ADIA CAMPUS EXPANSION

RELOCATION WORKS

Document No.:

Inspection Check List for Interlock Concrete Pavers Installation

Location / Area: Abu-Dhabi / W1:C17, C19

Engineer Sign off


S. No Activities / Items to be Inspected
YES NO N/A
1. Check that interlock to be used for installation have approved submittals
2. Check the relevant method statement is approved.
3. Check the drawings used for installation are latest and approved.
4. Check the materials are new and undamaged.
Check the interlock bedding sand and jointing sand as per approved
5
specifications
6 Check the laying material level configuration is as per approved drawing.
7 Check the Installation are done correctly (as per approved methods)
8 Check the lines level of the interlock work as per approved shop drawing
and within the tolerance limit.
12 Check cleanliness of the Installation Area.

Comments / Remarks, if any:

Representative: HEPTON (Site Engr.) HEPTON (QA/QC) DAR AL HANDASAH


Signature
Name
Date