7 Check the gaskets are provided in the modules prior to tighten it.

8 Check all the power cabling & control wiring is complete


Check and ensure adequate clearance available for service
9 maintenance and removal of parts.

Check the cooling coils are clean and combed.


10

11 Check that identification labels are provided in the units.

PM/PE NAME : SIGN :

QA/QC ENGINEER NAME : SIGN :

SUPERVISOR/FORMAN NAME : SIGN :

Comments / Remarks, if any:


Representative: ALEMCO CONSULTANT

Signature

Name
Date