1. TITIK BUHUL - A
1.1 Profil A1
N = 1,931.80 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 1,931.80
Jumlah Paku = = = 2.46 Bh = 3.00 Bh = 3.00 Bh
Pds 784.00
1.2 Profil B1
N = 1,162.94 Kg (+)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 1,162.94
Jumlah Paku = = = 2.70 Bh = 3.00 Bh = 3.00 Bh
Pgs 430.00
A
B.1
Pelat Buhul t = 8 mm
Perletakan Sendi
0.25
0.50
Kolom 40/40
Talang Datar
TUGAS WAJIB KONSTRUKSI BAJA
N 1,162.94
Jumlah Paku = = = 2.70 Bh = 3.00 Bh = 3.00 Bh
Pgs 430.00
1.2 Profil V1
N = 0.00 Kg (+)
B.1 B.2
C
Pelat Buhul t = 8 mm
Paku dia. 8 mm
TUGAS WAJIB KONSTRUKSI BAJA
N 1,162.94
Jumlah Paku = = = 2.70 Bh = 3.00 Bh = 3.00 Bh
Pgs 430.00
3.2 Profil D6
N = 0.00 Kg (+)
B.1 B.2
N
Pelat Buhul t = 8 mm
Paku dia. 8 mm
TUGAS WAJIB KONSTRUKSI BAJA
N 320.34
Jumlah Paku = = = 0.74 Bh = 1.00 Bh = 3.00 Bh
Pgs 430.00
4.2 Profil D6
N = 0.00 Kg (+)
4.3 Profil V4
N = 304.64 Kg (+)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 304.64
Jumlah Paku = = = 0.39 Bh = 1.00 Bh = 3.00 Bh
Pds 784.00
4.4 Profil H2
N = 99.98 Kg (+)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 99.98
Jumlah Paku = = = 0.13 Bh = 1.00 Bh = 3.00 Bh
Pds 784.00
V.4
L H.2
Paku dia. 8 mm
Pelat Buhul t = 8 mm
TUGAS WAJIB KONSTRUKSI BAJA
N 1,931.80
Jumlah Paku = = = 2.46 Bh = 3.00 Bh = 3.00 Bh
Pds 784.00
5.2 Profil A2
N = 1,946.01 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 1,946.01
Jumlah Paku = = = 2.48 Bh = 3.00 Bh = 3.00 Bh
Pds 784.00
5.3 Profil V1
N = 0.00 Kg (+)
5.4 Profil H1
N = 99.98 Kg (+)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 99.98
Jumlah Paku = = = 0.13 Bh = 1.00 Bh = 3.00 Bh
Pds 784.00
Paku dia. 8 mm D
H.1
Pelat Buhul t = 8 mm
V.1
TUGAS WAJIB KONSTRUKSI BAJA
N 1,972.60
Jumlah Paku = = = 2.52 Bh = 3.00 Bh = 3.00 Bh
Pds 784.00
6.2 Profil A3
N = 3,622.93 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 3,622.93
Jumlah Paku = = = 4.62 Bh = 5.00 Bh = 5.00 Bh
Pds 784.00
6.3 Profil V2
N = 304.64 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 304.64
Jumlah Paku = = = 0.71 Bh = 2.00 Bh = 2.00 Bh
Pgs 430.00
6.4 Profil A4
N = 701.50 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 701.50
Jumlah Paku = = = 0.89 Bh = 2.00 Bh = 2.00 Bh
Pds 784.00
A.4
Paku dia. 8 mm
Pelat Buhul t = 8 mm
V.1
TUGAS WAJIB KONSTRUKSI BAJA
N 701.50
Jumlah Paku = = = 0.89 Bh = 2.00 Bh = 2.00 Bh
Pds 784.00
7.1 Profil A5
N = 203.63 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 203.63
Jumlah Paku = = = 0.26 Bh = 1.00 Bh = 2.00 Bh
Pds 784.00
H
Paku dia. 8 mm
Pelat Buhul t = 8 mm
A.4
8. TITIK BUHUL - i
8.1 Profil A5
N = 203.63 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 203.63
Jumlah Paku = = = 0.26 Bh = 2.00 Bh = 2.00 Bh
Pds 784.00
8.2 Profil A5
N = 203.63 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 203.63
Jumlah Paku = = = 0.26 Bh = 1.00 Bh = 2.00 Bh
Pds 784.00
I
Paku dia. 8 mm
Pelat Buhul t = 8 mm
A.5 A.6
9. TITIK BUHUL - P
9.1 Profil A3
N = 3,622.93 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 3,622.93
Jumlah Paku = = = 4.62 Bh = 5.00 Bh = 5.00 Bh
Pds 784.00
9.2 Profil D5
N = 320.34 Kg (+)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 320.34
Jumlah Paku = = = 0.74 Bh = 3.00 Bh = 3.00 Bh
Pds 430.00
9.3 Profil D3
N = 136.43 Kg (+)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 136.43
Jumlah Paku = = = 0.32 Bh = 3.00 Bh = 3.00 Bh
Pds 430.00
9.4 Profil V3
N = 68.83 Kg (-)
Pds = 784.00 Kg/cm2
Pgs = 430.00 Kg/cm2
N 68.83
Jumlah Paku = = = 0.16 Bh = 2.00 Bh = 2.00 Bh
Pgs 430.00
TUGAS WAJIB KONSTRUKSI BAJA
V.3