1. This is a subcontractor materials reconciliation form for PT. AGUNA SATYA MULYA for work done in the Pontianak witel including procurement, withdrawal and installation of OSP FO for several Node-B sites.
2. It lists 7 job order numbers, site names and IDs for work completed and reconciles the quantities of materials taken from the Fiberhome warehouse, materials used, and materials returned with notes on any excess or shortages.
3. Signatures from both
1. This is a subcontractor materials reconciliation form for PT. AGUNA SATYA MULYA for work done in the Pontianak witel including procurement, withdrawal and installation of OSP FO for several Node-B sites.
2. It lists 7 job order numbers, site names and IDs for work completed and reconciles the quantities of materials taken from the Fiberhome warehouse, materials used, and materials returned with notes on any excess or shortages.
3. Signatures from both
1. This is a subcontractor materials reconciliation form for PT. AGUNA SATYA MULYA for work done in the Pontianak witel including procurement, withdrawal and installation of OSP FO for several Node-B sites.
2. It lists 7 job order numbers, site names and IDs for work completed and reconciles the quantities of materials taken from the Fiberhome warehouse, materials used, and materials returned with notes on any excess or shortages.
3. Signatures from both
Pengadaan Penarikan Dan Pemasangan OSP FO Node-B Site KTP102 Ketapang WITEL KALBAR MRF No.:FH-ASM-…............-….............. Num PO Num Site Name Site ID 1 ID-TA-AGUNA-0482-OS KTP118 REG06-0633 2 ID-TA-AGUNA-0472-OS KTP067 REG06-0632 3 ID-TA-AGUNA-0471-OS KTP066 REG06-0631 4 ID-TA-AGUNA-0454-OS KTP107 REG06-0640 5 ID-TA-AGUNA-0455-OS KTP107-01 REG06-0640-01 6 ID-TA-AGUNA-0456-OS KTP107-02 REG06-0640-02 7 ID-TA-AGUNA-0457-OS KTP107-03 REG06-0640-03 8 ID-TA-AGUNA-0458-OS KTP107-04 REG06-0640-04 Here only mention 1. positive no. 1. Materials taken mateirals quantity Materials lend to means materials lost Description from FH warehouse Materials Quantity already returned to FH other subcon, must Materials still in by subcon Explanation of GAP 2. Materiasl taken in as built BOQ warehouse, if materials have BA of subcon wareshoue 2. negative from other subcon not yet return, mention materials handover no.means maetials in actual stock overlap
Materials Quantity Materials Quantity Materials Returned Materials lend to
Code Description Unit Actual Stock GAP Remark in MRF in as built BOQ Quantity other subcon
8 FNA-TA-04 Telephone Pole 7 Meter PCS 18 18 0 0
101 m FH's Material, return to WH 10 FNA-TA-23 40/33 HDPE M 34,000 33,899 101 0 Ketapang (small cut) 55 m FH's Material, return to WH 15 GYTA-12 DC-OF-SM-12D M 1,100 1,045 55 0 Ketapang (small cut) 2,776 m FH's Material, return to WH 16 GYTA-24 DC-OF-SM-24D M 36,000 33,224 2,776 0 Ketapang (small cut) 130 m FH's Material, return to WH 23 GYTC8A-12 AC-OF-SM-12D M 800 670 130 0 Ketapang (small cut)